If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0646041009020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.542971,"lon":-118.530957,"icon":""}]} |
| Location: 02/09-10-064-04W6/0 | |
| Location Alias: 02/09-10-64-04 W6M | |
| Location Alias 2: 02/09-10-064-04 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 10 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: 7GEN HZ 102 KARR 9-10-64-4 | |
| Operator Name: Seven Generations Energy Ltd. | |
| License Number: 0489639 | |
| License Date: 2018-06-21 | |
| License Status: Amended | |
| Spud Date: 2018-07-07 | |
| Final Drill Date: 2018-09-06 | |
| Well Total Depth: 5457.00 m | |
| Surface Hole Latitude: 54.542971 | |
| Surface Hole Longitude: -118.530957 |
| Date | Event |
|---|---|
| 2018-06-21 | Obtained License |
| 2018-07-07 | Lost Circulation Occurred |
| 2018-07-10 | Surface Casing Operation Performed |
| 2018-08-23 | Direction Drilling Operation Performed - Deviate |
| 2018-08-27 | Well Log Performed |
| 2018-08-28 | Direction Drilling Operation Performed - Horizontal |
| 2018-08-28 | Intermediate Casing Operation Performed |
| 2018-08-28 | Well Log Performed |
| 2018-09-06 | Finished Drilling |
| 2018-09-06 | Well Log Performed |
| 2018-09-06 | Well Mode changed to Drilled and Cased |
| 2018-09-07 | Production Casing Operation Performed |
| 2018-09-07 | Well Log Performed |
| 2018-09-09 | Rig Released |
| 2018-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-10 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-11 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-12 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-13 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-14 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-15 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-16 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-17 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-18 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-20 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-21 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-22 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-23 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-24 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-25 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-26 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-27 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-28 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-29 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-30 | Perforation Treatment Performed - Jet Perforation |
| 2018-11-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-01 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-02 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-03 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-04 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-05 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-07 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-08 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-09 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-12-10 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-11 | Well Fluid changed to Gas |
| 2019-01-11 | Well Mode changed to Testing |
| 2019-01-21 | Well Began Production |
