X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645190502000

Well Details

Well ID: 0645190502000
Loading map...
Location: 00/02-05-064-19W5/0
Location Alias: 00/02-05-64-19 W5M
Location Alias 2: 00/02-05-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 2-5-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0017415
License Date: 1959-07-13
License Status: Suspension
Spud Date: 1959-09-04
Final Drill Date: 1959-09-25
Well Total Depth: 3078.50 m
Surface Hole Latitude: 54.503531
Surface Hole Longitude: -116.833568

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-07-13 Obtained License
1959-09-13 Drill Stem Test Performed
1959-09-18 Drill Stem Test Performed
1959-09-25 Finished Drilling
1959-09-25 Well Mode changed to Drilled and Cased
1959-09-28 Production Casing Operation Performed
1959-10-02 Perforation Treatment Performed - Jet Perforation
1959-10-06 Well Began Production
1959-10-06 Well Fluid changed to Crude Oil
1959-10-06 Well Mode changed to Flowing
1968-11-09 Well Began Injection
1968-11-09 Well Fluid changed to Water
1968-11-09 Well Type changed to Injection
1968-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-01 Well Fluid changed to Water
1998-08-01 Well Mode changed to Suspended
1998-08-01 Well Type changed to Injection
2013-12-21 Well Log Performed
2013-12-22 Well Log Performed
2014-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-05 Plug Back Performed
2014-01-05 Well Fluid changed to Water
2014-01-05 Well Mode changed to Abandoned Zone
2014-01-05 Well Type changed to Injection
2014-01-10 Perforation Treatment Performed - Cement Plug
2014-01-10 Plug Back Performed
2014-01-12 Perforation Treatment Performed - Cement Plug
2014-01-12 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-10-02 Perforation 3004.10 3018.70 13
2014-01-12 Cement Plug 2551.40 2559.40 0
1959-10-02 Perforation 3021.20 3027.90 13
1959-10-02 Perforation 3029.10 3033.40 13
1959-10-02 Perforation 3040.10 3045.00 13
1968-12-12 Acid Treatment 3004.10 3045.00 0
1969-12-23 Acid Treatment 3004.10 3045.00 0
1977-10-28 Acid Treatment 3004.10 3045.00 0
2014-01-05 Packing Device Capped w/Cement 2987.20 2995.20 0
2014-01-10 Cement Plug 2559.40 2601.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3283 0.0 0.0 0.0
1968 6083 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1971-02-20 No Incident Encountered 0.00 0.00
2014-01-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References