If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645272307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.551138,"lon":-117.970633,"icon":""}]} |
| Location: 00/07-23-064-27W5/0 | |
| Location Alias: 00/07-23-64-27 W5M | |
| Location Alias 2: 00/07-23-064-27 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 27 | |
| Section: 23 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY ET AL SIMON 7-23-64-27 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0398309 | |
| License Date: 2008-07-08 | |
| License Status: Suspension | |
| Spud Date: 2008-09-25 | |
| Final Drill Date: 2009-01-13 | |
| Well Total Depth: 3960.00 m | |
| Surface Hole Latitude: 54.551138 | |
| Surface Hole Longitude: -117.970633 |
| Date | Event |
|---|---|
| 2008-07-08 | Obtained License |
| 2008-09-25 | Lost Circulation Occurred |
| 2008-10-01 | Surface Casing Operation Performed |
| 2008-10-23 | Lost Circulation Occurred |
| 2008-11-16 | Well Log Performed |
| 2008-12-05 | Lost Circulation Occurred |
| 2009-01-01 | Intermediate Casing Operation Performed |
| 2009-01-02 | Lost Circulation Occurred |
| 2009-01-02 | Water Flow Occurred |
| 2009-01-11 | Water Flow Occurred |
| 2009-01-13 | Finished Drilling |
| 2009-01-13 | Well Mode changed to Drilled and Cased |
| 2009-01-14 | Well Log Performed |
| 2009-01-16 | Liner Casing Operation Performed |
| 2009-01-19 | Rig Released |
| 2009-02-04 | Well Log Performed |
| 2009-02-05 | Perforation Treatment Performed - Jet Perforation |
| 2009-02-05 | Well Log Performed |
| 2009-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-02-23 | Perforation Treatment Performed - Fractured |
| 2009-02-25 | Well Began Production |
| 2009-02-25 | Well Fluid changed to Crude Oil |
| 2009-02-25 | Well Mode changed to Flowing |
| 2009-04-02 | Well Fluid changed to Crude Oil |
| 2009-04-02 | Well Mode changed to Pumping |
| 2013-10-29 | Well Fluid changed to Crude Oil |
| 2013-10-29 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-02-05 | Perforation | 3888.00 | 3894.00 | 17 |
| 2009-02-07 | Acid Treatment | 3871.50 | 3873.00 | 0 |
| 2009-02-07 | Acid Treatment | 3868.00 | 3870.00 | 0 |
| 2009-02-07 | Acid Treatment | 3863.50 | 3864.50 | 0 |
| 2009-02-07 | Acid Treatment | 3860.00 | 3862.00 | 0 |
| 2009-02-07 | Acid Treatment | 3855.00 | 3857.00 | 0 |
| 2009-02-23 | Fracture | 3888.00 | 3894.00 | 0 |
| 2009-02-23 | Fracture | 3878.00 | 3881.00 | 0 |
| 2009-02-23 | Fracture | 3871.50 | 3873.00 | 0 |
| 2009-02-23 | Fracture | 3868.00 | 3870.00 | 0 |
| 2009-02-23 | Fracture | 3863.50 | 3864.50 | 0 |
| 2009-02-05 | Perforation | 3878.00 | 3881.00 | 17 |
| 2009-02-23 | Fracture | 3860.00 | 3862.00 | 0 |
| 2009-02-23 | Fracture | 3855.00 | 3857.00 | 0 |
| 2009-02-05 | Perforation | 3871.50 | 3873.00 | 17 |
| 2009-02-05 | Perforation | 3868.00 | 3870.00 | 17 |
| 2009-02-05 | Perforation | 3863.50 | 3864.50 | 17 |
| 2009-02-05 | Perforation | 3860.00 | 3862.00 | 17 |
| 2009-02-05 | Perforation | 3855.00 | 3857.00 | 17 |
| 2009-02-07 | Acid Treatment | 3888.00 | 3894.00 | 0 |
| 2009-02-07 | Acid Treatment | 3878.00 | 3881.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 4249 | 0.0 | 0.0 | 0.0 |
| 2010 | 5853 | 0.0 | 0.0 | 0.0 |
| 2011 | 2318 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2008-09-25 | Lost Circulation | 43.00 | 250.00 |
| 2008-10-23 | Lost Circulation | 3772.00 | 3772.00 |
| 2008-12-05 | Lost Circulation | 2200.00 | 3772.00 |
| 2009-01-02 | Lost Circulation | 3772.00 | 3772.00 |
| 2009-01-02 | Water Flow | 3772.00 | 3772.00 |
| 2009-01-11 | Water Flow | 1130.00 | 3934.00 |
For data sources see[6]