X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645193410030

Well Details

Well ID: 0645193410030
Loading map...
Location: 03/10-34-064-19W5/0
Location Alias: 03/10-34-64-19 W5M
Location Alias 2: 03/10-34-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY ET AL 03 KAYBOB 10-34-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0184817
License Date: 1996-01-19
License Status: Suspension
Spud Date: 1996-03-01
Final Drill Date: 1996-03-09
Well Total Depth: 1845.00 m
Surface Hole Latitude: 54.584939
Surface Hole Longitude: -116.780432

For data sources see[1][2]

Well History

Date Event
1996-01-19 Obtained License
1996-03-01 Surface Casing Operation Performed
1996-03-05 Drill Stem Test Performed
1996-03-09 Finished Drilling
1996-03-09 Well Log Performed
1996-03-09 Well Mode changed to Drilled and Cased
1996-03-11 Production Casing Operation Performed
1996-03-11 Rig Released
1996-03-16 Perforation Treatment Performed - Jet Perforation
1996-03-16 Well Log Performed
1996-03-17 Perforation Treatment Performed - Fractured
1996-03-21 Well Began Production
1996-03-21 Well Fluid changed to Crude Oil
1996-03-21 Well Mode changed to Pumping
1999-07-09 Well Fluid changed to Crude Oil
1999-07-09 Well Mode changed to Suspended
2008-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-27 Plug Back Performed
2008-10-27 Well Fluid changed to Crude Oil
2008-10-27 Well Log Performed
2008-10-27 Well Mode changed to Abandoned Zone
2008-10-28 Perforation Treatment Performed - Jet Perforation
2008-10-28 Well Log Performed
2008-10-29 Perforation Treatment Performed - Cement Squeeze
2008-11-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-16 Perforation 1773.00 1778.50 18
1996-03-17 Fracture 1773.00 1778.50 0
2008-10-27 Packing Device Capped w/Cement 1758.00 1766.00 0
2008-10-28 Perforation 620.00 621.00 17
2008-10-29 Cement Squeeze 620.00 621.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2959 0.0 0.0 0.0
1997 4504 0.0 0.0 0.0

For data sources see[5]

References