X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645123112020

Well Details

Well ID: 0645123112020
Loading map...
Location: 02/12-31-064-12W5/0
Location Alias: 02/12-31-64-12 W5M
Location Alias 2: 02/12-31-064-12 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 12
Section: 31
County/Municipality: Big Lakes County
Well Name: COPRC ET AL JUDYCK 12-31-64-12
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0102398
License Date: 1983-07-27
License Status: Abandoned
Spud Date: 1983-08-12
Final Drill Date: 1983-09-13
Well Total Depth: 2820.00 m
Surface Hole Latitude: 54.582089
Surface Hole Longitude: -115.812019

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-27 Obtained License
1983-08-12 Direction Drilling Operation Performed - 98
1983-08-12 Lost Circulation Occurred
1983-08-18 Well Log Performed
1983-08-30 Well Log Performed
1983-09-13 Finished Drilling
1983-09-13 Well Mode changed to Drilled and Cased
1983-09-14 Well Log Performed
1983-09-16 Production Casing Operation Performed
1983-09-19 Well Log Performed
1983-10-10 Perforation Treatment Performed - Jet Perforation
1983-10-10 Well Log Performed
1983-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-18 Perforation Treatment Performed - Jet Perforation
1983-10-18 Well Log Performed
1983-11-24 Well Began Production
1983-11-24 Well Fluid changed to Crude Oil
1983-11-24 Well Mode changed to Pumping
1986-03-06 Well Fluid changed to Crude Oil
1986-03-06 Well Mode changed to Suspended
1989-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-03 Plug Back Performed
1989-03-03 Well Fluid changed to Crude Oil
1989-03-03 Well Mode changed to Abandoned
2002-09-15 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-08-12 2077.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-10 Perforation 2786.50 2789.00 7
1983-10-13 Acid Treatment 2786.50 2789.00 0
1983-10-18 Packing Device Capped w/Cement 2780.00 2785.00 0
1983-10-18 Perforation 2773.50 2775.00 7
1983-10-18 Perforation 2766.00 2767.00 7
1983-10-18 Perforation 2768.00 2769.00 7
1989-03-03 Packing Device Capped w/Cement 2747.00 2755.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 600 0.0 0.0 0.0
1984 5114 0.0 0.0 0.0
1985 5257 0.0 0.0 0.0
1986 318 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-08-12 Lost Circulation 125.00 125.00

For data sources see[7]

References