If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645180702000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.530165,"lon":-116.705466,"icon":""}]} |
| Location: 00/02-07-064-18W5/0 | |
| Location Alias: 00/02-07-64-18 W5M | |
| Location Alias 2: 00/02-07-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 07 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY HZ KAYBOB 2-7-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0446090 | |
| License Date: 2012-05-25 | |
| License Status: Issued | |
| Spud Date: 2012-09-24 | |
| Final Drill Date: 2012-10-10 | |
| Well Total Depth: 3650.00 m | |
| Surface Hole Latitude: 54.530165 | |
| Surface Hole Longitude: -116.705466 |
| Date | Event |
|---|---|
| 2012-05-25 | Obtained License |
| 2012-09-26 | Surface Casing Operation Performed |
| 2012-09-28 | Direction Drilling Operation Performed - Deviate |
| 2012-10-03 | Direction Drilling Operation Performed - Horizontal |
| 2012-10-04 | Intermediate Casing Operation Performed |
| 2012-10-10 | Finished Drilling |
| 2012-10-10 | Well Log Performed |
| 2012-10-10 | Well Mode changed to Drilled and Cased |
| 2012-10-12 | Liner Casing Operation Performed |
| 2012-10-13 | Rig Released |
| 2012-11-08 | Well Log Performed |
| 2012-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-11-13 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-11-16 | Well Began Production |
| 2012-11-16 | Well Fluid changed to Crude Oil |
| 2012-11-16 | Well Mode changed to Flowing |
| 2013-01-05 | Well Log Performed |
| 2013-02-14 | Well Fluid changed to Crude Oil |
| 2013-02-14 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-09-24 | Precision Drilling Corporation | 225 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-09-28 | 674.70 | Deviate (5 - 79 degrees) |
| 2012-10-03 | 2009.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-11-13 | Open Hole/Barefoot Completion | 3644.80 | 3650.00 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3056.50 | 3056.60 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2982.10 | 2982.20 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2907.70 | 2907.80 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2833.30 | 2833.40 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2759.10 | 2759.20 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2684.60 | 2684.70 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2610.10 | 2610.60 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2535.90 | 2536.00 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2461.60 | 2461.70 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2387.70 | 2387.80 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3635.70 | 3636.80 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2313.20 | 2313.30 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2239.70 | 2239.80 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2165.40 | 2165.50 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 2104.90 | 2105.00 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3574.60 | 3574.70 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3500.40 | 3500.50 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3428.10 | 3428.20 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3353.80 | 3353.90 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3279.30 | 3279.40 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3204.90 | 3205.00 | 0 |
| 2012-11-13 | Multi-Stage Fracture | 3130.90 | 3131.00 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 647 | 0.0 | 0.0 | 0.0 |
| 2013 | 7495 | 0.0 | 0.0 | 0.0 |
| 2014 | 8280 | 0.0 | 0.0 | 0.0 |
| 2015 | 7805 | 0.0 | 0.0 | 0.0 |
| 2016 | 5567 | 0.0 | 0.0 | 0.0 |
| 2017 | 4290 | 0.0 | 0.0 | 0.0 |
| 2018 | 7289 | 0.0 | 0.0 | 0.0 |
| 2019 | 7917 | 0.0 | 0.0 | 0.0 |
| 2020 | 1119 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-13 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]