X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644191601003

Well Details

Well ID: 0644191601003
Loading map...
Location: 00/01-16-064-19W4/3
Location Alias: 00/01-16-64-19 W4M
Location Alias 2: 00/01-16-064-19 W4/03
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 19
Section: 16
County/Municipality: Athabasca County
Well Name: VERMILION COLIN 1-16-64-19
Operator Name: Vermilion Energy Inc.
License Number: 0221556
License Date: 1999-02-16
License Status: Suspension
Spud Date: 1999-02-28
Final Drill Date: 1999-03-02
Well Total Depth: 755.00 m
Surface Hole Latitude: 54.530978
Surface Hole Longitude: -112.809434

For data sources see[1][2]

Well History

Date Event
1999-02-16 Obtained License
1999-02-28 Surface Casing Operation Performed
1999-03-01 Direction Drilling Operation Performed - Deviate
1999-03-02 Finished Drilling
1999-03-02 Well Mode changed to Drilled and Cased
1999-03-03 Production Casing Operation Performed
1999-03-03 Rig Released
1999-03-03 Well Log Performed
1999-03-08 Well Log Performed
1999-03-09 Perforation Treatment Performed - Jet Perforation
1999-03-09 Well Log Performed
2001-01-26 Perforation Treatment Performed - Cement Squeeze
2001-01-26 Plug Back Performed
2001-01-31 Perforation Treatment Performed - Jet Perforation
2007-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-04 Perforation Treatment Performed - Jet Perforation
2007-11-04 Plug Back Performed
2007-11-04 Well Log Performed
2007-11-07 Well Log Performed
2007-11-26 Well Began Production
2007-11-26 Well Fluid changed to Gas
2007-11-26 Well Mode changed to Flowing
2007-12-15 Well Fluid changed to Gas
2007-12-15 Well Mode changed to Suspended
2019-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-17 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-03-01 253.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-09 Perforation 571.00 573.00 13
2001-01-26 Cement Squeeze 571.00 573.00 0
2001-01-31 Perforation 720.50 721.50 17
2007-11-04 Packing Device Capped w/Cement 700.00 708.00 0
2007-11-04 Perforation 619.00 623.00 13
2007-11-04 Perforation 607.00 609.50 13
2019-03-17 Packing Device Capped w/Cement 612.00 615.00 0
2019-03-17 Packing Device Capped w/Cement 594.00 602.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 502 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References