| 2019-01-21 | Well Fluid changed to Gas |
| 2019-01-21 | Well Mode changed to Flowing |
| 2019-03-13 | Well Fluid changed to Gas |
| 2019-03-13 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-08-23 | 1141.40 | Deviate (5 - 79 degrees) |
| 2018-08-28 | 2936.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-11-09 | Multi-Stage Fracture | 5411.30 | 5412.20 | 0 |
| 2018-11-11 | Multi-Stage Fracture | 5275.00 | 5279.00 | 0 |
| 2018-11-28 | Multi-Stage Fracture | 4015.00 | 4020.00 | 0 |
| 2018-11-28 | Perforation | 3977.00 | 3978.00 | 20 |
| 2018-11-28 | Perforation | 3973.00 | 3974.00 | 20 |
| 2018-11-28 | Multi-Stage Fracture | 3973.00 | 3978.00 | 0 |
| 2018-11-29 | Perforation | 3935.00 | 3936.00 | 20 |
| 2018-11-29 | Perforation | 3931.00 | 3932.00 | 20 |
| 2018-11-29 | Multi-Stage Fracture | 3931.00 | 3936.00 | 0 |
| 2018-11-30 | Perforation | 3893.00 | 3894.00 | 20 |
| 2018-11-30 | Perforation | 3889.00 | 3890.00 | 20 |
| 2018-11-30 | Multi-Stage Fracture | 3889.00 | 3894.00 | 0 |
| 2018-11-11 | Perforation | 5236.00 | 5237.00 | 20 |
| 2018-11-30 | Perforation | 3814.00 | 3815.00 | 20 |
| 2018-11-30 | Perforation | 3810.00 | 3811.00 | 20 |
| 2018-11-30 | Multi-Stage Fracture | 3810.00 | 3815.00 | 0 |
| 2018-12-01 | Perforation | 3772.00 | 3773.00 | 20 |
| 2018-12-01 | Perforation | 3768.00 | 3769.00 | 20 |
| 2018-12-01 | Multi-Stage Fracture | 3768.00 | 3773.00 | 0 |
| 2018-12-01 | Perforation | 3729.00 | 3730.00 | 20 |
| 2018-12-01 | Perforation | 3725.00 | 3726.00 | 20 |
| 2018-12-01 | Multi-Stage Fracture | 3725.00 | 3730.00 | 0 |
| 2018-12-01 | Perforation | 3687.00 | 3688.00 | 20 |
| 2018-11-11 | Perforation | 5233.00 | 5234.00 | 20 |
| 2018-12-01 | Perforation | 3683.00 | 3684.00 | 20 |
| 2018-12-01 | Multi-Stage Fracture | 3683.00 | 3688.00 | 0 |
| 2018-12-02 | Perforation | 3645.00 | 3646.00 | 20 |
| 2018-12-02 | Perforation | 3642.00 | 3643.00 | 20 |
| 2018-12-02 | Multi-Stage Fracture | 3642.00 | 3646.00 | 0 |
| 2018-12-03 | Perforation | 3604.00 | 3605.00 | 20 |
| 2018-12-03 | Perforation | 3600.00 | 3601.00 | 20 |
| 2018-12-03 | Multi-Stage Fracture | 3600.00 | 3605.00 | 0 |
| 2018-12-04 | Perforation | 3562.00 | 3563.00 | 20 |
| 2018-12-04 | Perforation | 3558.00 | 3559.00 | 20 |
| 2018-11-11 | Multi-Stage Fracture | 5233.00 | 5237.00 | 0 |
| 2018-12-04 | Multi-Stage Fracture | 3558.00 | 3563.00 | 0 |
| 2018-12-04 | Perforation | 3521.00 | 3522.00 | 20 |
| 2018-12-04 | Perforation | 3517.00 | 3518.00 | 20 |
| 2018-12-04 | Multi-Stage Fracture | 3517.00 | 3522.00 | 0 |
| 2018-12-05 | Perforation | 3479.00 | 3480.00 | 20 |
| 2018-12-05 | Perforation | 3475.00 | 3476.00 | 20 |
| 2018-12-05 | Multi-Stage Fracture | 3475.00 | 3480.00 | 0 |
| 2018-12-07 | Perforation | 3438.00 | 3439.00 | 20 |
| 2018-12-07 | Perforation | 3435.00 | 3436.00 | 20 |
| 2018-12-07 | Multi-Stage Fracture | 3435.00 | 3439.00 | 0 |
| 2018-11-12 | Perforation | 5195.00 | 5196.00 | 20 |
| 2018-12-07 | Perforation | 3397.00 | 3398.00 | 20 |
| 2018-12-07 | Perforation | 3393.00 | 3394.00 | 20 |
| 2018-12-07 | Multi-Stage Fracture | 3393.00 | 3398.00 | 0 |
| 2018-12-08 | Perforation | 3356.00 | 3357.00 | 20 |
| 2018-12-08 | Perforation | 3352.00 | 3353.00 | 20 |
| 2018-12-08 | Multi-Stage Fracture | 3352.00 | 3357.00 | 0 |
