X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636053104030

Well Details

Well ID: 0636053104030
Loading map...
Location: 03/04-31-063-05W6/0
Location Alias: 03/04-31-63-05 W6M
Location Alias 2: 03/04-31-063-05 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 05
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: 7GEN HZ 103 KAKWA 4-31-63-5
Operator Name: Seven Generations Energy Ltd.
License Number: 0483485
License Date: 2017-05-02
License Status: Amended
Spud Date: 2018-08-28
Final Drill Date: 2018-09-29
Well Total Depth: 5632.00 m
Surface Hole Latitude: 54.504374
Surface Hole Longitude: -118.780539

For data sources see[1][2]

Well History

Date Event
2017-05-02 Obtained License
2018-08-29 Surface Casing Operation Performed
2018-08-31 Direction Drilling Operation Performed - Deviate
2018-09-10 Intermediate Casing Operation Performed
2018-09-10 Well Log Performed
2018-09-12 Direction Drilling Operation Performed - Horizontal
2018-09-29 Finished Drilling
2018-09-29 Well Log Performed
2018-09-29 Well Mode changed to Drilled and Cased
2018-09-30 Well Log Performed
2018-10-02 Production Casing Operation Performed
2018-10-05 Rig Released
2019-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-22 Perforation Treatment Performed - Abrasa-Jet Perforation
2019-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-23 Perforation Treatment Performed - Jet Perforation
2019-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-24 Perforation Treatment Performed - Jet Perforation
2019-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-25 Perforation Treatment Performed - Jet Perforation
2019-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-26 Perforation Treatment Performed - Jet Perforation
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-29 Perforation Treatment Performed - Jet Perforation
2019-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-31 Perforation Treatment Performed - Jet Perforation
2019-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Perforation Treatment Performed - Jet Perforation
2019-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-02 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-03 Perforation Treatment Performed - Jet Perforation
2019-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-04 Perforation Treatment Performed - Jet Perforation
2019-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Perforation Treatment Performed - Jet Perforation
2019-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Jet Perforation
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-07 Perforation Treatment Performed - Jet Perforation
2019-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-08 Perforation Treatment Performed - Jet Perforation
2019-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Perforation Treatment Performed - Jet Perforation
2019-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-10 Perforation Treatment Performed - Jet Perforation
2019-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-11 Perforation Treatment Performed - Jet Perforation
2019-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-12 Perforation Treatment Performed - Jet Perforation
2019-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-13 Perforation Treatment Performed - Jet Perforation
2019-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-04 Well Fluid changed to Gas
2019-03-04 Well Mode changed to Testing
2019-03-19 Well Began Production
2019-03-19 Well Fluid changed to Gas
2019-03-19 Well Mode changed to Flowing
2019-09-27 Well Fluid changed to Gas
2019-09-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-08-31 768.50 Deviate (5 - 79 degrees)
