X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645192802000

Well Details

Well ID: 0645192802000
Loading map...
Location: 00/02-28-064-19W5/0
Location Alias: 00/02-28-64-19 W5M
Location Alias 2: 00/02-28-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 2-28-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0019074
License Date: 1960-05-20
License Status: Abandoned
Spud Date: 1960-06-01
Final Drill Date: 1960-07-06
Well Total Depth: 2994.70 m
Surface Hole Latitude: 54.561718
Surface Hole Longitude: -116.808396

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-05-20 Obtained License
1960-06-03 Lost Circulation Occurred
1960-07-06 Finished Drilling
1960-07-06 Well Mode changed to Drilled and Cased
1960-07-08 Production Casing Operation Performed
1960-07-10 Perforation Treatment Performed - Jet Perforation
1960-07-10 Well Began Production
1960-07-10 Well Fluid changed to Crude Oil
1960-07-10 Well Mode changed to Flowing
1970-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-01 Well Fluid changed to Crude Oil
1988-04-01 Well Mode changed to Pumping
2002-08-16 Well Log Performed
2002-08-21 Perforation Treatment Performed - Jet Perforation
2002-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-30 Perforation Treatment Performed - Remedial Casing
2008-06-02 Well Log Performed
2008-06-06 Perforation Treatment Performed - Jet Perforation
2008-06-06 Perforation Treatment Performed - Remedial Casing
2008-06-09 Well Log Performed
2009-02-07 Well Log Performed
2009-02-09 Perforation Treatment Performed - Jet Perforation
2009-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-10 Perforation Treatment Performed - Cement Squeeze
2017-10-04 Well Fluid changed to Crude Oil
2017-10-04 Well Mode changed to Suspended
2020-01-09 Well Log Performed
2020-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-10 Plug Back Performed
2020-01-10 Well Fluid changed to Crude Oil
2020-01-10 Well Mode changed to Abandoned Zone
2020-01-11 Well Log Performed
2020-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-20 Perforation Treatment Performed - Jet Perforation
2020-01-20 Plug Back Performed
2020-01-20 Well Log Performed
2020-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-21 Plug Back Performed
2020-01-21 Well Log Performed
2020-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-22 Perforation Treatment Performed - Jet Perforation
2020-01-22 Plug Back Performed
2020-01-22 Well Log Performed
2020-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-24 Well Log Performed
2020-01-25 Perforation Treatment Performed - Cement Plug
2020-01-25 Perforation Treatment Performed - Cement Squeeze
2020-01-25 Plug Back Performed
2020-01-26 Perforation Treatment Performed - Jet Perforation
2020-01-26 Well Log Performed
2020-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-28 Well Log Performed
2020-01-29 Perforation Treatment Performed - Cement Plug
2020-01-29 Perforation Treatment Performed - Cement Squeeze
2020-01-29 Plug Back Performed
2020-01-30 Perforation Treatment Performed - Jet Perforation
2020-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-02 Perforation Treatment Performed - Cement Plug
2020-02-02 Perforation Treatment Performed - Cement Squeeze
2020-02-02 Plug Back Performed
2020-02-11 Well Abandoned
2020-02-11 Well Fluid changed to Crude Oil
2020-02-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-07-10 Perforation 2959.90 2964.50 7
2008-06-06 Remedial Casing Cementing 427.50 428.50 0
2009-02-09 Perforation 1420.00 1422.00 17
2009-02-10 Acid Treatment 1420.00 1422.00 0
2009-02-10 Cement Squeeze 1420.00 1422.00 0
2020-01-10 Packing Device Capped w/Cement 2890.00 2898.00 0
2020-01-20 Packing Device Capped w/Cement 2816.00 2824.00 0
2020-01-20 Perforation 2050.00 2051.00 20
2020-01-21 Packing Device Capped w/Cement 2032.00 2040.00 0
2020-01-22 Packing Device Capped w/Cement 1400.00 1408.00 0
2020-01-22 Perforation 598.00 599.00 20
1960-07-10 Perforation 2941.00 2949.50 7
2020-01-23 Acid Treatment 598.00 599.00 0
2020-01-24 Acid Treatment 598.90 599.00 0
2020-01-25 Cement Squeeze 598.00 599.00 0
2020-01-25 Cement Plug 581.00 590.00 0
2020-01-26 Perforation 409.00 410.00 20
2020-01-27 Acid Treatment 409.00 410.00 0
2020-01-28 Acid Treatment 409.00 410.00 0
2020-01-29 Cement Squeeze 409.00 410.00 0
2020-01-29 Cement Plug 392.00 401.00 0
2020-01-30 Perforation 315.50 316.50 20
1960-07-10 Perforation 2931.60 2938.90 7
2020-01-30 Perforation 315.50 316.50 99
2020-01-31 Acid Treatment 315.50 316.50 0
2020-02-02 Cement Squeeze 315.50 316.50 0
2020-02-02 Cement Plug 298.00 307.00 0
1970-12-17 Acid Treatment 2938.90 2964.50 0
2002-08-21 Perforation 427.50 428.50 13
2002-08-22 Acid Treatment 427.50 428.50 0
2002-08-23 Acid Treatment 427.50 428.50 0
2002-08-30 Remedial Casing Cementing 427.50 428.50 0
2008-06-06 Perforation 427.50 428.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1970 120 0.0 0.0 0.0
1971 5414 0.0 0.0 0.0
1972 7014 0.0 0.0 0.0
1973 7684 0.0 0.0 0.0
1974 7052 0.0 0.0 0.0
1975 7949 0.0 0.0 0.0
1976 6306 0.0 0.0 0.0
1977 7883 0.0 0.0 0.0
1978 5965 0.0 0.0 0.0
1979 6504 0.0 0.0 0.0
1980 6977 0.0 0.0 0.0
1981 7792 0.0 0.0 0.0
1982 7850 0.0 0.0 0.0
1983 8082 0.0 0.0 0.0
1984 7089 0.0 0.0 0.0
1985 8038 0.0 0.0 0.0
1986 8482 0.0 0.0 0.0
1987 8672 0.0 0.0 0.0
1988 7893 0.0 0.0 0.0
1989 7361 0.0 0.0 0.0
1990 7989 0.0 0.0 0.0
1991 8042 0.0 0.0 0.0
1992 7382 0.0 0.0 0.0
1993 8185 0.0 0.0 0.0
1994 8608 0.0 0.0 0.0
1995 8713 0.0 0.0 0.0
1996 7533 0.0 0.0 0.0
1997 6442 0.0 0.0 0.0
1998 8429 0.0 0.0 0.0
1999 8266 0.0 0.0 0.0
2000 7993 0.0 0.0 0.0
2001 8339 0.0 0.0 0.0
2002 6991 0.0 0.0 0.0
2003 7771 0.0 0.0 0.0
2004 7917 0.0 0.0 0.0
2005 1224 0.0 0.0 0.0
2006 8422 0.0 0.0 0.0
2007 8550 0.0 0.0 0.0
2008 6616 0.0 0.0 0.0
2009 6477 0.0 0.0 0.0
2010 5648 0.0 0.0 0.0
2011 8451 0.0 0.0 0.0
2012 7920 0.0 0.0 0.0
2013 3106 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-06-03 Lost Circulation 316.90 316.90
2020-02-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References