If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645191016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.528642,"lon":-116.777239,"icon":""}]} |
| Location: 00/16-10-064-19W5/0 | |
| Location Alias: 00/16-10-64-19 W5M | |
| Location Alias 2: 00/16-10-064-19 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 19 | |
| Section: 10 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY BHLU 1 KAYBOB 16-10-64-19 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0131684 | |
| License Date: 1988-01-26 | |
| License Status: Abandoned | |
| Spud Date: 1988-01-29 | |
| Final Drill Date: 1988-03-10 | |
| Well Total Depth: 3027.00 m | |
| Surface Hole Latitude: 54.528642 | |
| Surface Hole Longitude: -116.777239 |
| Date | Event |
|---|---|
| 1988-01-26 | Obtained License |
| 1988-02-03 | Surface Casing Operation Performed |
| 1988-02-13 | Drill Stem Test Performed |
| 1988-02-15 | Lost Circulation Occurred |
| 1988-02-17 | Lost Circulation Occurred |
| 1988-02-29 | Well Log Performed |
| 1988-03-03 | Production Casing Operation Performed |
| 1988-03-10 | Finished Drilling |
| 1988-03-10 | Perforation Treatment Performed - Open-Hole Completion |
| 1988-03-10 | Well Log Performed |
| 1988-03-10 | Well Mode changed to Drilled and Cased |
| 1988-03-11 | Well Log Performed |
| 1988-03-12 | Well Log Performed |
| 1988-03-13 | Drill Stem Test Performed |
| 1988-03-14 | Drill Stem Test Performed |
| 1988-03-15 | Drill Stem Test Performed |
| 1988-03-17 | Rig Released |
| 1988-03-23 | Well Log Performed |
| 1988-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-05-07 | Well Log Performed |
| 1988-05-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-05-10 | Well Log Performed |
| 1988-06-22 | Well Began Production |
| 1988-06-22 | Well Fluid changed to Crude Oil |
| 1988-06-22 | Well Mode changed to Flowing |
| 1990-12-17 | Perforation Treatment Performed - Jet Perforation |
| 1990-12-17 | Well Log Performed |
| 1990-12-18 | Perforation Treatment Performed - Jet Perforation |
| 1990-12-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-12-20 | Perforation Treatment Performed - Open-Hole Completion |
| 1990-12-20 | Well Log Performed |
| 1991-01-08 | Well Log Performed |
| 1993-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-11-26 | Plug Back Performed |
| 1993-11-26 | Well Fluid changed to Crude Oil |
| 1993-11-26 | Well Mode changed to Abandoned and Whipstocked |
| 2018-12-12 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1988-03-10 | Open Hole/Barefoot Completion | 2930.00 | 3027.00 | 0 |
| 1988-05-07 | Acid Treatment | 2935.00 | 2954.00 | 0 |
| 1988-05-08 | Acid Treatment | 2963.00 | 2975.00 | 0 |
| 1990-12-17 | Perforation | 2936.00 | 2941.00 | 13 |
| 1990-12-18 | Perforation | 2945.00 | 2953.00 | 13 |
| 1990-12-18 | Perforation | 2964.00 | 2969.00 | 13 |
| 1990-12-20 | Packing Device Capped w/Cement | 2990.00 | 2995.00 | 0 |
| 1990-12-20 | Open Hole/Barefoot Completion | 2930.00 | 2990.00 | 0 |
| 1993-11-26 | Packing Device Capped w/Cement | 2912.00 | 2920.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1988 | 4520 | 0.0 | 0.0 | 0.0 |
| 1989 | 8299 | 0.0 | 0.0 | 0.0 |
| 1990 | 7016 | 0.0 | 0.0 | 0.0 |
| 1991 | 8075 | 0.0 | 0.0 | 0.0 |
| 1992 | 5109 | 0.0 | 0.0 | 0.0 |
| 1993 | 7510 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1988-02-15 | Lost Circulation | 1882.00 | 1882.00 |
| 1988-02-17 | Lost Circulation | 2080.00 | 2460.00 |
For data sources see[6]