X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645193616000

Well Details

Well ID: 0645193616000
Loading map...
Location: 00/16-36-064-19W5/0
Location Alias: 00/16-36-64-19 W5M
Location Alias 2: 00/16-36-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KAYBOB 16-36-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0489662
License Date: 2018-06-21
License Status: Issued
Spud Date: 2018-09-10
Final Drill Date: 2018-09-20
Well Total Depth: 4781.00 m
Surface Hole Latitude: 54.561981
Surface Hole Longitude: -116.731422

For data sources see[1][2]

Well History

Date Event
2018-06-21 Obtained License
2018-09-10 Surface Casing Operation Performed
2018-09-12 Direction Drilling Operation Performed - Deviate
2018-09-14 Well Log Performed
2018-09-15 Direction Drilling Operation Performed - Horizontal
2018-09-15 Intermediate Casing Operation Performed
2018-09-17 Lost Circulation Occurred
2018-09-20 Finished Drilling
2018-09-20 Well Log Performed
2018-09-20 Well Mode changed to Drilled and Cased
2018-09-23 Production Casing Operation Performed
2018-09-24 Rig Released
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Open-Hole Completion
2018-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-09 Well Began Production
2018-10-09 Well Fluid changed to Crude Oil
2018-10-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-09-10 Precision Drilling Corporation 391 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-09-12 707.90 Deviate (5 - 79 degrees)
2018-09-15 1928.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-03 Open Hole/Barefoot Completion 4279.40 4781.00 0
2018-10-03 Multi-Stage Fracture 3593.40 3593.50 0
2018-10-03 Multi-Stage Fracture 3511.60 3511.70 0
2018-10-03 Multi-Stage Fracture 3430.50 3430.60 0
2018-10-03 Multi-Stage Fracture 3361.70 3361.80 0
2018-10-03 Multi-Stage Fracture 3279.60 3279.70 0
2018-10-03 Multi-Stage Fracture 3211.50 3211.60 0
2018-10-03 Multi-Stage Fracture 3129.90 3130.00 0
2018-10-03 Multi-Stage Fracture 3061.80 3061.90 0
2018-10-03 Multi-Stage Fracture 2979.80 2979.90 0
2018-10-03 Multi-Stage Fracture 2897.90 2898.00 0
2018-10-03 Multi-Stage Fracture 4243.10 4243.20 0
2018-10-03 Multi-Stage Fracture 2829.60 2829.70 0
2018-10-03 Multi-Stage Fracture 2748.30 2748.40 0
2018-10-03 Multi-Stage Fracture 2680.20 2680.30 0
2018-10-04 Multi-Stage Fracture 2598.60 2598.70 0
2018-10-04 Multi-Stage Fracture 2515.70 2515.80 0
2018-10-04 Multi-Stage Fracture 2448.50 2448.60 0
2018-10-04 Multi-Stage Fracture 2365.20 2365.30 0
2018-10-04 Multi-Stage Fracture 2296.20 2296.30 0
2018-10-04 Multi-Stage Fracture 2212.90 2213.00 0
2018-10-04 Multi-Stage Fracture 2142.30 2142.40 0
2018-10-03 Multi-Stage Fracture 4181.70 4181.80 0
2018-10-04 Multi-Stage Fracture 2072.90 2073.00 0
2018-10-04 Multi-Stage Fracture 1989.40 1989.50 0
2018-10-04 Multi-Stage Fracture 1920.30 1920.40 0
2018-10-03 Multi-Stage Fracture 4113.10 4113.20 0
2018-10-03 Multi-Stage Fracture 4043.80 4043.90 0
2018-10-03 Multi-Stage Fracture 3974.60 3974.70 0
2018-10-03 Multi-Stage Fracture 3810.90 3811.00 0
2018-10-03 Multi-Stage Fracture 3742.10 3742.20 0
2018-10-03 Multi-Stage Fracture 3662.10 3662.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-03 2018-10-04 1,797 2,373 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 73.8995 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 19.7901 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.019 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.019 N/A
Non-Hazardous Ingredients Trade Secret 100 0.019 N/A
Polyethylene glycol 25322-68-3 100 0.019 N/A
Sodium bromide 7647-15-6 100 0.019 N/A
DWP-901 Calfrac Breaker Ammonium Persulfate 7727-54-0 100 0.0229 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0229 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0638 N/A
BetaPro AC Calfrac Corrosion Inhibitor Amine Salt Trade Secret 100 0.0885 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0885 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0683 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0683 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 5.6759 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.3716 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-03 2018-10-04 Surface Water - Runoff 2408

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 716 0.0 0.0 0.0
2019 8385 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-17 Lost Circulation 3900.00 4781.00
2018-10-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References