X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645180210000

Well Details

Well ID: 0645180210000
Loading map...
Location: 00/10-02-064-18W5/0
Location Alias: 00/10-02-64-18 W5M
Location Alias 2: 00/10-02-064-18 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 18
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY ET AL KAYBOB 10-2-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0041690
License Date: 1971-12-21
License Status: Issued
Spud Date: 1972-01-02
Final Drill Date: 1972-01-24
Well Total Depth: 3054.10 m
Surface Hole Latitude: 54.511621
Surface Hole Longitude: -116.605043

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-12-21 Obtained License
1972-01-24 Finished Drilling
1972-01-28 Drill Stem Test Performed
1972-01-30 Production Casing Operation Performed
1972-02-07 Perforation Treatment Performed - Jet Perforation
1972-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-16 Well Mode changed to Drilled and Cased
1981-05-01 Well Began Production
1981-05-01 Well Fluid changed to Gas
1981-05-01 Well Mode changed to Flowing
1983-03-16 Perforation Treatment Performed - Jet Perforation
1983-03-18 Perforation Treatment Performed - Jet Perforation
1983-03-21 Perforation Treatment Performed - Fractured
1985-11-20 Perforation Treatment Performed - Jet Perforation
1985-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-01 Well Log Performed
1985-12-02 Perforation Treatment Performed - Jet Perforation
1985-12-05 Perforation Treatment Performed - Cement Squeeze
1985-12-07 Perforation Treatment Performed - Jet Perforation
1987-05-30 Perforation Treatment Performed - Jet Perforation
1987-05-30 Well Log Performed
1987-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-04 Well Fluid changed to Gas
2001-11-04 Well Log Performed
2001-11-04 Well Mode changed to Suspended
2001-11-05 Perforation Treatment Performed - Jet Perforation
2001-11-05 Well Log Performed
2001-11-07 Perforation Treatment Performed - Jet Perforation
2001-11-07 Well Log Performed
2001-11-09 Perforation Treatment Performed - Cement Squeeze
2001-11-11 Perforation Treatment Performed - Remedial Casing
2001-11-11 Well Log Performed
2001-11-12 Perforation Treatment Performed - Fractured
2001-11-12 Perforation Treatment Performed - Jet Perforation
2009-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-02-07 Perforation 2939.50 2941.30 7
1983-03-18 Perforation 2942.50 2943.50 7
1983-03-18 Perforation 2944.70 2947.40 7
1983-03-18 Perforation 2948.30 2950.50 7
1983-03-18 Perforation 2951.70 2953.50 7
1983-03-18 Perforation 2955.00 2959.00 7
1983-03-21 Fracture 2939.50 2959.00 0
1985-11-20 Perforation 2964.00 2966.00 13
1985-11-26 Acid Treatment 2964.00 2966.00 0
1985-12-02 Perforation 2982.00 2983.00 13
1985-12-05 Cement Squeeze 2964.00 2966.00 0
1972-02-07 Perforation 2942.50 2943.50 7
1985-12-07 Perforation 2939.50 2941.50 13
1985-12-07 Perforation 2942.50 2943.50 13
1985-12-07 Perforation 2944.50 2947.50 13
1987-05-30 Perforation 2948.50 2950.50 13
1987-05-30 Perforation 2951.50 2953.50 13
1987-05-30 Perforation 2955.00 2959.00 13
1987-06-01 Acid Treatment 2939.50 2959.00 0
2001-11-05 Perforation 1848.30 1850.70 17
2001-11-05 Perforation 1841.60 1846.50 17
2001-11-07 Perforation 1875.00 1876.00 20
1972-02-07 Perforation 2944.70 2947.40 7
2001-11-09 Cement Squeeze 1841.60 1850.70 0
2001-11-11 Remedial Casing Cementing 1848.30 1850.70 0
2001-11-11 Remedial Casing Cementing 1841.60 1846.50 0
2001-11-12 Fracture 1841.60 1846.50 0
2001-11-12 Fracture 1848.30 1850.70 0
2001-11-12 Perforation 1848.30 1850.70 17
2001-11-12 Perforation 1841.60 1846.50 17
2009-06-04 Acid Treatment 1848.30 1850.70 0
2009-06-04 Acid Treatment 1841.60 1846.50 0
2009-12-18 Acid Treatment 1848.30 1850.70 0
1972-02-07 Perforation 2948.30 2950.50 7
2009-12-18 Acid Treatment 1841.60 1846.50 0
1972-02-07 Perforation 2951.70 2953.50 7
1972-02-07 Perforation 2955.00 2958.10 7
1972-02-08 Acid Treatment 2939.50 2958.10 0
1983-03-16 Perforation 2955.00 2959.00 13
1983-03-18 Perforation 2939.50 2941.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 50 0.0 0.0 0.0
1981 2856 0.0 0.0 0.0
1982 2489 0.0 0.0 0.0
1983 2280 0.0 0.0 0.0
1984 800 0.0 0.0 0.0
1985 165 0.0 0.0 0.0
1986 4290 0.0 0.0 0.0
1987 8257 0.0 0.0 0.0
1988 6838 0.0 0.0 0.0
1989 8303 0.0 0.0 0.0
1990 7095 0.0 0.0 0.0
1991 5488 0.0 0.0 0.0
1992 1899 0.0 0.0 0.0
1993 952 0.0 0.0 0.0
1994 832 0.0 0.0 0.0
1995 846 0.0 0.0 0.0
1996 868 0.0 0.0 0.0
1997 346 0.0 0.0 0.0
1998 365 0.0 0.0 0.0
1999 343 0.0 0.0 0.0
2000 353 0.0 0.0 0.0
2001 983 0.0 0.0 0.0

For data sources see[5]

References