If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0646040902020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.508813,"lon":-118.504975,"icon":""}]} |
| Location: 02/02-09-064-04W6/0 | |
| Location Alias: 02/02-09-64-04 W6M | |
| Location Alias 2: 02/02-09-064-04 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 09 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: 7GEN HZ 102 KAKWA 2-9-64-4 | |
| Operator Name: Seven Generations Energy Ltd. | |
| License Number: 0494526 | |
| License Date: 2019-05-17 | |
| License Status: Amended | |
| Spud Date: 2019-06-06 | |
| Final Drill Date: 2019-08-10 | |
| Well Total Depth: 5467.00 m | |
| Surface Hole Latitude: 54.508813 | |
| Surface Hole Longitude: -118.504975 |
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-06-06 | 523.40 | Deviate (5 - 79 degrees) |
| 2019-08-06 | 3271.70 | Horizontal |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2020-01-03 | Multi-Stage Fracture | 5426.40 | 5427.30 | 0 |
| 2020-01-05 | Perforation | 5293.00 | 5293.50 | 5 |
| 2020-01-11 | Perforation | 4269.00 | 4269.50 | 5 |
| 2020-01-11 | Multi-Stage Fracture | 4269.00 | 4312.50 | 0 |
| 2020-01-12 | Perforation | 4242.00 | 4242.50 | 7 |
| 2020-01-12 | Perforation | 4255.00 | 4255.50 | 8 |
| 2020-01-12 | Perforation | 4227.00 | 4227.50 | 6 |
| 2020-01-12 | Perforation | 4213.00 | 4213.50 | 5 |
| 2020-01-12 | Multi-Stage Fracture | 4213.00 | 4255.50 | 0 |
| 2020-01-13 | Perforation | 4199.00 | 4199.50 | 8 |
| 2020-01-13 | Perforation | 4184.00 | 4184.50 | 7 |
| 2020-01-13 | Perforation | 4170.00 | 4170.50 | 6 |
| 2020-01-05 | Multi-Stage Fracture | 5293.00 | 5336.50 | 0 |
| 2020-01-13 | Perforation | 4156.00 | 4156.50 | 5 |
| 2020-01-13 | Multi-Stage Fracture | 4156.00 | 4199.50 | 0 |
| 2020-01-14 | Perforation | 4098.00 | 4098.50 | 5 |
| 2020-01-14 | Perforation | 4113.00 | 4113.50 | 6 |
| 2020-01-14 | Perforation | 4127.00 | 4127.50 | 7 |
| 2020-01-14 | Perforation | 4141.00 | 4141.50 | 8 |
| 2020-01-14 | Multi-Stage Fracture | 4098.00 | 4141.50 | 0 |
| 2020-01-15 | Perforation | 4084.00 | 4084.50 | 8 |
| 2020-01-15 | Perforation | 4070.00 | 4070.50 | 7 |
| 2020-01-15 | Perforation | 4056.00 | 4056.50 | 6 |
| 2020-01-05 | Perforation | 5279.00 | 5279.50 | 8 |
| 2020-01-15 | Perforation | 4042.00 | 4042.50 | 5 |
| 2020-01-15 | Multi-Stage Fracture | 4042.00 | 4084.50 | 0 |
| 2020-01-16 | Perforation | 4027.00 | 4027.50 | 8 |
| 2020-01-16 | Perforation | 4013.00 | 4013.50 | 7 |
| 2020-01-16 | Perforation | 3999.00 | 3999.50 | 6 |
| 2020-01-16 | Perforation | 3985.00 | 3985.50 | 5 |
| 2020-01-16 | Multi-Stage Fracture | 3985.00 | 4027.50 | 0 |
