X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644021705000

Well Details

Well ID: 0644021705000
Loading map...
Location: 00/05-17-064-02W4/0
Location Alias: 00/05-17-64-02 W4M
Location Alias 2: 00/05-17-064-02 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 02
Section: 17
County/Municipality: Cold Lake 149B
Well Name: TRIAD BP COLD LAKE 5-17-64-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0027980
License Date: 1965-03-15
License Status: RecCertified
Spud Date: 1965-03-16
Final Drill Date: 1965-03-22
Well Total Depth: 515.10 m
Surface Hole Latitude: 54.534948
Surface Hole Longitude: -110.280240

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-15 Obtained License
1965-03-22 Drill Stem Test Performed
1965-03-22 Finished Drilling
1965-03-23 Drill Stem Test Performed
1965-03-24 Drill Stem Test Performed
1965-03-25 Production Casing Operation Performed
1965-04-04 Perforation Treatment Performed - Bullet Perforation
1965-06-22 Perforation Treatment Performed - Cement Squeeze
1965-06-23 Perforation Treatment Performed - Bullet Perforation
1965-08-19 Well Mode changed to Drilled and Cased
1970-03-10 Perforation Treatment Performed - Cement Plug
1970-03-10 Well Abandoned
1970-03-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-04-04 Bullet Perforation 420.90 425.50 7
1965-06-22 Cement Squeeze 420.90 425.50 0
1965-06-23 Bullet Perforation 381.60 387.10 7
1970-03-10 Cement Plug 355.40 413.30 0

For data sources see[4]



References