If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645251009000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.544489,"lon":-117.71544,"icon":""}]} |
| Location: 00/09-10-064-25W5/0 | |
| Location Alias: 00/09-10-64-25 W5M | |
| Location Alias 2: 00/09-10-064-25 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 25 | |
| Section: 10 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ACL HZ SIMONN 9-10-64-25 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0436943 | |
| License Date: 2011-09-20 | |
| License Status: Issued | |
| Spud Date: 2011-10-02 | |
| Final Drill Date: 2011-10-29 | |
| Well Total Depth: 4905.00 m | |
| Surface Hole Latitude: 54.544489 | |
| Surface Hole Longitude: -117.715440 |
| Date | Event |
|---|---|
| 2011-09-20 | Obtained License |
| 2011-10-03 | Lost Circulation Occurred |
| 2011-10-06 | Surface Casing Operation Performed |
| 2011-10-13 | Direction Drilling Operation Performed - Deviate |
| 2011-10-15 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-15 | Well Log Performed |
| 2011-10-17 | Intermediate Casing Operation Performed |
| 2011-10-29 | Finished Drilling |
| 2011-10-29 | Well Mode changed to Drilled and Cased |
| 2011-10-30 | Well Log Performed |
| 2011-11-01 | Well Log Performed |
| 2011-11-03 | Liner Casing Operation Performed |
| 2011-11-03 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-11-05 | Rig Released |
| 2011-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-02 | Well Began Production |
| 2012-02-02 | Well Fluid changed to Crude Oil |
| 2012-02-02 | Well Mode changed to Flowing |
| 2012-03-09 | Well Fluid changed to Crude Oil |
| 2012-03-09 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-13 | 2010.00 | Deviate (5 - 79 degrees) |
| 2011-10-15 | 2403.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-03 | Open Hole/Barefoot Completion | 4900.00 | 4905.00 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 4034.20 | 4034.30 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 3929.50 | 3929.60 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 3822.70 | 3822.80 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 3729.50 | 3729.60 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 3624.00 | 3624.10 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 3518.00 | 3518.10 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 3425.40 | 3425.50 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 3318.50 | 3318.60 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 3212.40 | 3212.50 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 3105.80 | 3105.90 | 0 |
| 2011-11-22 | Multi-Stage Fracture | 4847.80 | 4847.90 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 3013.90 | 3014.00 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 2908.30 | 2908.40 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 2802.30 | 2802.40 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 2697.50 | 2697.60 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 2592.40 | 2592.50 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 2501.90 | 2502.00 | 0 |
| 2011-11-22 | Multi-Stage Fracture | 4751.50 | 4751.60 | 0 |
| 2011-11-22 | Multi-Stage Fracture | 4646.40 | 4646.50 | 0 |
| 2011-11-22 | Multi-Stage Fracture | 4541.20 | 4541.30 | 0 |
| 2011-11-22 | Multi-Stage Fracture | 4436.80 | 4436.90 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 4346.80 | 4346.90 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 4241.70 | 4241.80 | 0 |
| 2011-11-23 | Multi-Stage Fracture | 4138.60 | 4138.70 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3752 | 0.0 | 0.0 | 0.0 |
| 2013 | 1132 | 0.0 | 0.0 | 0.0 |
| 2014 | 2283 | 0.0 | 0.0 | 0.0 |
| 2015 | 6030 | 0.0 | 0.0 | 0.0 |
| 2016 | 6653 | 0.0 | 0.0 | 0.0 |
| 2017 | 5730 | 0.0 | 0.0 | 0.0 |
| 2018 | 4668 | 0.0 | 0.0 | 0.0 |
| 2019 | 3252 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2011-10-03 | Lost Circulation | 91.00 | 206.00 |
For data sources see[7]