X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645192202000

Well Details

Well ID: 0645192202000
Loading map...
Location: 00/02-22-064-19W5/0
Location Alias: 00/02-22-64-19 W5M
Location Alias 2: 00/02-22-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY BHLU 1 KAYBOB 2-22-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0151092
License Date: 1991-12-18
License Status: Suspension
Spud Date: 1992-01-25
Final Drill Date: 1992-02-12
Well Total Depth: 3014.00 m
Surface Hole Latitude: 54.545806
Surface Hole Longitude: -116.780102

For data sources see[1][2]

Well History

Date Event
1991-12-18 Obtained License
1992-01-26 Surface Casing Operation Performed
1992-02-12 Finished Drilling
1992-02-12 Well Log Performed
1992-02-12 Well Mode changed to Drilled and Cased
1992-02-15 Production Casing Operation Performed
1992-02-16 Rig Released
1992-02-22 Perforation Treatment Performed - Jet Perforation
1992-02-22 Well Log Performed
1992-02-24 Perforation Treatment Performed - Fractured
1992-03-13 Well Began Production
1992-03-13 Well Fluid changed to Crude Oil
1992-03-13 Well Mode changed to Flowing
2000-10-24 Well Fluid changed to Crude Oil
2000-10-24 Well Mode changed to Pumping
2002-12-16 Perforation Treatment Performed - Chemical Squeeze
2002-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-11 Well Log Performed
2013-02-14 Well Log Performed
2014-12-08 Well Fluid changed to Crude Oil
2014-12-08 Well Mode changed to Suspended
2018-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-19 Plug Back Performed
2018-10-19 Well Fluid changed to Crude Oil
2018-10-19 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-22 Perforation 2939.50 2941.50 13
2002-12-16 Chemical Squeeze 2957.50 2962.00 0
2002-12-16 Chemical Squeeze 2965.00 2967.00 0
2002-12-17 Acid Treatment 2939.50 2941.50 0
2002-12-17 Acid Treatment 2943.20 2944.60 0
2002-12-17 Acid Treatment 2948.50 2950.80 0
2002-12-17 Acid Treatment 2957.50 2962.00 0
2002-12-17 Acid Treatment 2965.00 2967.00 0
2018-10-19 Packing Device Capped w/Cement 2916.00 2924.00 0
1992-02-22 Perforation 2943.20 2944.60 13
1992-02-22 Perforation 2948.50 2950.80 13
1992-02-22 Perforation 2957.50 2962.00 13
1992-02-22 Perforation 2965.00 2967.00 13
1992-02-24 Fracture 2935.50 2967.00 0
2002-12-16 Chemical Squeeze 2939.50 2941.50 0
2002-12-16 Chemical Squeeze 2943.20 2944.60 0
2002-12-16 Chemical Squeeze 2948.50 2950.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5610 0.0 0.0 0.0
1993 7645 0.0 0.0 0.0
1994 8605 0.0 0.0 0.0
1995 8747 0.0 0.0 0.0
1996 8475 0.0 0.0 0.0
1997 8398 0.0 0.0 0.0
1998 7157 0.0 0.0 0.0
1999 8667 0.0 0.0 0.0
2000 8562 0.0 0.0 0.0
2001 8358 0.0 0.0 0.0
2002 6828 0.0 0.0 0.0
2003 8146 0.0 0.0 0.0
2004 8515 0.0 0.0 0.0
2005 8596 0.0 0.0 0.0
2006 8044 0.0 0.0 0.0
2007 8013 0.0 0.0 0.0
2008 7970 0.0 0.0 0.0
2009 8291 0.0 0.0 0.0
2010 7956 0.0 0.0 0.0
2011 8276 0.0 0.0 0.0
2012 8287 0.0 0.0 0.0
2013 2112 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References