X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645182101000

Well Details

Well ID: 0645182101000
Loading map...
Location: 00/01-21-064-18W5/0
Location Alias: 00/01-21-64-18 W5M
Location Alias 2: 00/01-21-064-18 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 18
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOB 1-21-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0437148
License Date: 2011-09-26
License Status: Issued
Spud Date: 2011-10-19
Final Drill Date: 2011-11-03
Well Total Depth: 4003.00 m
Surface Hole Latitude: 54.530535
Surface Hole Longitude: -116.654006

For data sources see[1][2]

Well History

Date Event
2011-09-26 Obtained License
2011-10-22 Surface Casing Operation Performed
2011-10-27 Direction Drilling Operation Performed - Horizontal
2011-10-28 Intermediate Casing Operation Performed
2011-11-03 Finished Drilling
2011-11-03 Well Mode changed to Drilled and Cased
2011-11-04 Well Log Performed
2011-11-05 Liner Casing Operation Performed
2011-11-06 Rig Released
2011-12-08 Well Log Performed
2011-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-15 Perforation Treatment Performed - Open-Hole Completion
2012-04-27 Well Began Production
2012-04-27 Well Fluid changed to Crude Oil
2012-04-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-27 2000.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-15 Open Hole/Barefoot Completion 3998.00 4003.00 0
2011-12-15 Multi-Stage Fracture 3398.50 3474.80 0
2011-12-15 Multi-Stage Fracture 3322.10 3398.40 0
2011-12-15 Multi-Stage Fracture 3245.90 3322.00 0
2011-12-15 Multi-Stage Fracture 3170.50 3245.80 0
2011-12-15 Multi-Stage Fracture 3093.90 3170.40 0
2011-12-15 Multi-Stage Fracture 3018.40 3093.80 0
2011-12-15 Multi-Stage Fracture 2942.30 3018.30 0
2011-12-15 Multi-Stage Fracture 2877.80 2942.20 0
2011-12-15 Multi-Stage Fracture 2801.20 2877.70 0
2011-12-15 Multi-Stage Fracture 2725.30 2801.10 0
2011-12-15 Multi-Stage Fracture 3988.70 4003.00 0
2011-12-15 Multi-Stage Fracture 2648.90 2725.20 0
2011-12-15 Multi-Stage Fracture 2572.00 2648.80 0
2011-12-15 Multi-Stage Fracture 2496.10 2571.90 0
2011-12-15 Multi-Stage Fracture 2425.30 2496.00 0
2011-12-15 Multi-Stage Fracture 2347.40 2425.20 0
2011-12-15 Multi-Stage Fracture 2270.60 2347.30 0
2011-12-15 Multi-Stage Fracture 2195.10 2270.50 0
2011-12-15 Multi-Stage Fracture 2118.50 2195.00 0
2011-12-15 Multi-Stage Fracture 2066.60 2118.40 0
2011-12-15 Multi-Stage Fracture 3922.80 3988.60 0
2011-12-15 Multi-Stage Fracture 3846.50 3922.70 0
2011-12-15 Multi-Stage Fracture 3769.50 3846.40 0
2011-12-15 Multi-Stage Fracture 3704.40 3769.40 0
2011-12-15 Multi-Stage Fracture 3627.80 3704.30 0
2011-12-15 Multi-Stage Fracture 3551.70 3627.70 0
2011-12-15 Multi-Stage Fracture 3474.90 3551.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5593 0.0 0.0 0.0
2013 7060 0.0 0.0 0.0
2014 8256 0.0 0.0 0.0
2015 7551 0.0 0.0 0.0
2016 8339 0.0 0.0 0.0
2017 6975 0.0 0.0 0.0
2018 6762 0.0 0.0 0.0
2019 7187 0.0 0.0 0.0
2020 2106 0.0 0.0 0.0

For data sources see[6]

References