2018-09-12 3403.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-16 Multi-Stage Fracture 5589.70 5590.70 0
2019-01-24 Perforation 5455.00 5456.00 20
2019-02-05 Multi-Stage Fracture 4271.00 4276.00 0
2019-02-05 Perforation 4234.00 4235.00 20
2019-02-05 Perforation 4230.00 4231.00 20
2019-02-05 Multi-Stage Fracture 4230.00 4235.00 0
2019-02-06 Perforation 4191.00 4192.00 20
2019-02-06 Perforation 4187.00 4188.00 20
2019-02-06 Multi-Stage Fracture 4187.00 4192.00 0
2019-02-06 Perforation 4150.00 4151.00 20
2019-02-06 Perforation 4146.00 4147.00 20
2019-02-06 Multi-Stage Fracture 4146.00 4151.00 0
2019-01-24 Perforation 5451.00 5452.00 20
2019-02-06 Perforation 4108.00 4109.00 20
2019-02-06 Perforation 4104.00 4105.00 20
2019-02-06 Multi-Stage Fracture 4104.00 4109.00 0
2019-02-07 Perforation 4065.00 4066.00 20
2019-02-07 Perforation 4061.00 4062.00 20
2019-02-07 Multi-Stage Fracture 4061.00 4066.00 0
2019-02-07 Perforation 4022.00 4023.00 20
2019-02-07 Perforation 4018.00 4019.00 20
2019-02-07 Multi-Stage Fracture 4018.00 4023.00 0
2019-02-07 Perforation 3980.00 3981.00 20
2019-01-24 Multi-Stage Fracture 5451.00 5456.00 0
2019-02-07 Perforation 3976.00 3977.00 20
2019-02-07 Multi-Stage Fracture 3976.00 3981.00 0
2019-02-08 Perforation 3937.00 3938.00 20
2019-02-08 Perforation 3933.00 3934.00 20
2019-02-08 Multi-Stage Fracture 3933.00 3938.00 0
2019-02-08 Perforation 3895.00 3896.00 20
2019-02-08 Perforation 3891.00 3892.00 20
2019-02-08 Multi-Stage Fracture 3891.00 3896.00 0
2019-02-09 Perforation 3853.00 3854.00 20
2019-02-09 Perforation 3849.00 3850.00 20
2019-01-25 Perforation 5423.00 5424.00 20
2019-02-09 Multi-Stage Fracture 3849.00 3854.00 0
2019-02-09 Perforation 3811.00 3812.00 20
2019-02-09 Perforation 3808.00 3809.00 20
2019-02-09 Multi-Stage Fracture 3808.00 3812.00 0
2019-02-10 Perforation 3770.00 3771.00 20
2019-02-10 Perforation 3766.00 3767.00 20
2019-02-10 Multi-Stage Fracture 3766.00 3771.00 0
2019-02-10 Perforation 3728.00 3729.00 20
2019-02-10 Perforation 3724.00 3725.00 20
2019-02-10 Multi-Stage Fracture 3724.00 3729.00 0
2019-01-25 Perforation 5413.00 5414.00 20
2019-02-11 Perforation 3685.00 3686.00 20
2019-02-11 Perforation 3682.00 3683.00 20
2019-02-11 Multi-Stage Fracture 3682.00 3686.00 0
2019-02-11 Perforation 3642.00 3643.00 20
2019-02-11 Perforation 3638.00 3639.00 20
2019-02-11 Multi-Stage Fracture 3638.00 3643.00 0
2019-02-12 Perforation 3599.00 3600.00 20
2019-02-12 Perforation 3595.00 3596.00 20
2019-02-12 Multi-Stage Fracture 3595.00 3600.00 0
2019-02-12 Perforation 3557.00 3558.00 20
2019-01-25 Perforation 5409.00 5410.00 20
2019-02-12 Perforation 3553.00 3554.00 20
2019-02-12 Multi-Stage Fracture 3553.00 3558.00 0
2019-02-12 Perforation 3515.00 3516.00 20
2019-02-12 Perforation 3511.00 3512.00 20
2019-02-12 Multi-Stage Fracture 3511.00 3516.00 0
2019-02-13 Perforation 3473.00 3474.00 20
2019-02-13 Perforation 3469.00 3470.00 20
2019-02-13 Multi-Stage Fracture 3469.00 3474.00 0
2019-02-13 Perforation 3431.00 3432.00 20
2019-02-13 Perforation 3427.00 3428.00 20
2019-01-25 Multi-Stage Fracture 5409.00 5424.00 0
2019-02-13 Multi-Stage Fracture 3427.00 3432.00 0
2019-02-13 Perforation 3389.00 3390.00 20
2019-02-13 Perforation 3385.00 3386.00 20
2019-02-13 Multi-Stage Fracture 3385.00 3390.00 0
2019-01-25 Perforation 5371.00 5372.00 20
2019-01-25 Perforation 5367.00 5368.00 20
2019-01-25 Multi-Stage Fracture 5367.00 5372.00 0
2019-01-22 Hydra Jet Perforation 5570.00 5570.10 0
2019-01-26 Perforation 5329.00 5330.00 20
2019-01-26 Perforation 5325.00 5326.00 20
2019-01-26 Multi-Stage Fracture 5325.00 5330.00 0
2019-01-26 Perforation 5287.00 5288.00 20
2019-01-26 Perforation 5283.00 5284.00 20
