X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645192815000

Well Details

Well ID: 0645192815000
Loading map...
Location: 00/15-28-064-19W5/0
Location Alias: 00/15-28-64-19 W5M
Location Alias 2: 00/15-28-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY BLHU 1 KAYBOB 15-28-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0143323
License Date: 1990-02-20
License Status: Suspension
Spud Date: 1990-03-05
Final Drill Date: 1990-03-31
Well Total Depth: 3012.00 m
Surface Hole Latitude: 54.572471
Surface Hole Longitude: -116.805300

For data sources see[1][2]

Well History

Date Event
1990-02-20 Obtained License
1990-03-05 Lost Circulation Occurred
1990-03-08 Surface Casing Operation Performed
1990-03-14 Lost Circulation Occurred
1990-03-31 Finished Drilling
1990-03-31 Well Log Performed
1990-03-31 Well Mode changed to Drilled and Cased
1990-04-02 Production Casing Operation Performed
1990-04-03 Rig Released
1990-04-03 Well Log Performed
1990-04-14 Perforation Treatment Performed - Jet Perforation
1990-04-14 Well Log Performed
1990-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-25 Perforation Treatment Performed - Fractured
1990-05-01 Well Began Production
1990-05-01 Well Fluid changed to Crude Oil
1990-05-01 Well Mode changed to Flowing
1992-07-15 Well Fluid changed to Crude Oil
1992-07-15 Well Mode changed to Pumping
2004-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-04-12 Well Fluid changed to Crude Oil
2007-04-12 Well Mode changed to Suspended
2008-07-15 Well Fluid changed to Crude Oil
2008-07-15 Well Mode changed to Pumping
2009-03-25 Well Fluid changed to Crude Oil
2009-03-25 Well Mode changed to Suspended
2020-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-11 Plug Back Performed
2020-03-11 Well Fluid changed to Crude Oil
2020-03-11 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-04-14 Perforation 2937.40 2947.20 13
1990-04-14 Perforation 2955.10 2958.00 13
1990-04-15 Acid Treatment 2955.10 2958.00 0
1990-04-16 Acid Treatment 2937.40 2947.20 0
1990-04-25 Fracture 2937.40 2958.00 0
2004-11-07 Acid Treatment 2937.40 2947.20 0
2020-03-11 Packing Device Capped w/Cement 2922.00 2930.00 0
2020-03-11 Packing Device Capped w/Cement 2822.00 2830.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3278 0.0 0.0 0.0
1991 5758 0.0 0.0 0.0
1992 6656 0.0 0.0 0.0
1993 8511 0.0 0.0 0.0
1994 8151 0.0 0.0 0.0
1995 8514 0.0 0.0 0.0
1996 7261 0.0 0.0 0.0
1997 8580 0.0 0.0 0.0
1998 8541 0.0 0.0 0.0
1999 8721 0.0 0.0 0.0
2000 8428 0.0 0.0 0.0
2001 7812 0.0 0.0 0.0
2002 8470 0.0 0.0 0.0
2003 7725 0.0 0.0 0.0
2004 7298 0.0 0.0 0.0
2005 4924 0.0 0.0 0.0
2006 48 0.0 0.0 0.0
2008 2256 0.0 0.0 0.0
2009 144 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-03-05 Lost Circulation 227.00 248.00
1990-03-14 Lost Circulation 1859.00 1859.00
2020-03-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References