X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645180605020

Well Details

Well ID: 0645180605020
Loading map...
Location: 02/05-06-064-18W5/0
Location Alias: 02/05-06-64-18 W5M
Location Alias 2: 02/05-06-064-18 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 18
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY 102 HZ KAYBOB 5-6-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0479997
License Date: 2016-07-29
License Status: Issued
Spud Date: 2016-09-23
Final Drill Date: 2016-10-01
Well Total Depth: 3620.00 m
Surface Hole Latitude: 54.506375
Surface Hole Longitude: -116.697208

For data sources see[1][2]

Well History

Date Event
2016-07-29 Obtained License
2016-09-24 Surface Casing Operation Performed
2016-09-26 Direction Drilling Operation Performed - Deviate
2016-09-28 Intermediate Casing Operation Performed
2016-09-29 Direction Drilling Operation Performed - Horizontal
2016-09-30 Well Log Performed
2016-10-01 Finished Drilling
2016-10-01 Well Log Performed
2016-10-01 Well Mode changed to Drilled and Cased
2016-10-02 Liner Casing Operation Performed
2016-10-03 Rig Released
2016-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-10 Perforation Treatment Performed - Open-Hole Completion
2016-11-12 Well Began Production
2016-11-12 Well Fluid changed to Crude Oil
2016-11-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-23 Precision Drilling Corporation 391 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-26 927.50 Deviate (5 - 79 degrees)
2016-09-29 1985.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-10 Open Hole/Barefoot Completion 3616.70 3620.00 0
2016-11-10 Multi-Stage Fracture 3209.50 3209.60 0
2016-11-10 Multi-Stage Fracture 3155.20 3155.30 0
2016-11-10 Multi-Stage Fracture 3116.50 3116.60 0
2016-11-10 Multi-Stage Fracture 3063.60 3063.70 0
2016-11-10 Multi-Stage Fracture 3011.20 3011.30 0
2016-11-10 Multi-Stage Fracture 2960.50 2960.60 0
2016-11-10 Multi-Stage Fracture 2909.70 2909.80 0
2016-11-10 Multi-Stage Fracture 2858.60 2858.70 0
2016-11-10 Multi-Stage Fracture 2809.10 2809.20 0
2016-11-10 Multi-Stage Fracture 2766.20 2766.30 0
2016-11-10 Multi-Stage Fracture 3601.50 3601.60 0
2016-11-10 Multi-Stage Fracture 2714.00 2714.10 0
2016-11-10 Multi-Stage Fracture 2665.30 2665.40 0
2016-11-10 Multi-Stage Fracture 2611.40 2611.50 0
2016-11-10 Multi-Stage Fracture 2558.40 2558.50 0
2016-11-10 Multi-Stage Fracture 2518.00 2518.10 0
2016-11-10 Multi-Stage Fracture 2464.20 2464.30 0
2016-11-10 Multi-Stage Fracture 2412.30 2412.40 0
2016-11-10 Multi-Stage Fracture 2361.50 2361.60 0
2016-11-10 Multi-Stage Fracture 2308.20 2308.30 0
2016-11-10 Multi-Stage Fracture 2256.70 2256.80 0
2016-11-10 Multi-Stage Fracture 3562.20 3562.30 0
2016-11-10 Multi-Stage Fracture 2217.10 2217.20 0
2016-11-10 Multi-Stage Fracture 2178.30 2178.40 0
2016-11-10 Multi-Stage Fracture 2139.00 2139.10 0
2016-11-10 Multi-Stage Fracture 2099.20 2099.30 0
2016-11-10 Multi-Stage Fracture 2061.30 2061.40 0
2016-11-10 Multi-Stage Fracture 3510.00 3510.10 0
2016-11-10 Multi-Stage Fracture 3459.70 3459.80 0
2016-11-10 Multi-Stage Fracture 3407.70 3407.80 0
2016-11-10 Multi-Stage Fracture 3366.90 3367.00 0
2016-11-10 Multi-Stage Fracture 3312.30 3312.40 0
2016-11-10 Multi-Stage Fracture 3261.20 3261.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-10 2016-11-10 1,861 2,010 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 76.3093 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 17.1728 N/A
DWP-966 Calfrac Bactericide/Biocide Bronopol 52-51-7 100 0.0363 N/A
Methanol 67-56-1 100 0.0363 N/A
Water 7732-18-5 100 0.0363 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0389 N/A
Water 7732-18-5 100 0.0389 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0664 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0711 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0711 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 5.8539 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.451 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-11-09 2016-11-16 Surface Water - Runoff 2010

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1007 0.0 0.0 0.0
2017 7658 0.0 0.0 0.0
2018 7769 0.0 0.0 0.0
2019 8328 0.0 0.0 0.0
2020 2175 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-03 No Incident Encountered 0.00 0.00
2016-11-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References