| 2020-01-17 | Perforation | 3971.00 | 3971.50 | 8 |
| 2020-01-17 | Perforation | 3956.00 | 3956.50 | 7 |
| 2020-01-17 | Perforation | 3942.00 | 3942.50 | 6 |
| 2020-01-05 | Perforation | 5265.00 | 5265.50 | 7 |
| 2020-01-17 | Perforation | 3928.00 | 3928.50 | 5 |
| 2020-01-17 | Multi-Stage Fracture | 3928.00 | 3971.50 | 0 |
| 2020-01-18 | Perforation | 3914.00 | 3914.50 | 8 |
| 2020-01-18 | Perforation | 3900.00 | 3900.50 | 7 |
| 2020-01-18 | Perforation | 3886.00 | 3886.50 | 6 |
| 2020-01-18 | Perforation | 3872.00 | 3872.50 | 5 |
| 2020-01-18 | Multi-Stage Fracture | 3872.00 | 3914.50 | 0 |
| 2020-01-19 | Perforation | 3857.00 | 3857.50 | 8 |
| 2020-01-19 | Perforation | 3843.00 | 3843.50 | 7 |
| 2020-01-19 | Perforation | 3828.00 | 3828.50 | 6 |
| 2020-01-05 | Perforation | 5251.00 | 5251.50 | 6 |
| 2020-01-19 | Perforation | 3813.00 | 3813.50 | 5 |
| 2020-01-19 | Multi-Stage Fracture | 3813.00 | 3857.50 | 0 |
| 2020-01-19 | Perforation | 3799.00 | 3799.50 | 8 |
| 2020-01-19 | Perforation | 3785.00 | 3785.50 | 7 |
| 2020-01-19 | Perforation | 3770.00 | 3770.50 | 6 |
| 2020-01-19 | Perforation | 3756.00 | 3756.50 | 5 |
| 2020-01-19 | Multi-Stage Fracture | 3756.00 | 3799.50 | 0 |
| 2020-01-20 | Perforation | 3742.00 | 3742.50 | 8 |
| 2020-01-20 | Perforation | 3728.00 | 3728.50 | 7 |
| 2020-01-20 | Perforation | 3714.00 | 3714.50 | 6 |
| 2020-01-05 | Perforation | 5237.00 | 5237.50 | 5 |
| 2020-01-20 | Perforation | 3700.00 | 3700.50 | 5 |
| 2020-01-20 | Multi-Stage Fracture | 3700.00 | 3742.50 | 0 |
| 2020-01-20 | Perforation | 3685.00 | 3685.50 | 8 |
| 2020-01-20 | Perforation | 3671.00 | 3671.50 | 7 |
| 2020-01-20 | Perforation | 3658.00 | 3658.50 | 6 |
| 2020-01-20 | Perforation | 3644.00 | 3644.50 | 5 |
| 2020-01-20 | Multi-Stage Fracture | 3644.00 | 3685.50 | 0 |
| 2020-01-21 | Perforation | 3630.00 | 3630.50 | 8 |
| 2020-01-21 | Perforation | 3616.00 | 3616.50 | 7 |
| 2020-01-21 | Perforation | 3602.00 | 3602.50 | 6 |
| 2020-01-05 | Multi-Stage Fracture | 5237.00 | 5279.50 | 0 |
| 2020-01-21 | Perforation | 3588.00 | 3588.50 | 5 |
| 2020-01-21 | Multi-Stage Fracture | 3588.00 | 3630.50 | 0 |
| 2020-01-21 | Perforation | 3574.00 | 3574.50 | 8 |
| 2020-01-21 | Perforation | 3559.00 | 3559.50 | 7 |
| 2020-01-21 | Perforation | 3545.00 | 3545.50 | 6 |
| 2020-01-21 | Perforation | 3531.00 | 3531.50 | 5 |
| 2020-01-21 | Multi-Stage Fracture | 3531.00 | 3574.50 | 0 |
| 2020-01-21 | Perforation | 3517.00 | 3517.50 | 8 |
| 2020-01-21 | Perforation | 3503.00 | 3503.50 | 7 |
| 2020-01-21 | Perforation | 3489.00 | 3489.50 | 6 |
