X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646040501020

Well Details

Well ID: 0646040501020
Loading map...
Location: 02/01-05-064-04W6/0
Location Alias: 02/01-05-64-04 W6M
Location Alias 2: 02/01-05-064-04 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 04
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: 7GEN HZ 102 KAKWA 1-5-64-4
Operator Name: Seven Generations Energy Ltd.
License Number: 0474740
License Date: 2015-02-26
License Status: Amended
Spud Date: 2016-06-18
Final Drill Date: 2016-07-05
Well Total Depth: 4760.00 m
Surface Hole Latitude: 54.507130
Surface Hole Longitude: -118.581864

For data sources see[1][2]

Well History

Date Event
2015-02-26 Obtained License
2016-06-18 Direction Drilling Operation Performed - Deviate
2016-06-19 Surface Casing Operation Performed
2016-06-28 Well Log Performed
2016-06-29 Intermediate Casing Operation Performed
2016-07-01 Direction Drilling Operation Performed - Horizontal
2016-07-05 Finished Drilling
2016-07-05 Well Log Performed
2016-07-05 Well Mode changed to Drilled and Cased
2016-07-07 Production Casing Operation Performed
2016-07-08 Rig Released
2016-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-01 Well Fluid changed to Gas
2016-11-01 Well Mode changed to Testing
2016-12-01 Well Began Production
2016-12-01 Well Fluid changed to Gas
2016-12-01 Well Mode changed to Flowing
2017-05-31 Well Fluid changed to Gas
2017-05-31 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-06-18 326.90 Deviate (5 - 79 degrees)
2016-07-01 3251.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-17 Multi-Stage Fracture 4712.50 4713.00 0
2016-09-23 Multi-Stage Fracture 4273.00 4277.00 0
2016-09-24 Multi-Stage Fracture 4225.70 4229.70 0
2016-09-24 Multi-Stage Fracture 4178.60 4182.60 0
2016-09-25 Multi-Stage Fracture 4131.40 4135.40 0
2016-09-25 Multi-Stage Fracture 4084.30 4088.30 0
2016-09-28 Multi-Stage Fracture 4037.00 4041.00 0
2016-09-29 Multi-Stage Fracture 3990.30 3994.30 0
2016-10-01 Multi-Stage Fracture 3941.40 3947.40 0
2016-10-01 Multi-Stage Fracture 3895.00 3901.00 0
2016-10-02 Multi-Stage Fracture 3848.30 3854.30 0
2016-09-17 Multi-Stage Fracture 4663.00 4663.50 0
2016-10-02 Multi-Stage Fracture 3801.80 3807.80 0
2016-10-02 Multi-Stage Fracture 3755.60 3761.60 0
2016-10-03 Multi-Stage Fracture 3708.60 3714.60 0
2016-10-03 Multi-Stage Fracture 3663.50 3667.50 0
2016-10-04 Multi-Stage Fracture 3602.50 3606.50 0
2016-10-04 Multi-Stage Fracture 3544.00 3545.00 0
2016-10-04 Multi-Stage Fracture 3480.30 3484.30 0
2016-10-04 Multi-Stage Fracture 3418.80 3422.80 0
2016-10-04 Multi-Stage Fracture 3357.00 3361.00 0
2016-10-05 Multi-Stage Fracture 3296.10 3300.10 0
2016-09-17 Multi-Stage Fracture 4613.80 4614.30 0
2016-10-05 Multi-Stage Fracture 3235.20 3239.20 0
2016-09-17 Multi-Stage Fracture 4564.60 4565.10 0
2016-09-17 Multi-Stage Fracture 4514.40 4514.90 0
2016-09-17 Multi-Stage Fracture 4464.10 4464.60 0
2016-09-17 Multi-Stage Fracture 4413.90 4414.40 0
2016-09-17 Multi-Stage Fracture 4363.90 4364.40 0
2016-09-23 Multi-Stage Fracture 4319.80 4323.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-17 2016-10-05 3,096 33,476 N/A
2 2016-09-17 2016-09-24 3,096 0 N/A
3 2016-09-24 2016-09-24 3,096 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.8326 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 13.0603 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0107 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0107 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0956 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0006 N/A
Water 7732-18-5 100 0.0006 N/A
3 DWP-975 Calfrac Breaker Ammonium Persulfate 7727-54-0 100 0.0006 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0006 N/A
DWP-101 Calfrac Gelling Agent Guar gum 9000-30-0 100 0.0124 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0124 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-06-23 2016-10-28 Surface Water - River 3322
2016-10-27 2016-11-02 Surface Water - River 12963
2016-10-23 2016-11-30 Surface Water - River 6263
2017-02-20 2017-02-22 Surface Water - River 624
2016-09-15 2016-10-05 Recycled Fracturing Water (treated at well site) 1660
2016-09-15 2016-10-05 Recycled Fracturing Water (treated at well site) 1848
2016-09-15 2016-10-05 Recycled Fracturing Water (treated at well site) 1419
2016-09-15 2016-10-05 Recycled Fracturing Water (treated at well site) 1766
2016-09-15 2016-10-05 Recycled Fracturing Water (treated at well site) 1678
2016-09-15 2016-10-05 Recycled Fracturing Water (treated at well site) 1932

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 926 0.0 0.0 0.0
2017 8535 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8463 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-08 No Incident Encountered 0.00 0.00
2016-10-05 No Incident Encountered 0.00 0.00

For data sources see[9]

References