2019-01-26 Multi-Stage Fracture 5283.00 5288.00 0
2019-01-27 Perforation 5245.00 5246.00 20
2019-01-27 Perforation 5241.00 5242.00 20
2019-01-27 Multi-Stage Fracture 5241.00 5246.00 0
2019-01-27 Perforation 5201.00 5202.00 20
2019-01-22 Hydra Jet Perforation 5565.00 5565.10 0
2019-01-27 Perforation 5197.00 5198.00 20
2019-01-27 Multi-Stage Fracture 5197.00 5202.00 0
2019-01-27 Perforation 5159.00 5160.00 20
2019-01-27 Perforation 5156.00 5157.00 20
2019-01-27 Multi-Stage Fracture 5156.00 5160.00 0
2019-01-29 Perforation 5117.00 5118.00 20
2019-01-29 Perforation 5113.00 5114.00 20
2019-01-29 Multi-Stage Fracture 5113.00 5118.00 0
2019-01-29 Perforation 5075.00 5076.00 20
2019-01-29 Perforation 5072.00 5073.00 20
2019-01-22 Hydra Jet Perforation 5555.00 5555.10 0
2019-01-29 Multi-Stage Fracture 5072.00 5076.00 0
2019-01-30 Perforation 5033.00 5034.00 20
2019-01-30 Perforation 5029.00 5030.00 20
2019-01-30 Multi-Stage Fracture 5029.00 5034.00 0
2019-01-30 Perforation 4991.00 4992.00 20
2019-01-30 Perforation 4987.00 4988.00 20
2019-01-30 Multi-Stage Fracture 4987.00 4992.00 0
2019-01-30 Perforation 4949.00 4950.00 20
2019-01-30 Perforation 4945.00 4946.00 20
2019-01-30 Multi-Stage Fracture 4945.00 4950.00 0
2019-01-22 Hydra Jet Perforation 5550.00 5550.10 0
2019-01-31 Perforation 4906.00 4907.00 20
2019-01-31 Perforation 4902.00 4903.00 20
2019-01-31 Multi-Stage Fracture 4902.00 4907.00 0
2019-01-31 Perforation 4864.00 4865.00 20
2019-01-31 Perforation 4860.00 4861.00 20
2019-01-31 Multi-Stage Fracture 4860.00 4865.00 0
2019-01-31 Perforation 4821.00 4822.00 20
2019-01-31 Perforation 4817.00 4818.00 20
2019-01-31 Multi-Stage Fracture 4817.00 4822.00 0
2019-02-01 Perforation 4779.00 4780.00 20
2019-01-22 Multi-Stage Fracture 5550.00 5570.10 0
2019-02-01 Perforation 4775.00 4776.00 20
2019-02-01 Multi-Stage Fracture 4775.00 4780.00 0
2019-02-01 Perforation 4736.00 4737.00 20
2019-02-01 Perforation 4732.00 4733.00 20
2019-02-01 Multi-Stage Fracture 4732.00 4737.00 0
2019-02-01 Perforation 4694.00 4695.00 20
2019-02-01 Perforation 4690.00 4691.00 20
2019-02-01 Multi-Stage Fracture 4690.00 4695.00 0
2019-02-02 Perforation 4674.20 4675.20 20
2019-02-02 Perforation 4653.00 4654.00 20
2019-01-23 Perforation 5497.00 5498.00 20
2019-02-02 Perforation 4649.00 4650.00 20
2019-02-02 Multi-Stage Fracture 4649.00 4654.00 0
2019-02-02 Perforation 4633.30 4634.30 20
2019-02-02 Perforation 4610.00 4611.00 20
2019-02-02 Perforation 4606.00 4607.00 20
2019-02-02 Multi-Stage Fracture 4606.00 4611.00 0
2019-02-02 Perforation 4567.00 4568.00 20
2019-02-02 Perforation 4563.00 4564.00 20
2019-02-02 Multi-Stage Fracture 4563.00 4568.00 0
2019-02-03 Perforation 4528.00 4529.00 20
2019-01-23 Perforation 5493.00 5494.00 20
2019-02-03 Perforation 4525.00 4526.00 20
2019-02-03 Multi-Stage Fracture 4525.00 4529.00 0
2019-02-03 Perforation 4508.50 4509.50 20
2019-02-03 Perforation 4487.00 4488.00 20
2019-02-03 Perforation 4483.00 4484.00 20
2019-02-03 Multi-Stage Fracture 4483.00 4488.00 0
2019-02-04 Perforation 4443.00 4444.00 20
2019-02-04 Perforation 4439.00 4440.00 20
2019-02-04 Multi-Stage Fracture 4439.00 4444.00 0
2019-02-04 Perforation 4401.00 4402.00 20
2019-01-23 Multi-Stage Fracture 5493.00 5498.00 0
2019-02-04 Perforation 4397.00 4398.00 20
2019-02-04 Multi-Stage Fracture 4397.00 4402.00 0
2019-02-05 Perforation 4359.00 4360.00 20
2019-02-05 Perforation 4355.00 4356.00 20
2019-02-05 Multi-Stage Fracture 4355.00 4360.00 0
2019-02-05 Perforation 4317.00 4318.00 20
2019-02-05 Perforation 4314.00 4315.00 20
2019-02-05 Multi-Stage Fracture 4314.00 4318.00 0
2019-02-05 Perforation 4275.00 4276.00 20
2019-02-05 Perforation 4271.00 4272.00 20

