X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645192712000

Well Details

Well ID: 0645192712000
Loading map...
Location: 00/12-27-064-19W5/0
Location Alias: 00/12-27-64-19 W5M
Location Alias 2: 00/12-27-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 12-27-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0017601
License Date: 1959-08-19
License Status: Issued
Spud Date: 1959-09-05
Final Drill Date: 1959-10-12
Well Total Depth: 2963.60 m
Surface Hole Latitude: 54.568940
Surface Hole Longitude: -116.795639

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-19 Obtained License
1959-09-13 Drill Stem Test Performed
1959-10-12 Finished Drilling
1959-10-12 Well Mode changed to Drilled and Cased
1959-10-14 Production Casing Operation Performed
1959-10-17 Perforation Treatment Performed - Jet Perforation
1959-10-19 Well Began Production
1959-10-19 Well Fluid changed to Crude Oil
1959-10-19 Well Mode changed to Flowing
1972-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-10 Well Fluid changed to Crude Oil
1982-01-10 Well Mode changed to Suspended
1985-02-19 Well Log Performed
1985-02-27 Well Fluid changed to Crude Oil
1985-02-27 Well Mode changed to Flowing
1985-10-29 Well Log Performed
1989-01-29 Well Log Performed
1989-01-30 Perforation Treatment Performed - Jet Perforation
1989-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-24 Well Began Injection
1989-02-24 Well Fluid changed to Solvent
1989-02-24 Well Type changed to Injection
1989-06-29 Well Log Performed
1989-10-17 Well Log Performed
1989-11-15 Well Log Performed
1990-10-15 Well Log Performed
1990-10-16 Well Log Performed
1990-10-17 Well Log Performed
1990-10-18 Perforation Treatment Performed - Cement Squeeze
1990-10-23 Perforation Treatment Performed - Jet Perforation
1990-10-23 Well Log Performed
1990-10-30 Well Log Performed
1991-02-08 Well Log Performed
1991-03-08 Well Log Performed
1991-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-15 Perforation Treatment Performed - Chemical Squeeze
1992-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-01 Well Fluid changed to Water
2007-06-01 Well Type changed to Injection
2017-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-10-17 Perforation 2951.70 2952.90 7
1989-01-31 Acid Treatment 2910.00 2941.80 0
1990-10-18 Cement Squeeze 2910.00 2952.90 0
1990-10-23 Perforation 2910.00 2911.30 13
1990-10-23 Perforation 2914.00 2921.00 13
1990-10-23 Perforation 2924.10 2925.30 13
1990-10-23 Perforation 2926.50 2932.70 13
1990-10-23 Perforation 2932.80 2935.90 13
1990-10-23 Perforation 2936.10 2938.40 13
1990-10-23 Perforation 2938.60 2941.70 13
1990-10-23 Perforation 2941.90 2945.00 13
1959-10-17 Perforation 2946.20 2948.00 7
1990-10-23 Perforation 2945.40 2947.20 13
1990-10-23 Perforation 2946.50 2947.90 13
1991-04-15 Acid Treatment 2910.00 2947.90 0
1991-10-15 Chemical Squeeze 2910.00 2947.90 0
1992-07-24 Acid Treatment 2910.00 2947.90 0
1994-05-13 Acid Treatment 2910.00 2947.90 0
2007-05-14 Acid Treatment 2941.90 2945.00 0
2007-05-14 Acid Treatment 2938.60 2941.70 0
2007-05-14 Acid Treatment 2936.10 2938.40 0
2007-05-14 Acid Treatment 2932.80 2935.90 0
1959-10-17 Perforation 2941.90 2944.40 7
2007-05-14 Acid Treatment 2926.50 2932.70 0
2017-10-12 Acid Treatment 2910.00 2947.90 0
1959-10-17 Perforation 2927.60 2939.50 7
1972-01-09 Acid Treatment 2927.60 2952.90 0
1989-01-30 Perforation 2910.00 2911.30 13
1989-01-30 Perforation 2924.10 2925.30 13
1989-01-30 Perforation 2926.50 2927.20 13
1989-01-30 Perforation 2940.50 2941.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1972 6410 0.0 0.0 0.0
1973 7606 0.0 0.0 0.0
1974 7434 0.0 0.0 0.0
1975 7937 0.0 0.0 0.0
1976 4587 0.0 0.0 0.0
1985 4109 0.0 0.0 0.0
1986 1405 0.0 0.0 0.0
1987 5870 0.0 0.0 0.0
1988 6093 0.0 0.0 0.0
1989 299 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References