| 2018-12-09 | Perforation | 3313.00 | 3314.00 | 20 |
| 2018-12-09 | Perforation | 3309.00 | 3310.00 | 20 |
| 2018-12-09 | Multi-Stage Fracture | 3309.00 | 3314.00 | 0 |
| 2018-12-09 | Perforation | 3272.00 | 3273.00 | 20 |
| 2018-11-12 | Perforation | 5191.00 | 5192.00 | 20 |
| 2018-12-09 | Perforation | 3269.00 | 3270.00 | 20 |
| 2018-12-09 | Multi-Stage Fracture | 3269.00 | 3273.00 | 0 |
| 2018-12-10 | Perforation | 3230.00 | 3231.00 | 20 |
| 2018-12-10 | Perforation | 3227.00 | 3228.00 | 20 |
| 2018-12-10 | Multi-Stage Fracture | 3227.00 | 3231.00 | 0 |
| 2018-12-10 | Perforation | 3189.00 | 3190.00 | 20 |
| 2018-12-10 | Perforation | 3186.00 | 3187.00 | 20 |
| 2018-12-10 | Multi-Stage Fracture | 3186.00 | 3190.00 | 0 |
| 2018-12-10 | Perforation | 3148.00 | 3149.00 | 20 |
| 2018-12-10 | Perforation | 3145.00 | 3146.00 | 20 |
| 2018-11-12 | Multi-Stage Fracture | 5191.00 | 5196.00 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3145.00 | 3149.00 | 0 |
| 2018-11-13 | Perforation | 5154.00 | 5155.00 | 20 |
| 2018-11-13 | Perforation | 5150.00 | 5151.00 | 20 |
| 2018-11-13 | Multi-Stage Fracture | 5150.00 | 5155.00 | 0 |
| 2018-11-10 | Perforation | 5362.00 | 5363.00 | 20 |
| 2018-11-13 | Perforation | 5112.00 | 5113.00 | 20 |
| 2018-11-13 | Perforation | 5109.00 | 5110.00 | 20 |
| 2018-11-13 | Multi-Stage Fracture | 5109.00 | 5113.00 | 0 |
| 2018-11-14 | Perforation | 5071.00 | 5072.00 | 20 |
| 2018-11-14 | Perforation | 5067.00 | 5068.00 | 20 |
| 2018-11-14 | Multi-Stage Fracture | 5067.00 | 5072.00 | 0 |
| 2018-11-14 | Perforation | 5029.00 | 5030.00 | 20 |
| 2018-11-14 | Perforation | 5025.00 | 5026.00 | 20 |
| 2018-11-14 | Multi-Stage Fracture | 5025.00 | 5030.00 | 0 |
| 2018-11-14 | Perforation | 4985.00 | 4986.00 | 20 |
| 2018-11-10 | Perforation | 5358.00 | 5359.00 | 20 |
| 2018-11-14 | Perforation | 4981.00 | 4982.00 | 20 |
| 2018-11-14 | Multi-Stage Fracture | 4981.00 | 4986.00 | 0 |
| 2018-11-15 | Perforation | 4943.00 | 4944.00 | 20 |
| 2018-11-15 | Perforation | 4939.00 | 4940.00 | 20 |
| 2018-11-15 | Multi-Stage Fracture | 4939.00 | 4944.00 | 0 |
| 2018-11-16 | Perforation | 4902.00 | 4903.00 | 20 |
| 2018-11-16 | Perforation | 4898.00 | 4899.00 | 20 |
| 2018-11-16 | Multi-Stage Fracture | 4898.00 | 4903.00 | 0 |
| 2018-11-17 | Perforation | 4860.00 | 4861.00 | 20 |
| 2018-11-17 | Perforation | 4856.00 | 4857.00 | 20 |
| 2018-11-10 | Multi-Stage Fracture | 5358.00 | 5363.00 | 0 |
| 2018-11-17 | Multi-Stage Fracture | 4856.00 | 4861.00 | 0 |
| 2018-11-17 | Perforation | 4818.00 | 4819.00 | 20 |
| 2018-11-17 | Perforation | 4814.00 | 4815.00 | 20 |
| 2018-11-17 | Multi-Stage Fracture | 4814.00 | 4819.00 | 0 |
| 2018-11-18 | Perforation | 4776.00 | 4777.00 | 20 |
| 2018-11-18 | Perforation | 4772.00 | 4773.00 | 20 |
| 2018-11-18 | Multi-Stage Fracture | 4772.00 | 4777.00 | 0 |
| 2018-11-20 | Perforation | 4735.00 | 4736.00 | 20 |
| 2018-11-20 | Perforation | 4731.00 | 4732.00 | 20 |
| 2018-11-20 | Multi-Stage Fracture | 4731.00 | 4736.00 | 0 |
| 2018-11-10 | Perforation | 5320.00 | 5321.00 | 20 |
| 2018-11-20 | Perforation | 4693.00 | 4694.00 | 20 |
| 2018-11-20 | Perforation | 4689.00 | 4690.00 | 20 |
| 2018-11-20 | Multi-Stage Fracture | 4689.00 | 4694.00 | 0 |
| 2018-11-21 | Perforation | 4651.00 | 4652.00 | 20 |