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-16 2019-02-13 3,295 49,068 N/A
2 2019-02-01 2019-02-13 3,295 0 N/A
3 2019-01-31 2019-02-13 3,295 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 2-Propenal. 3-phenyl- 104-55-2 100 0.6119 N/A
HCl Acid 7647-01-0 100 0.6119 N/A
Nitrogenous base Trade Secret 100 0.6119 N/A
Water 7732-18-5 100 91.0851 N/A
100 Mesh Halliburton Crystalline silica. quartz 14808-60-7 100 0.7976 N/A
40/70 Domestic Halliburton Crystalline silica. quartz 14808-60-7 100 6.7469 N/A
MC B-8510 Mutli-Chem Bactericide/Biocide 2.2 Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0096 N/A
2.2-Dibromomalonamide 73003-80-2 100 0.0096 N/A
2-Monobromo-3-nitrilopropionamide 1113-55-9 100 0.0096 N/A
Dibromoacetonitrile 3252-43-5 100 0.0096 N/A
Inert Ingredient(s) Not Available 100 0.0096 N/A
OptiFlo-III Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.0126 N/A
Crystalline silica. quartz 14808-60-7 100 0.0126 N/A
Inert Ingredient(s) Not Available 100 0.0126 N/A
MO-67 Halliburton Buffer Inert Ingredient(s) Not Available 100 0.0546 N/A
Sodium hydroxide 1310-73-2 100 0.0546 N/A
CL-22 UC Halliburton Crosslinker Inert Ingredient(s) Not Available 100 0.0743 N/A
Potassium formate 590-29-4 100 0.0743 N/A
CL-31 Halliburton Crosslinker Inert Ingredient(s) Not Available 100 0.0202 N/A
Potassium metaborate 1310-58-3 100 0.0202 N/A
Potassium metaborate 13709-94-9 100 0.0202 N/A
Excelerate PS-2 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 100 0.0267 N/A
Inert Ingredient(s) Not Available 100 0.0267 N/A
Proprietary Trade Secret 100 0.0267 N/A
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.2075 N/A
2 Dissolved mineral salts and water Not Available 100 1.7224 N/A
3 GBW-30 Halliburton Breaker Hemicellulase enzyme 9012-54-8 100 0.0001 N/A
Inert Ingredient(s) Not Available 100 0.0001 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-16 2019-02-14 Surface Water - River 49051
2019-01-16 2019-02-14 Recycled Fracturing Water (treated at independent stand-alone facility) 523

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7069 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-05 No Incident Encountered 0.00 0.00
2019-02-13 No Incident Encountered 0.00 0.00

For data sources see[9]

References