X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636053503050

Well Details

Well ID: 0636053503050
Loading map...
Location: 05/03-35-063-05W6/0
Location Alias: 05/03-35-63-05 W6M
Location Alias 2: 05/03-35-063-05 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 05
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: 7GEN HZ 105 KAKWA 3-35-63-5
Operator Name: Seven Generations Energy Ltd.
License Number: 0475293
License Date: 2015-04-21
License Status: Amended
Spud Date: 2016-01-05
Final Drill Date: 2016-06-21
Well Total Depth: 5976.00 m
Surface Hole Latitude: 54.478872
Surface Hole Longitude: -118.608566

For data sources see[1][2]

Well History

Date Event
2015-04-21 Obtained License
2016-01-05 Direction Drilling Operation Performed - Deviate
2016-01-06 Surface Casing Operation Performed
2016-06-04 Well Log Performed
2016-06-06 Intermediate Casing Operation Performed
2016-06-09 Direction Drilling Operation Performed - Horizontal
2016-06-21 Finished Drilling
2016-06-21 Well Log Performed
2016-06-21 Well Mode changed to Drilled and Cased
2016-06-22 Production Casing Operation Performed
2016-06-24 Rig Released
2016-07-10 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-01 Well Fluid changed to Gas
2016-09-01 Well Mode changed to Testing
2016-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-01 Well Began Production
2016-10-01 Well Fluid changed to Gas
2016-10-01 Well Mode changed to Flowing
2017-07-24 Well Fluid changed to Gas
2017-07-24 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-01-05 232.40 Deviate (5 - 79 degrees)
2016-06-09 3355.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-07-10 Multi-Stage Fracture 5943.90 5944.90 0
2016-07-12 Multi-Stage Fracture 5363.00 5364.00 0
2016-07-13 Multi-Stage Fracture 5299.40 5300.40 0
2016-07-13 Multi-Stage Fracture 5235.00 5236.00 0
2016-07-13 Multi-Stage Fracture 5170.50 5171.50 0
2016-07-14 Multi-Stage Fracture 5098.60 5102.60 0
2016-07-16 Multi-Stage Fracture 5037.20 5041.20 0
2016-07-16 Multi-Stage Fracture 4962.00 4966.00 0
2016-07-16 Multi-Stage Fracture 4901.40 4905.40 0
2016-07-17 Multi-Stage Fracture 4826.10 4830.10 0
2016-07-17 Multi-Stage Fracture 4765.60 4769.60 0
2016-07-10 Multi-Stage Fracture 5875.50 5876.50 0
2016-08-29 Multi-Stage Fracture 4691.40 4694.20 0
2016-08-29 Multi-Stage Fracture 4617.00 4632.40 0
2016-08-30 Multi-Stage Fracture 4540.80 4558.80 0
2016-08-30 Multi-Stage Fracture 4484.00 4498.50 0
2016-08-31 Multi-Stage Fracture 4408.80 4423.80 0
2016-08-31 Multi-Stage Fracture 4347.70 4362.70 0
2016-08-31 Multi-Stage Fracture 4275.70 4290.70 0
2016-09-01 Multi-Stage Fracture 4214.70 4229.70 0
2016-09-01 Multi-Stage Fracture 4139.60 4154.60 0
2016-09-01 Multi-Stage Fracture 4065.50 4080.50 0
2016-07-11 Multi-Stage Fracture 5811.40 5812.40 0
2016-09-02 Multi-Stage Fracture 3991.00 4006.00 0
2016-09-02 Multi-Stage Fracture 3916.60 3931.60 0
2016-09-02 Multi-Stage Fracture 3842.00 3857.00 0
2016-09-03 Multi-Stage Fracture 3768.10 3783.10 0
2016-09-03 Multi-Stage Fracture 3693.90 3708.90 0
2016-09-03 Multi-Stage Fracture 3619.10 3634.10 0
2016-09-03 Multi-Stage Fracture 3543.80 3558.80 0
2016-09-04 Multi-Stage Fracture 3468.40 3483.40 0
2016-09-04 Multi-Stage Fracture 3393.70 3408.70 0
2016-09-04 Multi-Stage Fracture 3333.50 3348.50 0
2016-07-11 Multi-Stage Fracture 5747.00 5748.00 0
2016-09-04 Multi-Stage Fracture 3244.00 3259.00 0
2016-07-12 Multi-Stage Fracture 5684.30 5685.30 0
2016-07-12 Multi-Stage Fracture 5619.90 5620.90 0
2016-07-12 Multi-Stage Fracture 5555.30 5556.30 0
2016-07-12 Multi-Stage Fracture 5490.90 5491.90 0
2016-07-12 Multi-Stage Fracture 5427.40 5428.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-10 2016-09-04 3,219 41,830 N/A
2 2016-07-13 2016-09-04 3,219 0 N/A
3 2016-07-17 2016-07-17 3,219 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.335 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 13.5572 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0113 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0112 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0957 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0014 N/A
Water 7732-18-5 100 0.0014 N/A
3 DWP-975 Calfrac Breaker Ammonium Persulfate 7727-54-0 100 0 N/A
Non-Hazardous Ingredients Trade Secret 100 0 N/A
DWP-101 Calfrac Gelling Agent Guar gum 9000-30-0 100 0.0016 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0016 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-05-30 2016-06-23 Surface Water - River 5581
2016-06-20 2016-09-06 Surface Water - Runoff 938
2016-05-30 2016-06-23 Surface Water - River 23134
2016-06-20 2016-09-06 Surface Water - Runoff 12177

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2018 0.0 0.0 0.0
2017 7711 0.0 0.0 0.0
2018 8749 0.0 0.0 0.0
2019 8668 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-24 No Incident Encountered 0.00 0.00
2016-09-04 No Incident Encountered 0.00 0.00

For data sources see[9]

References