X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645110610000

Well Details

Well ID: 0645110610000
Loading map...
Location: 00/10-06-064-11W5/0
Location Alias: 00/10-06-64-11 W5M
Location Alias 2: 00/10-06-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 06
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 10-6-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0021826
License Date: 1961-12-12
License Status: Issued
Spud Date: 1961-12-29
Final Drill Date: 1962-01-31
Well Total Depth: 2745.00 m
Surface Hole Latitude: 54.510695
Surface Hole Longitude: -115.649466

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-12-12 Obtained License
1962-01-31 Finished Drilling
1962-01-31 Production Casing Operation Performed
1962-01-31 Well Mode changed to Drilled and Cased
1962-02-08 Perforation Treatment Performed - Jet Perforation
1962-02-08 Perforation Treatment Performed - Selective Jet Perforations
1962-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-12 Well Began Production
1962-02-12 Well Fluid changed to Crude Oil
1962-02-12 Well Mode changed to Flowing
1972-10-29 Perforation Treatment Performed - Jet Perforation
1972-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-25 Perforation Treatment Performed - Jet Perforation
1978-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-09 Well Fluid changed to Crude Oil
1979-07-09 Well Mode changed to Gas Lift
1982-05-01 Well Fluid changed to Crude Oil
1982-05-01 Well Mode changed to Suspended
1985-03-26 Well Fluid changed to Crude Oil
1985-03-26 Well Mode changed to Flowing
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Suspended
1987-03-26 Well Log Performed
1987-03-31 Well Log Performed
1987-04-27 Well Began Injection
1987-04-27 Well Fluid changed to Water
1987-04-27 Well Type changed to Injection
1987-05-05 Well Log Performed
1987-05-14 Well Fluid changed to Solvent
1987-05-14 Well Type changed to Injection
1990-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-08 Well Log Performed
1990-10-01 Well Log Performed
1990-11-24 Well Log Performed
1993-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-02 Well Log Performed
1994-10-05 Well Fluid changed to Solvent
1994-10-05 Well Mode changed to Suspended
1994-10-05 Well Type changed to Injection
1996-02-17 Well Fluid changed to Solvent
1996-02-17 Well Type changed to Injection
1999-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-12-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-02-08 Selective Jet Perforations 2714.50 2714.50 0
1972-10-30 Acid Treatment 2693.20 2717.90 3
1978-05-25 Perforation 2703.00 2708.80 7
1978-05-25 Perforation 2710.60 2714.50 7
1978-05-29 Acid Treatment 2693.20 2717.90 3
1979-07-05 Acid Treatment 2693.20 2717.90 0
1990-01-11 Acid Treatment 2693.20 2717.90 0
1993-06-24 Acid Treatment 2693.20 2717.90 0
1999-04-07 Acid Treatment 2693.20 2717.90 0
2010-12-07 Acid Treatment 2693.20 2717.90 0
2011-12-18 Acid Treatment 2693.20 2717.90 0
1962-02-08 Perforation 2715.50 2716.10 3
2012-10-03 Acid Treatment 2693.20 2718.20 0
2013-03-06 Acid Treatment 2693.20 2717.90 0
2013-12-07 Acid Treatment 2693.20 2717.90 0
1962-02-08 Perforation 2716.70 2717.90 3
1962-02-09 Acid Treatment 2714.50 2717.90 0
1972-10-29 Perforation 2693.20 2694.40 3
1972-10-29 Perforation 2695.00 2697.50 3
1972-10-29 Perforation 2699.30 2701.10 3
1972-10-29 Perforation 2703.00 2705.40 3
1972-10-29 Perforation 2706.00 2707.20 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8173 0.0 0.0 0.0
1968 8232 0.0 0.0 0.0
1969 7154 0.0 0.0 0.0
1970 7348 0.0 0.0 0.0
1971 7542 0.0 0.0 0.0
1972 7500 0.0 0.0 0.0
1973 7168 0.0 0.0 0.0
1974 6693 0.0 0.0 0.0
1975 463 0.0 0.0 0.0
1979 1337 0.0 0.0 0.0
1980 7314 0.0 0.0 0.0
1981 4439 0.0 0.0 0.0
1985 1042 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-03 No Incident Encountered 0.00 0.00
2013-03-06 No Incident Encountered 0.00 0.00
2013-12-07 No Incident Encountered 0.00 0.00
2014-12-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References