| 2020-01-06 | Perforation | 5222.00 | 5222.50 | 8 |
| 2020-01-21 | Perforation | 3475.00 | 3475.50 | 5 |
| 2020-01-21 | Multi-Stage Fracture | 3475.00 | 3517.50 | 0 |
| 2020-01-22 | Perforation | 3461.00 | 3461.50 | 8 |
| 2020-01-22 | Perforation | 3447.00 | 3447.50 | 7 |
| 2020-01-22 | Perforation | 3432.00 | 3432.50 | 6 |
| 2020-01-22 | Perforation | 3419.00 | 3419.50 | 5 |
| 2020-01-22 | Multi-Stage Fracture | 3419.00 | 3461.50 | 0 |
| 2020-01-23 | Perforation | 3404.00 | 3404.50 | 8 |
| 2020-01-23 | Perforation | 3390.00 | 3390.50 | 7 |
| 2020-01-23 | Perforation | 3376.00 | 3376.50 | 6 |
| 2020-01-06 | Perforation | 5208.00 | 5208.50 | 7 |
| 2020-01-23 | Perforation | 3361.00 | 3361.50 | 5 |
| 2020-01-23 | Multi-Stage Fracture | 3361.00 | 3404.50 | 0 |
| 2020-01-23 | Perforation | 3347.00 | 3356.50 | 8 |
| 2020-01-23 | Perforation | 3333.00 | 3333.50 | 7 |
| 2020-01-23 | Perforation | 3319.00 | 3319.50 | 6 |
| 2020-01-23 | Perforation | 3305.00 | 3305.50 | 5 |
| 2020-01-23 | Multi-Stage Fracture | 3305.00 | 3356.50 | 0 |
| 2020-01-24 | Perforation | 3291.00 | 3291.50 | 8 |
| 2020-01-24 | Perforation | 3277.00 | 3277.50 | 7 |
| 2020-01-24 | Perforation | 3263.00 | 3263.50 | 6 |
| 2020-01-06 | Perforation | 5194.00 | 5194.50 | 6 |
| 2020-01-24 | Perforation | 3249.00 | 3249.50 | 5 |
| 2020-01-24 | Multi-Stage Fracture | 3249.00 | 3291.50 | 0 |
| 2020-01-24 | Perforation | 3235.00 | 3235.50 | 8 |
| 2020-01-24 | Perforation | 3220.00 | 3220.50 | 7 |
| 2020-01-24 | Perforation | 3207.00 | 3207.50 | 6 |
| 2020-01-24 | Perforation | 3192.00 | 3192.50 | 5 |
| 2020-01-24 | Multi-Stage Fracture | 3192.00 | 3235.50 | 0 |
| 2020-01-04 | Perforation | 5392.00 | 5392.50 | 8 |
| 2020-01-06 | Perforation | 5180.00 | 5180.50 | 5 |
| 2020-01-06 | Multi-Stage Fracture | 5180.00 | 5222.50 | 0 |
| 2020-01-06 | Perforation | 5165.00 | 5165.50 | 8 |
| 2020-01-06 | Perforation | 5151.00 | 5151.50 | 7 |
| 2020-01-06 | Perforation | 5137.00 | 5137.50 | 6 |
| 2020-01-06 | Perforation | 5123.00 | 5123.50 | 5 |
| 2020-01-06 | Multi-Stage Fracture | 5123.00 | 5165.50 | 0 |
| 2020-01-06 | Perforation | 5108.00 | 5108.50 | 8 |
| 2020-01-06 | Perforation | 5094.00 | 5094.50 | 7 |
| 2020-01-06 | Perforation | 5080.00 | 5080.50 | 6 |
| 2020-01-04 | Perforation | 5378.00 | 5378.50 | 7 |
| 2020-01-06 | Perforation | 5065.00 | 5065.50 | 5 |
| 2020-01-06 | Multi-Stage Fracture | 5065.00 | 5108.50 | 0 |
| 2020-01-06 | Perforation | 5051.00 | 5051.50 | 8 |
| 2020-01-06 | Perforation | 5037.00 | 5037.50 | 7 |
| 2020-01-06 | Perforation | 5021.00 | 5021.50 | 6 |
| 2020-01-06 | Perforation | 5007.00 | 5007.50 | 5 |
