X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645191512000

Well Details

Well ID: 0645191512000
Loading map...
Location: 00/12-15-064-19W5/0
Location Alias: 00/12-15-64-19 W5M
Location Alias 2: 00/12-15-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 12-15-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0014249
License Date: 1957-11-12
License Status: Issued
Spud Date: 1957-11-15
Final Drill Date: 1958-01-11
Well Total Depth: 2994.70 m
Surface Hole Latitude: 54.539847
Surface Hole Longitude: -116.795628

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-11-12 Obtained License
1958-01-11 Finished Drilling
1958-01-11 Well Mode changed to Drilled and Cased
1958-01-14 Production Casing Operation Performed
1958-01-18 Perforation Treatment Performed - Jet Perforation
1958-01-19 Perforation Treatment Performed - Jet Perforation
1958-01-20 Well Began Production
1958-01-20 Well Fluid changed to Crude Oil
1958-01-20 Well Mode changed to Flowing
1958-12-04 Drill Stem Test Performed
1973-12-07 Well Fluid changed to Crude Oil
1973-12-07 Well Mode changed to Suspended
1978-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-30 Well Began Injection
1978-08-30 Well Fluid changed to Water
1978-08-30 Well Type changed to Injection
1979-06-21 Perforation Treatment Performed - Jet Perforation
1982-03-31 Perforation Treatment Performed - Fractured
1985-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-15 Well Fluid changed to Solvent
1988-07-15 Well Type changed to Injection
1989-04-17 Well Log Performed
1990-05-31 Well Log Performed
1990-06-04 Well Log Performed
1990-06-15 Perforation Treatment Performed - Cement Squeeze
1990-06-20 Perforation Treatment Performed - Jet Perforation
1990-06-20 Well Log Performed
1990-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-24 Perforation Treatment Performed - Cement Squeeze
1990-06-28 Perforation Treatment Performed - Jet Perforation
1990-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-09 Well Log Performed
2007-06-01 Well Fluid changed to Water
2007-06-01 Well Type changed to Injection
2013-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-01-18 Perforation 2961.70 2963.30 13
1985-07-30 Acid Treatment 2934.30 2969.10 0
1985-11-13 Acid Treatment 2934.30 2969.10 0
1987-02-25 Acid Treatment 2934.30 2969.10 0
1987-08-23 Acid Treatment 2934.30 2969.10 0
1990-06-15 Cement Squeeze 2934.30 2969.10 0
1990-06-20 Perforation 2934.50 2942.50 4
1990-06-20 Perforation 2943.50 2946.00 4
1990-06-20 Perforation 2947.80 2958.00 13
1990-06-20 Perforation 2958.90 2960.20 13
1990-06-20 Perforation 2961.70 2966.30 13
1958-01-19 Perforation 2943.50 2957.80 13
1990-06-20 Perforation 2967.80 2969.00 13
1990-06-23 Acid Treatment 2934.50 2969.00 0
1990-06-24 Cement Squeeze 2934.50 2957.80 0
1990-06-28 Perforation 2934.50 2942.50 4
1990-06-28 Perforation 2943.50 2946.00 4
1990-06-28 Perforation 2947.80 2958.00 13
1990-07-03 Acid Treatment 2934.50 2969.00 0
2013-01-23 Acid Treatment 2934.50 2942.50 0
2013-01-23 Acid Treatment 2943.50 2946.00 0
2013-01-23 Acid Treatment 2947.80 2958.00 0
1958-01-19 Perforation 2934.30 2942.50 13
2013-01-23 Acid Treatment 2958.00 2969.10 0
1978-03-11 Acid Treatment 2934.30 2963.30 0
1979-06-21 Perforation 2958.90 2960.20 7
1979-06-21 Perforation 2961.70 2966.30 7
1979-06-21 Perforation 2967.80 2969.10 7
1982-03-31 Fracture 2934.30 2969.10 0
1985-05-04 Acid Treatment 2934.30 2969.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6009 0.0 0.0 0.0
1968 7971 0.0 0.0 0.0
1969 8334 0.0 0.0 0.0
1970 2663 0.0 0.0 0.0
1974 13 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-07-10 No Incident Encountered 0.00 0.00
2013-02-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References