X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636053013000

Well Details

Well ID: 0636053013000
Loading map...
Location: 00/13-30-063-05W6/0
Location Alias: 00/13-30-63-05 W6M
Location Alias 2: 00/13-30-063-05 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 05
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEX HZ KAKWA 13-30-63-5
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0467856
License Date: 2014-07-04
License Status: Issued
Spud Date: 2014-08-15
Final Drill Date: 2014-09-10
Well Total Depth: 4870.00 m
Surface Hole Latitude: 54.473239
Surface Hole Longitude: -118.757953

For data sources see[1][2]

Well History

Date Event
2014-07-04 Obtained License
2014-08-16 Surface Casing Operation Performed
2014-08-21 Intermediate Casing Operation Performed
2014-08-28 Direction Drilling Operation Performed - Deviate
2014-08-31 Direction Drilling Operation Performed - Horizontal
2014-09-10 Finished Drilling
2014-09-10 Well Mode changed to Drilled and Cased
2014-09-11 Production Casing Operation Performed
2014-09-13 Rig Released
2014-10-12 Well Log Performed
2014-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-30 Well Fluid changed to Gas
2014-10-30 Well Mode changed to Testing
2015-05-02 Well Began Production
2015-05-02 Well Fluid changed to Gas
2015-05-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-08-15 Precision Drilling Corporation 232 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-08-28 3188.40 Deviate (5 - 79 degrees)
2014-08-31 3497.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-26 Multi-Stage Fracture 4803.40 4803.50 0
2014-10-27 Multi-Stage Fracture 4476.40 4476.50 0
2014-10-27 Multi-Stage Fracture 4439.20 4439.30 0
2014-10-27 Multi-Stage Fracture 4402.40 4402.50 0
2014-10-27 Multi-Stage Fracture 4367.20 4367.30 0
2014-10-28 Multi-Stage Fracture 4331.90 4332.00 0
2014-10-28 Multi-Stage Fracture 4295.50 4295.60 0
2014-10-28 Multi-Stage Fracture 4259.80 4259.90 0
2014-10-28 Multi-Stage Fracture 4215.30 4215.40 0
2014-10-28 Multi-Stage Fracture 4170.70 4170.80 0
2014-10-28 Multi-Stage Fracture 4126.20 4126.30 0
2014-10-27 Multi-Stage Fracture 4766.30 4766.40 0
2014-10-28 Multi-Stage Fracture 4081.60 4081.70 0
2014-10-28 Multi-Stage Fracture 4037.10 4037.20 0
2014-10-28 Multi-Stage Fracture 3992.50 3992.60 0
2014-10-28 Multi-Stage Fracture 3947.90 3948.00 0
2014-10-28 Multi-Stage Fracture 3903.30 3903.40 0
2014-10-28 Multi-Stage Fracture 3858.70 3858.80 0
2014-10-28 Multi-Stage Fracture 3814.20 3814.30 0
2014-10-28 Multi-Stage Fracture 3769.70 3769.80 0
2014-10-28 Multi-Stage Fracture 3725.00 3725.10 0
2014-10-29 Multi-Stage Fracture 3680.80 3680.90 0
2014-10-27 Multi-Stage Fracture 4730.30 4730.40 0
2014-10-29 Multi-Stage Fracture 3636.30 3636.40 0
2014-10-29 Multi-Stage Fracture 3591.60 3591.70 0
2014-10-29 Multi-Stage Fracture 3548.20 3548.30 0
2014-10-29 Multi-Stage Fracture 3507.20 3507.30 0
2014-10-27 Multi-Stage Fracture 4695.30 4695.40 0
2014-10-27 Multi-Stage Fracture 4658.60 4658.70 0
2014-10-27 Multi-Stage Fracture 4622.30 4622.40 0
2014-10-27 Multi-Stage Fracture 4587.00 4587.10 0
2014-10-27 Multi-Stage Fracture 4550.70 4550.80 0
2014-10-27 Multi-Stage Fracture 4513.50 4513.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-26 2014-10-29 3,393 9,169 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Not Available 100 0.3008 N/A
Water Not Available 100 85.587 N/A
CARBOHYDROPROP 40/80 PROPPANT Baker Hughes Mullite 1302-93-8 100 3.0879 N/A
Silica Crystalline-Cristobalite 14464-46-1 100 3.0879 N/A
Silicon Dioxide. amorphous as glass 7631-86-9 100 3.0879 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 10.7846 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0823 N/A
Methanol 67-56-1 100 0.0823 N/A
Water 7732-18-5 100 0.0823 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0018 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1553 N/A
Oxyalkylated alcohol 9014 100 0.1553 N/A
Petroleum distillates 64742-47-8 100 0.1553 N/A
Polyacrylate 9014 100 0.1553 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-07-13 2014-08-02 Surface Water - River 9355

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 208 0.0 0.0 0.0
2015 5152 0.0 0.0 0.0
2016 8124 0.0 0.0 0.0
2017 7482 0.0 0.0 0.0
2018 7604 0.0 0.0 0.0
2019 7591 0.0 0.0 0.0
2020 1939 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-13 No Incident Encountered 0.00 0.00
2014-11-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References