X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636051207000

Well Details

Well ID: 0636051207000
Loading map...
Location: 00/07-12-063-05W6/0
Location Alias: 00/07-12-63-05 W6M
Location Alias 2: 00/07-12-063-05 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 05
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: 7GEN HZ KAKWA 7-12-63-5
Operator Name: Seven Generations Energy Ltd.
License Number: 0479520
License Date: 2016-05-27
License Status: Amended
Spud Date: 2017-03-07
Final Drill Date: 2017-03-30
Well Total Depth: 5275.00 m
Surface Hole Latitude: 54.434806
Surface Hole Longitude: -118.584068

For data sources see[1][2]

Well History

Date Event
2016-05-27 Obtained License
2017-03-07 Lost Circulation Occurred
2017-03-09 Surface Casing Operation Performed
2017-03-13 Direction Drilling Operation Performed - Deviate
2017-03-21 Well Log Performed
2017-03-22 Intermediate Casing Operation Performed
2017-03-24 Direction Drilling Operation Performed - Horizontal
2017-03-28 Well Log Performed
2017-03-30 Finished Drilling
2017-03-30 Well Log Performed
2017-03-30 Well Mode changed to Drilled and Cased
2017-03-31 Well Log Performed
2017-04-01 Production Casing Operation Performed
2017-04-02 Rig Released
2017-06-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-17 Well Began Production
2017-08-17 Well Fluid changed to Gas
2017-08-17 Well Mode changed to Flowing
2018-05-09 Well Fluid changed to Gas
2018-05-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-07 Nabors Drilling Canada Limited 39 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-13 698.40 Deviate (5 - 79 degrees)
2017-03-24 3335.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-08 Multi-Stage Fracture 5234.10 5250.00 0
2017-06-12 Multi-Stage Fracture 4781.60 4782.60 0
2017-06-12 Multi-Stage Fracture 4736.20 4737.20 0
2017-06-13 Multi-Stage Fracture 4682.00 4688.00 0
2017-06-13 Multi-Stage Fracture 4632.00 4638.00 0
2017-06-13 Multi-Stage Fracture 4578.00 4584.00 0
2017-06-14 Multi-Stage Fracture 4528.00 4534.00 0
2017-06-15 Multi-Stage Fracture 4478.00 4484.00 0
2017-06-16 Multi-Stage Fracture 4427.00 4433.00 0
2017-06-16 Multi-Stage Fracture 4377.00 4383.00 0
2017-06-16 Multi-Stage Fracture 4327.00 4333.00 0
2017-06-08 Multi-Stage Fracture 5182.10 5183.10 0
2017-06-17 Multi-Stage Fracture 4276.00 4282.00 0
2017-06-17 Multi-Stage Fracture 4226.00 4232.00 0
2017-06-20 Multi-Stage Fracture 4175.00 4181.00 0
2017-06-20 Multi-Stage Fracture 4124.00 4130.00 0
2017-06-21 Multi-Stage Fracture 4074.00 4080.00 0
2017-06-21 Multi-Stage Fracture 4023.00 4029.00 0
2017-06-22 Multi-Stage Fracture 3972.00 3978.00 0
2017-06-22 Multi-Stage Fracture 3923.00 3929.00 0
2017-06-22 Multi-Stage Fracture 3872.00 3878.00 0
2017-06-22 Multi-Stage Fracture 3822.00 3828.00 0
2017-06-09 Multi-Stage Fracture 5131.80 5132.80 0
2017-06-23 Multi-Stage Fracture 3772.00 3778.00 0
2017-06-24 Multi-Stage Fracture 3721.00 3727.00 0
2017-06-25 Multi-Stage Fracture 3672.00 3678.00 0
2017-06-25 Multi-Stage Fracture 3621.00 3627.00 0
2017-06-25 Multi-Stage Fracture 3571.00 3577.00 0
2017-06-26 Multi-Stage Fracture 3520.00 3526.00 0
2017-06-26 Multi-Stage Fracture 3469.00 3475.00 0
2017-06-26 Multi-Stage Fracture 3418.00 3424.00 0
2017-06-26 Multi-Stage Fracture 3367.00 3373.00 0
2017-06-09 Multi-Stage Fracture 5081.40 5082.40 0
2017-06-10 Multi-Stage Fracture 5031.40 5032.40 0
2017-06-10 Multi-Stage Fracture 4981.00 4982.00 0
2017-06-11 Multi-Stage Fracture 4930.60 4931.60 0
2017-06-11 Multi-Stage Fracture 4880.90 4882.00 0
2017-06-12 Multi-Stage Fracture 4831.50 4832.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-08 2017-06-26 3,240 44,197 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 87.623 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 12.2653 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0089 N/A
Dibromoacetonitrile 3252-43-5 100 0.0089 N/A
Polyethylene Glycol 25322-68-3 100 0.0089 N/A
Sodium Bromide 7647-15-6 100 0.0089 N/A
Water 7732-18-5 100 0.0089 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0026 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0968 N/A
Oxyalkylated alcohol 9014 100 0.0968 N/A
Petroleum distillates 64742-47-8 100 0.0968 N/A
Polyacrylate 9014 100 0.0968 N/A
GW-3SLR BJ Services Gelling Agent Guar gum 9000-30-0 100 0.0007 N/A
Low toxicity base oils - Non-WHMIS Controlled Not Available 100 0.0007 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-08 2017-07-07 Surface Water - River 35914
2017-06-01 2017-07-07 Recycled Fracturing Water (treated at well site) 2100
2017-06-01 2017-07-07 Recycled Fracturing Water (treated at well site) 2027
2017-06-01 2017-07-07 Recycled Fracturing Water (treated at well site) 1353
2017-06-01 2017-07-07 Recycled Fracturing Water (treated at well site) 1335
2017-06-01 2017-07-07 Recycled Fracturing Water (treated at well site) 1468

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3033 0.0 0.0 0.0
2018 7874 0.0 0.0 0.0
2019 8202 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-07 Lost Circulation 105.00 120.00
2017-06-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References