| 2020-01-06 | Multi-Stage Fracture | 5007.00 | 5051.50 | 0 |
| 2020-01-07 | Perforation | 4993.00 | 4993.50 | 8 |
| 2020-01-07 | Perforation | 4978.00 | 4978.50 | 7 |
| 2020-01-07 | Perforation | 4964.00 | 4964.50 | 6 |
| 2020-01-04 | Perforation | 5364.00 | 5364.50 | 6 |
| 2020-01-07 | Perforation | 4950.00 | 4950.50 | 5 |
| 2020-01-07 | Multi-Stage Fracture | 4950.00 | 4993.50 | 0 |
| 2020-01-07 | Perforation | 4935.00 | 4935.50 | 8 |
| 2020-01-07 | Perforation | 4921.00 | 4921.50 | 7 |
| 2020-01-07 | Perforation | 4907.00 | 4907.50 | 6 |
| 2020-01-07 | Perforation | 4893.00 | 4893.50 | 5 |
| 2020-01-07 | Multi-Stage Fracture | 4893.00 | 4935.50 | 0 |
| 2020-01-07 | Perforation | 4880.00 | 4880.50 | 8 |
| 2020-01-07 | Perforation | 4865.00 | 4865.50 | 7 |
| 2020-01-07 | Perforation | 4851.00 | 4851.50 | 6 |
| 2020-01-04 | Perforation | 5350.00 | 5350.50 | 5 |
| 2020-01-07 | Perforation | 4837.00 | 4837.50 | 5 |
| 2020-01-07 | Multi-Stage Fracture | 4837.00 | 4880.50 | 0 |
| 2020-01-07 | Perforation | 4823.00 | 4823.50 | 8 |
| 2020-01-07 | Perforation | 4809.00 | 4809.50 | 7 |
| 2020-01-07 | Perforation | 4795.00 | 4795.50 | 6 |
| 2020-01-07 | Perforation | 4781.00 | 4781.50 | 5 |
| 2020-01-07 | Multi-Stage Fracture | 4781.00 | 4823.50 | 0 |
| 2020-01-08 | Perforation | 4766.00 | 4766.50 | 8 |
| 2020-01-08 | Perforation | 4752.00 | 4752.50 | 7 |
| 2020-01-08 | Perforation | 4738.00 | 4738.50 | 6 |
| 2020-01-04 | Multi-Stage Fracture | 5350.00 | 5392.50 | 0 |
| 2020-01-08 | Perforation | 4725.00 | 4725.50 | 5 |
| 2020-01-08 | Multi-Stage Fracture | 4725.00 | 4766.50 | 0 |
| 2020-01-08 | Perforation | 4710.00 | 4710.50 | 8 |
| 2020-01-08 | Perforation | 4697.00 | 4697.50 | 7 |
| 2020-01-08 | Perforation | 4683.00 | 4683.50 | 6 |
| 2020-01-08 | Perforation | 4668.00 | 4668.50 | 5 |
| 2020-01-08 | Multi-Stage Fracture | 4668.00 | 4710.50 | 0 |
| 2020-01-08 | Perforation | 4654.00 | 4654.50 | 8 |
| 2020-01-08 | Perforation | 4641.00 | 4641.50 | 7 |
| 2020-01-08 | Perforation | 4626.00 | 4626.50 | 6 |
| 2020-01-05 | Perforation | 5336.00 | 5336.50 | 8 |
| 2020-01-08 | Perforation | 4611.00 | 4611.50 | 5 |
| 2020-01-08 | Multi-Stage Fracture | 4611.00 | 4654.50 | 0 |
| 2020-01-08 | Perforation | 4568.00 | 4568.50 | 6 |
| 2020-01-09 | Perforation | 4597.00 | 4597.50 | 8 |
| 2020-01-09 | Perforation | 4583.00 | 4583.50 | 7 |
| 2020-01-09 | Perforation | 4554.00 | 4554.50 | 5 |
| 2020-01-09 | Multi-Stage Fracture | 4554.00 | 4597.50 | 0 |
| 2020-01-09 | Perforation | 4540.00 | 4540.50 | 8 |
| 2020-01-09 | Perforation | 4525.00 | 4525.50 | 7 |
| 2020-01-09 | Perforation | 4511.00 | 4511.50 | 6 |
