X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645100912000

Well Details

Well ID: 0645100912000
Loading map...
Location: 00/12-09-064-10W5/0
Location Alias: 00/12-09-64-10 W5M
Location Alias 2: 00/12-09-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 09
County/Municipality: Big Lakes County
Well Name: DEKALB JUDY 12-9-64-10
Operator Name: Paramount Resources Ltd.
License Number: 0023618
License Date: 1963-01-08
License Status: RecCertified
Spud Date: 1963-01-16
Final Drill Date: 1963-02-14
Well Total Depth: 2584.70 m
Surface Hole Latitude: 54.524559
Surface Hole Longitude: -115.459968

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-08 Obtained License
1963-02-14 Finished Drilling
1963-02-14 Well Mode changed to Drilled and Cased
1963-02-15 Production Casing Operation Performed
1963-02-17 Perforation Treatment Performed - Jet Perforation
1963-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-01 Perforation Treatment Performed - Cement Squeeze
1963-03-04 Perforation Treatment Performed - Cement Squeeze
1963-03-05 Perforation Treatment Performed - Jet Perforation
1963-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-27 Well Began Production
1963-03-27 Well Fluid changed to Crude Oil
1963-03-27 Well Mode changed to Pumping
1981-01-01 Well Fluid changed to Crude Oil
1981-01-01 Well Mode changed to Suspended
1988-03-11 Well Log Performed
1988-03-12 Perforation Treatment Performed - Jet Perforation
1988-03-12 Well Log Performed
1988-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-02 Plug Back Performed
1995-12-02 Well Fluid changed to Crude Oil
1995-12-02 Well Mode changed to Abandoned
1995-12-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-17 Perforation 2545.40 2546.00 13
1963-03-05 Perforation 2545.40 2546.00 13
1963-03-05 Perforation 2529.50 2530.10 13
1963-03-06 Acid Treatment 2529.50 2551.80 0
1988-03-12 Perforation 2535.30 2536.50 7
1988-03-12 Perforation 2539.30 2540.50 7
1988-03-12 Perforation 2541.40 2543.30 7
1988-03-12 Perforation 2544.20 2544.80 7
1988-03-12 Perforation 2546.00 2546.90 7
1988-03-13 Acid Treatment 2529.50 2546.00 0
1995-12-02 Packing Device Capped w/Cement 2514.00 2522.00 0
1963-02-17 Perforation 2549.70 2551.80 13
1963-02-17 Perforation 2551.80 2553.00 13
1963-02-17 Perforation 2553.60 2555.40 13
1963-02-17 Perforation 2556.10 2557.90 13
1963-02-22 Acid Treatment 2545.40 2557.90 0
1963-03-01 Cement Squeeze 2545.40 2557.90 0
1963-03-04 Cement Squeeze 2545.40 2557.90 0
1963-03-05 Perforation 2549.70 2551.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1980 14 0.0 0.0 0.0

For data sources see[5]

References