X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644162511002

Well Details

Well ID: 0644162511002
Loading map...
Location: 00/11-25-064-16W4/2
Location Alias: 00/11-25-64-16 W4M
Location Alias 2: 00/11-25-064-16 W4/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 16
Section: 25
County/Municipality: Buffalo Lake Metis Settlement
Well Name: CNRL FIGURE LAKE 11-25-64-16
Operator Name: Canadian Natural Resources Limited
License Number: 0169196
License Date: 1994-08-03
License Status: Suspension
Spud Date: 1994-08-15
Final Drill Date: 1994-08-17
Well Total Depth: 556.00 m
Surface Hole Latitude: 54.565822
Surface Hole Longitude: -112.292803

For data sources see[1][2]

Well History

Date Event
1994-08-03 Obtained License
1994-08-15 Well Log Performed
1994-08-16 Surface Casing Operation Performed
1994-08-17 Finished Drilling
1994-08-17 Well Mode changed to Drilled and Cased
1994-08-18 Drill Stem Test Performed
1994-08-18 Well Log Performed
1994-08-19 Drill Stem Test Performed
1994-08-20 Drill Stem Test Performed
1994-08-20 Production Casing Operation Performed
1994-08-21 Rig Released
1994-08-31 Perforation Treatment Performed - Open-Hole Completion
1994-08-31 Well Log Performed
1994-09-01 Perforation Treatment Performed - Jet Perforation
1994-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-08 Well Began Production
1994-12-08 Well Fluid changed to Gas
1994-12-08 Well Mode changed to Flowing
1997-08-26 Well Fluid changed to Gas
1997-08-26 Well Log Performed
1997-08-26 Well Mode changed to Suspended
1997-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-27 Plug Back Performed
1997-08-27 Well Fluid changed to Gas
1997-08-27 Well Mode changed to Suspended
1997-08-28 Perforation Treatment Performed - Jet Perforation
1998-02-06 Well Log Performed
1998-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-07 Plug Back Performed
1998-02-07 Well Fluid changed to Gas
1998-02-07 Well Mode changed to Abandoned Zone
1998-02-08 Perforation Treatment Performed - Jet Perforation
1999-11-23 Perforation Treatment Performed - Jet Perforation
1999-11-23 Well Log Performed
2002-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-13 Plug Back Performed
2002-12-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-08-31 Open Hole/Barefoot Completion 555.00 556.00 0
1998-02-07 Packing Device Capped w/Cement 472.00 479.00 0
1998-02-08 Perforation 427.00 428.50 18
1999-11-23 Perforation 418.00 419.50 17
2002-12-13 Packing Device Capped w/Cement 421.00 425.00 0
1994-09-01 Perforation 550.00 555.00 13
1994-09-01 Perforation 460.50 463.50 13
1994-09-02 Acid Treatment 550.00 556.00 0
1997-08-27 Packing Device Capped w/Cement 532.00 540.00 0
1997-08-28 Perforation 486.00 487.50 13
1997-08-28 Perforation 399.70 400.50 13
1997-08-28 Perforation 407.00 408.00 13
1998-02-07 Packing Device Capped w/Cement 445.00 453.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 574 0.0 0.0 0.0
1995 8446 0.0 0.0 0.0
1996 1448 0.0 0.0 0.0
1997 787 0.0 0.0 0.0

For data sources see[5]

References