If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645181616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.530131,"lon":-116.641263,"icon":""}]} |
| Location: 00/16-16-064-18W5/0 | |
| Location Alias: 00/16-16-64-18 W5M | |
| Location Alias 2: 00/16-16-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 16 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY HZ KAYBOB 16-16-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0450915 | |
| License Date: 2012-11-27 | |
| License Status: Suspension | |
| Spud Date: 2012-12-02 | |
| Final Drill Date: 2012-12-15 | |
| Well Total Depth: 3552.00 m | |
| Surface Hole Latitude: 54.530131 | |
| Surface Hole Longitude: -116.641263 |
| Date | Event |
|---|---|
| 2012-11-27 | Obtained License |
| 2012-12-04 | Surface Casing Operation Performed |
| 2012-12-09 | Direction Drilling Operation Performed - Deviate |
| 2012-12-09 | Direction Drilling Operation Performed - Horizontal |
| 2012-12-09 | Intermediate Casing Operation Performed |
| 2012-12-10 | Well Log Performed |
| 2012-12-15 | Finished Drilling |
| 2012-12-15 | Well Log Performed |
| 2012-12-15 | Well Mode changed to Drilled and Cased |
| 2012-12-16 | Liner Casing Operation Performed |
| 2012-12-17 | Rig Released |
| 2012-12-30 | Well Log Performed |
| 2013-01-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-01-03 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-01-12 | Well Began Production |
| 2013-01-12 | Well Fluid changed to Crude Oil |
| 2013-01-12 | Well Mode changed to Flowing |
| 2013-02-28 | Well Fluid changed to Crude Oil |
| 2013-02-28 | Well Mode changed to Pumping |
| 2016-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-12-02 | Ensign Drilling Inc. | 116 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-12-09 | 646.30 | Deviate (5 - 79 degrees) |
| 2012-12-09 | 2031.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-01-03 | Open Hole/Barefoot Completion | 3547.00 | 3552.00 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2952.10 | 2952.20 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2893.00 | 2893.10 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2807.60 | 2807.70 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2734.60 | 2734.70 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2662.40 | 2662.50 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2591.40 | 2591.50 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2519.20 | 2519.30 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2435.20 | 2435.30 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2365.60 | 2365.70 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2292.70 | 2292.80 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3524.20 | 3524.30 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2218.80 | 2218.90 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2144.60 | 2144.70 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 2085.00 | 2085.10 | 0 |
| 2016-02-26 | Acid Treatment | 3524.20 | 3524.30 | 0 |
| 2016-02-26 | Acid Treatment | 3462.30 | 3462.40 | 0 |
| 2016-02-26 | Acid Treatment | 3403.00 | 3403.10 | 0 |
| 2016-02-26 | Acid Treatment | 3316.60 | 3316.70 | 0 |
| 2016-02-26 | Acid Treatment | 3243.60 | 3243.70 | 0 |
| 2016-02-26 | Acid Treatment | 3170.80 | 3170.90 | 0 |
| 2016-02-26 | Acid Treatment | 3098.00 | 3098.10 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3462.30 | 3462.40 | 0 |
| 2016-02-26 | Acid Treatment | 3025.10 | 3025.20 | 0 |
| 2016-02-26 | Acid Treatment | 2952.10 | 2952.20 | 0 |
| 2016-02-26 | Acid Treatment | 2893.00 | 2893.10 | 0 |
| 2016-02-26 | Acid Treatment | 2807.60 | 2807.70 | 0 |
| 2016-02-26 | Acid Treatment | 2734.60 | 2734.70 | 0 |
| 2016-02-26 | Acid Treatment | 2662.40 | 2662.50 | 0 |
| 2016-02-26 | Acid Treatment | 2591.40 | 2591.50 | 0 |
| 2016-02-26 | Acid Treatment | 2519.20 | 2519.30 | 0 |
| 2016-02-26 | Acid Treatment | 2435.20 | 2435.30 | 0 |
| 2016-02-26 | Acid Treatment | 2365.60 | 2365.70 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3403.00 | 3403.10 | 0 |
| 2016-02-26 | Acid Treatment | 2292.70 | 2292.80 | 0 |
| 2016-02-26 | Acid Treatment | 2218.80 | 2218.90 | 0 |
| 2016-02-26 | Acid Treatment | 2144.60 | 2144.70 | 0 |
| 2016-02-26 | Acid Treatment | 2085.00 | 2085.10 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3316.60 | 3316.70 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3243.60 | 3243.70 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3170.80 | 3170.90 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3098.00 | 3098.10 | 0 |
| 2013-01-03 | Multi-Stage Fracture | 3025.10 | 3025.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-01-03 | 2013-01-03 | 1,835 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Oil | Not Available | 100 | 73.0992 | N/A | |||
| 20/40 WinnBay Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 16.9308 | N/A | ||
| DHP-202 | Calfrac | Activator | Non-Hazardous Ingredients | Trade Secret | 100 | 0.5287 | N/A | |
| Sulfuric acid | 7664-93-9 | 100 | 0.546 | N/A | ||||
| Sulfuric acid. iron(2+) salt (1:?) | 16547-58-3 | 100 | 0.5287 | N/A | ||||
| DHP-903 | Calfrac | Breaker | 1-Hexanol. 2-ethyl- | 104-76-7 | 100 | 0.3896 | N/A | |
| Ethanol. 2.2'-iminobis- | 111-42-2 | 100 | 0.3922 | N/A | ||||
| Fatty Amine #1 | 8842 | 100 | 0.3813 | N/A | ||||
| Fatty Amine #2 | 8842 | 100 | 0.3813 | N/A | ||||
| Magnesium oxide (MgO) | 1309-48-4 | 100 | 0.3835 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.3819 | N/A | ||||
| DAP-131 | Calfrac | Demulsifier | 2-Propanol | 67-63-0 | 100 | 0.0049 | N/A | |
| Inorganic acid | 8692 | 100 | 0.0043 | N/A | ||||
| Sulfonated hydrocarbon | 8692 | 100 | 0.0043 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 8.4203 | N/A | |
| DHP-201 | Calfrac | Gelling Agent | 1-Decanol | 112-30-1 | 100 | 0.6533 | N/A | |
| 1-Octanol | 111-87-5 | 100 | 0.6533 | N/A | ||||
| Phosphoric acid. mixed decyl and Et and octyl esters | 68412-60-2 | 100 | 0.6387 | N/A |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 7961 | 0.0 | 0.0 | 0.0 |
| 2014 | 8582 | 0.0 | 0.0 | 0.0 |
| 2015 | 8182 | 0.0 | 0.0 | 0.0 |
| 2016 | 436 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-12-18 | No Incident Encountered | 0.00 | 0.00 |
| 2013-01-07 | No Incident Encountered | 0.00 | 0.00 |
| 2016-02-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]