If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0646040104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.505112,"lon":-118.475847,"icon":""}]} |
| Location: 00/04-01-064-04W6/0 | |
| Location Alias: 00/04-01-64-04 W6M | |
| Location Alias 2: 00/04-01-064-04 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 01 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: 7GEN KARR 4-1-64-4 | |
| Operator Name: Seven Generations Energy Ltd. | |
| License Number: 0405350 | |
| License Date: 2008-12-04 | |
| License Status: Suspension | |
| Spud Date: 2008-12-21 | |
| Final Drill Date: 2009-01-11 | |
| Well Total Depth: 2730.00 m | |
| Surface Hole Latitude: 54.505112 | |
| Surface Hole Longitude: -118.475847 |
| Date | Event |
|---|---|
| 2008-12-04 | Obtained License |
| 2008-12-24 | Conductor Casing Operation Performed |
| 2009-01-04 | Direction Drilling Operation Performed - Deviate |
| 2009-01-11 | Finished Drilling |
| 2009-01-11 | Well Mode changed to Drilled and Cased |
| 2009-01-13 | Well Log Performed |
| 2009-01-14 | Production Casing Operation Performed |
| 2009-01-15 | Rig Released |
| 2009-02-12 | Well Log Performed |
| 2009-02-19 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2009-02-19 | Perforation Treatment Performed - Fractured |
| 2009-02-20 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2009-02-20 | Perforation Treatment Performed - Fractured |
| 2009-02-21 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2009-02-21 | Perforation Treatment Performed - Fractured |
| 2009-02-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2009-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-02-22 | Perforation Treatment Performed - Fractured |
| 2009-03-01 | Well Fluid changed to Gas |
| 2009-03-01 | Well Mode changed to Testing |
| 2009-03-31 | Well Fluid changed to Gas |
| 2009-03-31 | Well Mode changed to Test Completed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-01-04 | 2200.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-02-19 | Hydra Jet Perforation | 2571.00 | 2572.00 | 4 |
| 2009-02-21 | Fracture | 2322.00 | 2323.00 | 0 |
| 2009-02-21 | Hydra Jet Perforation | 2250.00 | 2251.00 | 4 |
| 2009-02-21 | Fracture | 2250.00 | 2251.00 | 0 |
| 2009-02-21 | Hydra Jet Perforation | 2037.00 | 2038.00 | 4 |
| 2009-02-21 | Fracture | 2037.00 | 2038.00 | 0 |
| 2009-02-21 | Hydra Jet Perforation | 1996.00 | 1997.00 | 4 |
| 2009-02-21 | Fracture | 1996.00 | 1997.00 | 0 |
| 2009-02-22 | Hydra Jet Perforation | 1806.00 | 1807.00 | 4 |
| 2009-02-22 | Acid Treatment | 1806.00 | 1807.00 | 0 |
| 2009-02-22 | Fracture | 1806.00 | 1807.00 | 0 |
| 2009-02-19 | Fracture | 2571.00 | 2572.00 | 0 |
| 2009-02-22 | Hydra Jet Perforation | 1765.00 | 1766.00 | 4 |
| 2009-02-22 | Fracture | 1765.00 | 1766.00 | 0 |
| 2009-02-19 | Hydra Jet Perforation | 2489.00 | 2490.00 | 4 |
| 2009-02-19 | Fracture | 2489.00 | 2490.00 | 0 |
| 2009-02-19 | Hydra Jet Perforation | 2471.00 | 2472.00 | 4 |
| 2009-02-20 | Fracture | 2471.00 | 2472.00 | 0 |
| 2009-02-20 | Hydra Jet Perforation | 2370.00 | 2371.00 | 4 |
| 2009-02-20 | Fracture | 2370.00 | 2371.00 | 0 |
| 2009-02-20 | Hydra Jet Perforation | 2322.00 | 2323.00 | 4 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]