| 2020-01-05 | Perforation | 5322.00 | 5322.50 | 7 |
| 2020-01-09 | Perforation | 4498.00 | 4498.50 | 5 |
| 2020-01-09 | Multi-Stage Fracture | 4498.00 | 4540.50 | 0 |
| 2020-01-10 | Perforation | 4484.00 | 4484.50 | 8 |
| 2020-01-10 | Perforation | 4469.00 | 4469.50 | 7 |
| 2020-01-10 | Perforation | 4455.00 | 4455.50 | 6 |
| 2020-01-10 | Perforation | 4441.00 | 4441.50 | 5 |
| 2020-01-10 | Multi-Stage Fracture | 4441.00 | 4484.50 | 0 |
| 2020-01-11 | Perforation | 4426.00 | 4426.50 | 8 |
| 2020-01-11 | Perforation | 4412.00 | 4412.50 | 7 |
| 2020-01-11 | Perforation | 4398.00 | 4398.50 | 6 |
| 2020-01-05 | Perforation | 5307.00 | 5307.50 | 6 |
| 2020-01-11 | Perforation | 4383.00 | 4383.50 | 5 |
| 2020-01-11 | Multi-Stage Fracture | 4383.00 | 4426.50 | 0 |
| 2020-01-11 | Perforation | 4369.00 | 4369.50 | 8 |
| 2020-01-11 | Perforation | 4355.00 | 4355.50 | 7 |
| 2020-01-11 | Perforation | 4340.00 | 4340.50 | 6 |
| 2020-01-11 | Perforation | 4326.00 | 4326.50 | 5 |
| 2020-01-11 | Multi-Stage Fracture | 4326.00 | 4369.50 | 0 |
| 2020-01-11 | Perforation | 4312.00 | 4312.50 | 8 |
| 2020-01-11 | Perforation | 4298.00 | 4298.50 | 7 |
| 2020-01-11 | Perforation | 4284.00 | 4284.50 | 6 |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2020-01-03 | 2020-01-24 | 3,060 | 28,038 | N/A |
| 2 | 2020-01-04 | 2020-01-21 | 3,060 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 86.4168 | N/A | |||
| 40/70 Premium | AG Sand | Crystalline silica. quartz | 14808-60-7 | 100 | 13.5051 | N/A | ||
| MC B-8510 | Mutli-Chem | Bactericide/Biocide | 2.2 Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0098 | N/A | |
| 2.2-Dibromomalonamide | 73003-80-2 | 100 | 0.0098 | N/A | ||||
| 2-Monobromo-3-nitrilopropionamide | 1113-55-9 | 100 | 0.0098 | N/A | ||||
| Dibromoacetonitrile | 3252-43-5 | 100 | 0.0098 | N/A | ||||
| Inert Ingredient(s) | Not Available | 100 | 0.0098 | N/A | ||||
| Excelerate LX-1 | Halliburton | Friction Reducer | Complex Amine Compound | Trade Secret | 100 | 0.0866 | N/A | |
| Hydrotreated light petroleum distillate | 64742-47-8 | 100 | 0.0866 | N/A | ||||
| Inert Ingredient(s) | Not Available | 100 | 0.0866 | N/A | ||||
| 2 | FightR EC-1 | Halliburton | Friction Reducer | Inert Ingredients(s) | Not Available | 100 | 0.0024 | N/A |
| FightR-LXD | Halliburton | Friction Reducer | Inert Ingredient(s) | Not Available | 100 | 0.029 | N/A |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2020 | 893 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-08-13 | No Incident Encountered | 0.00 | 0.00 |
| 2020-01-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]