If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0645092104020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.543802,"lon":-115.330485,"icon":""}]} |
Location: 02/04-21-064-09W5/0 | |
Location Alias: 02/04-21-64-09 W5M | |
Location Alias 2: 02/04-21-064-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 5 | |
Range: 09 | |
Section: 21 | |
County/Municipality: Big Lakes County | |
Well Name: CPEC HZ 102 SWANHS 4-21-64-9 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0437878 | |
License Date: 2011-10-21 | |
License Status: Issued | |
Spud Date: 2011-10-30 | |
Final Drill Date: 2011-11-16 | |
Well Total Depth: 4012.00 m | |
Surface Hole Latitude: 54.543802 | |
Surface Hole Longitude: -115.330485 |
Date | Event |
---|---|
2011-10-21 | Obtained License |
2011-11-03 | Surface Casing Operation Performed |
2011-11-07 | Direction Drilling Operation Performed - Horizontal |
2011-11-10 | Intermediate Casing Operation Performed |
2011-11-16 | Finished Drilling |
2011-11-16 | Well Mode changed to Drilled and Cased |
2011-11-17 | Liner Casing Operation Performed |
2011-11-19 | Rig Released |
2011-11-19 | Well Log Performed |
2011-12-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-16 | Perforation Treatment Performed - Open-Hole Completion |
2012-01-01 | Well Began Production |
2012-01-01 | Well Fluid changed to Crude Oil |
2012-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-07 | 2251.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-16 | Open Hole/Barefoot Completion | 4007.00 | 4012.00 | 0 |
2011-12-16 | Multi-Stage Fracture | 3236.80 | 3236.90 | 0 |
2011-12-16 | Multi-Stage Fracture | 3128.60 | 3128.70 | 0 |
2011-12-16 | Multi-Stage Fracture | 3044.90 | 3045.00 | 0 |
2011-12-16 | Multi-Stage Fracture | 2962.70 | 2962.80 | 0 |
2011-12-16 | Multi-Stage Fracture | 2865.20 | 2865.30 | 0 |
2011-12-16 | Multi-Stage Fracture | 2795.00 | 2795.10 | 0 |
2011-12-16 | Multi-Stage Fracture | 2714.20 | 2714.30 | 0 |
2011-12-16 | Multi-Stage Fracture | 3985.20 | 3985.30 | 0 |
2011-12-16 | Multi-Stage Fracture | 3895.00 | 3895.10 | 0 |
2011-12-16 | Multi-Stage Fracture | 3747.00 | 3747.10 | 0 |
2011-12-16 | Multi-Stage Fracture | 3599.20 | 3599.30 | 0 |
2011-12-16 | Multi-Stage Fracture | 3540.70 | 3540.80 | 0 |
2011-12-16 | Multi-Stage Fracture | 3458.30 | 3458.40 | 0 |
2011-12-16 | Multi-Stage Fracture | 3374.50 | 3374.60 | 0 |
2011-12-16 | Multi-Stage Fracture | 3292.60 | 3292.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6017 | 0.0 | 0.0 | 0.0 |
2013 | 7371 | 0.0 | 0.0 | 0.0 |
2014 | 7576 | 0.0 | 0.0 | 0.0 |
2015 | 7743 | 0.0 | 0.0 | 0.0 |
2016 | 6060 | 0.0 | 0.0 | 0.0 |
2017 | 8645 | 0.0 | 0.0 | 0.0 |
2018 | 8467 | 0.0 | 0.0 | 0.0 |
2019 | 2822 | 0.0 | 0.0 | 0.0 |
2020 | 844 | 0.0 | 0.0 | 0.0 |
For data sources see[6]