If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0636050104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.414901,"lon":-118.603437,"icon":""}]} |
| Location: 00/04-01-063-05W6/0 | |
| Location Alias: 00/04-01-63-05 W6M | |
| Location Alias 2: 00/04-01-063-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 01 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: 7GEN HZ KAKWA 4-1-63-5 | |
| Operator Name: Seven Generations Energy Ltd. | |
| License Number: 0445311 | |
| License Date: 2012-04-10 | |
| License Status: Issued | |
| Spud Date: 2012-04-23 | |
| Final Drill Date: 2012-05-10 | |
| Well Total Depth: 4005.00 m | |
| Surface Hole Latitude: 54.414901 | |
| Surface Hole Longitude: -118.603437 |
| Date | Event |
|---|---|
| 2012-04-10 | Obtained License |
| 2012-04-25 | Surface Casing Operation Performed |
| 2012-04-30 | Direction Drilling Operation Performed - Deviate |
| 2012-05-03 | Direction Drilling Operation Performed - Horizontal |
| 2012-05-04 | Intermediate Casing Operation Performed |
| 2012-05-05 | Well Log Performed |
| 2012-05-10 | Finished Drilling |
| 2012-05-10 | Well Mode changed to Drilled and Cased |
| 2012-05-14 | Liner Casing Operation Performed |
| 2012-05-14 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-05-15 | Rig Released |
| 2012-07-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-20 | Well Began Production |
| 2012-10-20 | Well Fluid changed to Gas |
| 2012-10-20 | Well Mode changed to Flowing |
| 2016-10-01 | Well Fluid changed to Gas |
| 2016-10-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-04-23 | EUB-New Rig Drilling Contractor | 1 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-04-30 | 2327.00 | Deviate (5 - 79 degrees) |
| 2012-05-03 | 2739.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-05-14 | Open Hole/Barefoot Completion | 4004.00 | 4005.00 | 0 |
| 2012-07-23 | Multi-Stage Fracture | 3241.40 | 3242.20 | 0 |
| 2012-07-23 | Multi-Stage Fracture | 3128.40 | 3129.20 | 0 |
| 2012-07-23 | Multi-Stage Fracture | 3029.00 | 3029.80 | 0 |
| 2012-07-23 | Multi-Stage Fracture | 2929.40 | 2930.20 | 0 |
| 2012-07-23 | Multi-Stage Fracture | 2857.20 | 2858.00 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3990.70 | 3992.00 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3938.30 | 3939.10 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3838.70 | 3839.50 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3739.10 | 3740.00 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3639.50 | 3640.30 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3539.90 | 3540.70 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3440.50 | 3441.30 | 0 |
| 2012-07-22 | Multi-Stage Fracture | 3341.00 | 3341.80 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1740 | 0.0 | 0.0 | 0.0 |
| 2013 | 8021 | 0.0 | 0.0 | 0.0 |
| 2014 | 4434 | 0.0 | 0.0 | 0.0 |
| 2015 | 3852 | 0.0 | 0.0 | 0.0 |
| 2016 | 7814 | 0.0 | 0.0 | 0.0 |
| 2017 | 7341 | 0.0 | 0.0 | 0.0 |
| 2018 | 8035 | 0.0 | 0.0 | 0.0 |
| 2019 | 7858 | 0.0 | 0.0 | 0.0 |
| 2020 | 1969 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-05-10 | No Incident Encountered | 0.00 | 0.00 |
| 2012-07-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]