X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644060612020

Well Details

Well ID: 0644060612020
Loading map...
Location: 02/12-06-064-06W4/0
Location Alias: 02/12-06-64-06 W4M
Location Alias 2: 02/12-06-064-06 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 06
Section: 06
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: MOBIL 11 WOLFLK EX 12C-6-64-6
Operator Name: ExxonMobil Canada Ltd.
License Number: 0127126
License Date: 1987-07-02
License Status: RecExempt
Spud Date: 1987-08-19
Final Drill Date: 1987-08-21
Well Total Depth: 517.00 m
Surface Hole Latitude: 54.511257
Surface Hole Longitude: -110.907511

For data sources see[1][2]

Well History

Date Event
1987-07-02 Obtained License
1987-08-19 Direction Drilling Operation Performed - Deviate
1987-08-19 Well Log Performed
1987-08-20 Surface Casing Operation Performed
1987-08-21 Finished Drilling
1987-08-21 Well Mode changed to Drilled and Cased
1987-08-22 Production Casing Operation Performed
1987-08-22 Rig Released
1987-08-22 Well Log Performed
1987-09-16 Well Log Performed
1987-09-17 Well Log Performed
1987-10-21 Well Log Performed
1988-02-19 Perforation Treatment Performed - Jet Perforation
1988-02-19 Well Log Performed
1988-07-10 Well Began Production
1988-07-10 Well Fluid changed to Crude Bitumen
1988-07-10 Well Type changed to Cyclical
1988-10-19 Well Log Performed
1990-09-30 Well Fluid changed to Crude Bitumen
1990-09-30 Well Mode changed to Suspended
1990-09-30 Well Type changed to Cyclical
1997-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-25 Perforation Treatment Performed - Cement Squeeze
1997-10-25 Plug Back Performed
1997-10-25 Well Fluid changed to Crude Bitumen
1997-10-25 Well Mode changed to Abandoned Zone
1997-10-25 Well Type changed to Cyclical
1997-11-19 Well Abandoned
1997-11-19 Well Fluid changed to Crude Bitumen
1997-11-19 Well Mode changed to Abandoned
1997-11-19 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-08-19 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-19 Perforation 475.50 484.00 13
1988-02-19 Perforation 492.00 498.50 13
1988-02-19 Perforation 502.50 506.50 13
1997-10-25 Cement Squeeze 475.50 506.50 0
1997-10-25 Packing Device Capped w/Cement 394.00 469.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1298 0.0 0.0 0.0
1989 5221 0.0 0.0 0.0
1990 3935 0.0 0.0 0.0

For data sources see[6]

References