X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645111002000

Well Details

Well ID: 0645111002000
Loading map...
Location: 00/02-10-064-11W5/0
Location Alias: 00/02-10-64-11 W5M
Location Alias 2: 00/02-10-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 10
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 2-10-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0020338
License Date: 1961-01-27
License Status: Suspension
Spud Date: 1961-02-10
Final Drill Date: 1961-03-19
Well Total Depth: 2692.90 m
Surface Hole Latitude: 54.517530
Surface Hole Longitude: -115.572677

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-01-27 Obtained License
1961-03-09 Production Casing Operation Performed
1961-03-15 Lost Circulation Occurred
1961-03-19 Finished Drilling
1961-03-19 Well Mode changed to Drilled and Cased
1961-03-23 Perforation Treatment Performed - Open-Hole Completion
1961-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-04-15 Well Began Production
1961-04-15 Well Fluid changed to Crude Oil
1961-04-15 Well Mode changed to Flowing
1972-11-21 Well Fluid changed to Crude Oil
1972-11-21 Well Mode changed to Pumping
1980-10-31 Perforation Treatment Performed - Open-Hole Completion
1980-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-25 Well Log Performed
1993-09-15 Well Log Performed
2014-07-01 Well Fluid changed to Crude Oil
2014-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-23 Open Hole/Barefoot Completion 2620.10 2655.10 0
1961-03-30 Acid Treatment 2620.10 2655.10 0
1980-10-31 Open Hole/Barefoot Completion 2620.10 2674.60 0
1980-11-02 Acid Treatment 2620.10 2674.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8299 0.0 0.0 0.0
1968 7545 0.0 0.0 0.0
1969 7647 0.0 0.0 0.0
1970 8356 0.0 0.0 0.0
1971 8492 0.0 0.0 0.0
1972 7327 0.0 0.0 0.0
1973 8370 0.0 0.0 0.0
1974 8158 0.0 0.0 0.0
1975 4781 0.0 0.0 0.0
1976 3710 0.0 0.0 0.0
1977 5582 0.0 0.0 0.0
1978 4324 0.0 0.0 0.0
1979 7835 0.0 0.0 0.0
1980 7967 0.0 0.0 0.0
1981 8388 0.0 0.0 0.0
1982 8056 0.0 0.0 0.0
1983 7980 0.0 0.0 0.0
1984 7566 0.0 0.0 0.0
1985 8277 0.0 0.0 0.0
1986 8177 0.0 0.0 0.0
1987 8661 0.0 0.0 0.0
1988 8360 0.0 0.0 0.0
1989 8540 0.0 0.0 0.0
1990 8393 0.0 0.0 0.0
1991 8619 0.0 0.0 0.0
1992 6997 0.0 0.0 0.0
1993 4142 0.0 0.0 0.0
1994 8128 0.0 0.0 0.0
1995 8619 0.0 0.0 0.0
1996 8299 0.0 0.0 0.0
1997 8697 0.0 0.0 0.0
1998 8607 0.0 0.0 0.0
1999 8488 0.0 0.0 0.0
2000 8744 0.0 0.0 0.0
2001 8669 0.0 0.0 0.0
2002 8551 0.0 0.0 0.0
2003 7840 0.0 0.0 0.0
2004 8587 0.0 0.0 0.0
2005 8657 0.0 0.0 0.0
2006 8701 0.0 0.0 0.0
2007 8713 0.0 0.0 0.0
2008 8075 0.0 0.0 0.0
2009 7702 0.0 0.0 0.0
2010 8224 0.0 0.0 0.0
2011 8638 0.0 0.0 0.0
2012 8338 0.0 0.0 0.0
2013 4317 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-03-15 Lost Circulation 2680.70 2680.70

For data sources see[6]

References