X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645191503002

Well Details

Well ID: 0645191503002
Loading map...
Location: 00/03-15-064-19W5/2
Location Alias: 00/03-15-64-19 W5M
Location Alias 2: 00/03-15-064-19 W5/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY ET AL KAYBOB 3-15-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0218112
License Date: 1998-10-15
License Status: Suspension
Spud Date: 1998-11-11
Final Drill Date: 1998-11-25
Well Total Depth: 1900.00 m
Surface Hole Latitude: 54.533964
Surface Hole Longitude: -116.790863

For data sources see[1][2]

Well History

Date Event
1998-10-15 Obtained License
1998-11-12 Surface Casing Operation Performed
1998-11-25 Finished Drilling
1998-11-25 Well Log Performed
1998-11-25 Well Mode changed to Drilled and Cased
1998-11-27 Drill Stem Test Performed
1998-11-28 Drill Stem Test Performed
1998-11-30 Production Casing Operation Performed
1998-11-30 Rig Released
1998-12-02 Well Log Performed
1998-12-05 Perforation Treatment Performed - Jet Perforation
1998-12-05 Well Log Performed
1999-03-27 Perforation Treatment Performed - Jet Perforation
1999-03-27 Well Log Performed
1999-03-28 Perforation Treatment Performed - Remedial Casing
1999-04-02 Perforation Treatment Performed - Jet Perforation
1999-04-02 Well Log Performed
1999-04-05 Perforation Treatment Performed - Fractured
2001-11-23 Perforation Treatment Performed - Jet Perforation
2001-11-23 Well Log Performed
2001-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-24 Perforation Treatment Performed - Cement Squeeze
2001-11-24 Plug Back Performed
2001-11-27 Perforation Treatment Performed - Jet Perforation
2001-11-27 Well Log Performed
2001-11-30 Perforation Treatment Performed - Fractured
2002-01-06 Well Began Production
2002-01-06 Well Fluid changed to Gas
2002-01-06 Well Mode changed to Flowing
2013-03-26 Well Fluid changed to Gas
2013-03-26 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-05 Perforation 1731.50 1737.00 18
2001-11-24 Cement Squeeze 1788.00 1789.00 0
2001-11-24 Cement Squeeze 1815.00 1816.00 0
2001-11-27 Perforation 1801.50 1807.00 17
2001-11-30 Fracture 1801.50 1807.00 0
1999-03-27 Perforation 1718.00 1718.90 11
1999-03-27 Perforation 1724.00 1724.90 11
1999-03-28 Remedial Casing Cementing 1718.00 1724.90 0
1999-04-02 Perforation 1731.50 1737.00 18
1999-04-05 Fracture 1731.50 1737.00 0
2001-11-23 Perforation 1815.00 1816.00 13
2001-11-23 Perforation 1788.00 1789.00 13
2001-11-24 Acid Treatment 1788.00 1789.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6293 0.0 0.0 0.0
2003 8170 0.0 0.0 0.0
2004 8665 0.0 0.0 0.0
2005 8716 0.0 0.0 0.0
2006 7957 0.0 0.0 0.0
2007 8639 0.0 0.0 0.0
2008 8677 0.0 0.0 0.0
2009 8428 0.0 0.0 0.0
2010 8469 0.0 0.0 0.0
2011 7833 0.0 0.0 0.0
2012 837 0.0 0.0 0.0

For data sources see[5]

References