X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644181106000

Well Details

Well ID: 0644181106000
Loading map...
Location: 00/06-11-064-18W4/0
Location Alias: 00/06-11-64-18 W4M
Location Alias 2: 00/06-11-064-18 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 18
Section: 11
County/Municipality: Athabasca County
Well Name: ACL FIGURE LAKE 6-11-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0003940
License Date: 1951-12-13
License Status: RecCertified
Spud Date: 1952-02-03
Final Drill Date: 1952-02-23
Well Total Depth: 675.70 m
Surface Hole Latitude: 54.520856
Surface Hole Longitude: -112.615953

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-13 Obtained License
1952-02-11 Drill Stem Test Performed
1952-02-12 Drill Stem Test Performed
1952-02-13 Drill Stem Test Performed
1952-02-14 Drill Stem Test Performed
1952-02-15 Drill Stem Test Performed
1952-02-16 Drill Stem Test Performed
1952-02-17 Drill Stem Test Performed
1952-02-19 Drill Stem Test Performed
1952-02-20 Drill Stem Test Performed
1952-02-21 Drill Stem Test Performed
1952-02-22 Drill Stem Test Performed
1952-02-23 Finished Drilling
1952-02-24 Production Casing Operation Performed
1952-02-24 Well Mode changed to Drilled and Cased
1976-02-12 Perforation Treatment Performed - Jet Perforation
1993-01-27 Well Began Production
1993-01-27 Well Fluid changed to Gas
1993-01-27 Well Mode changed to Flowing
1993-02-28 Perforation Treatment Performed - Cement Squeeze
1993-03-02 Perforation Treatment Performed - Jet Perforation
1994-10-31 Well Fluid changed to Gas
1994-10-31 Well Mode changed to Suspended
1995-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-06 Perforation Treatment Performed - Jet Perforation
1995-01-06 Plug Back Performed
1995-01-06 Well Fluid changed to Gas
1995-01-06 Well Mode changed to Abandoned Zone
1995-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-07 Perforation Treatment Performed - Jet Perforation
1995-01-07 Plug Back Performed
1995-01-08 Perforation Treatment Performed - Remedial Casing
1997-03-08 Well Abandoned
1997-03-08 Well Fluid changed to Gas
1997-03-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-12 Perforation 657.10 661.40 7
1995-01-08 Remedial Casing Cementing 299.00 300.00 0
1993-02-28 Cement Squeeze 657.10 661.40 0
1993-03-02 Perforation 656.80 659.00 13
1993-03-02 Perforation 658.00 659.00 13
1993-03-02 Perforation 658.00 659.00 13
1995-01-06 Packing Device Capped w/Cement 643.00 651.00 0
1995-01-06 Perforation 508.40 509.00 13
1995-01-07 Packing Device Capped w/Cement 495.00 503.00 0
1995-01-07 Perforation 299.00 300.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1519 0.0 0.0 0.0
1994 77 0.0 0.0 0.0

For data sources see[5]

References