| 2018-11-21 | Perforation | 4647.00 | 4648.00 | 20 |
| 2018-11-21 | Multi-Stage Fracture | 4647.00 | 4652.00 | 0 |
| 2018-11-22 | Perforation | 4609.00 | 4610.00 | 20 |
| 2018-11-22 | Perforation | 4605.00 | 4606.00 | 20 |
| 2018-11-22 | Multi-Stage Fracture | 4605.00 | 4610.00 | 0 |
| 2018-11-22 | Perforation | 4565.00 | 4566.00 | 20 |
| 2018-11-10 | Perforation | 5316.00 | 5317.00 | 20 |
| 2018-11-22 | Perforation | 4562.00 | 4563.00 | 20 |
| 2018-11-22 | Multi-Stage Fracture | 4562.00 | 4566.00 | 0 |
| 2018-11-22 | Perforation | 4523.00 | 4524.00 | 20 |
| 2018-11-22 | Perforation | 4519.00 | 4520.00 | 20 |
| 2018-11-22 | Multi-Stage Fracture | 4519.00 | 4524.00 | 0 |
| 2018-11-23 | Perforation | 4481.00 | 4482.00 | 20 |
| 2018-11-23 | Perforation | 4477.00 | 4478.00 | 20 |
| 2018-11-23 | Multi-Stage Fracture | 4477.00 | 4482.00 | 0 |
| 2018-11-23 | Perforation | 4439.00 | 4440.00 | 20 |
| 2018-11-23 | Perforation | 4435.00 | 4436.00 | 20 |
| 2018-11-10 | Multi-Stage Fracture | 5316.00 | 5321.00 | 0 |
| 2018-11-23 | Multi-Stage Fracture | 4435.00 | 4440.00 | 0 |
| 2018-11-24 | Perforation | 4397.00 | 4398.00 | 20 |
| 2018-11-24 | Perforation | 4393.00 | 4394.00 | 20 |
| 2018-11-24 | Multi-Stage Fracture | 4393.00 | 4398.00 | 0 |
| 2018-11-24 | Perforation | 4355.00 | 4356.00 | 20 |
| 2018-11-24 | Perforation | 4351.00 | 4352.00 | 20 |
| 2018-11-24 | Multi-Stage Fracture | 4351.00 | 4356.00 | 0 |
| 2018-11-25 | Perforation | 4313.00 | 4314.00 | 20 |
| 2018-11-25 | Perforation | 4309.00 | 4310.00 | 20 |
| 2018-11-25 | Multi-Stage Fracture | 4309.00 | 4314.00 | 0 |
| 2018-11-11 | Perforation | 5278.00 | 5279.00 | 20 |
| 2018-11-25 | Perforation | 4271.00 | 4272.00 | 20 |
| 2018-11-25 | Perforation | 4268.00 | 4269.00 | 20 |
| 2018-11-25 | Multi-Stage Fracture | 4268.00 | 4272.00 | 0 |
| 2018-11-26 | Perforation | 4230.00 | 4231.00 | 20 |
| 2018-11-26 | Perforation | 4226.00 | 4227.00 | 20 |
| 2018-11-26 | Multi-Stage Fracture | 4226.00 | 4231.00 | 0 |
| 2018-11-26 | Perforation | 4188.00 | 4189.00 | 20 |
| 2018-11-26 | Perforation | 4184.00 | 4185.00 | 20 |
| 2018-11-26 | Multi-Stage Fracture | 4184.00 | 4189.00 | 0 |
| 2018-11-27 | Perforation | 4145.00 | 4146.00 | 20 |
| 2018-11-11 | Perforation | 5275.00 | 5276.00 | 20 |
| 2018-11-27 | Perforation | 4141.00 | 4142.00 | 20 |
| 2018-11-27 | Multi-Stage Fracture | 4141.00 | 4146.00 | 0 |
| 2018-11-27 | Perforation | 4103.00 | 4104.00 | 20 |
| 2018-11-27 | Perforation | 4099.00 | 4100.00 | 20 |
| 2018-11-27 | Multi-Stage Fracture | 4099.00 | 4104.00 | 0 |
| 2018-11-28 | Perforation | 4061.00 | 4062.00 | 20 |
| 2018-11-28 | Perforation | 4057.00 | 4058.00 | 20 |
| 2018-11-28 | Multi-Stage Fracture | 4057.00 | 4062.00 | 0 |
| 2018-11-28 | Perforation | 4019.00 | 4020.00 | 20 |
| 2018-11-28 | Perforation | 4015.00 | 4016.00 | 20 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-11-09 | 2018-12-10 | 2,870 | 40,541 | N/A |
| 2 | 2018-11-13 | 2018-11-13 | 2,870 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 90.4976 | N/A | |||
| 40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 9.4574 | N/A | ||
| Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0088 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0088 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0088 | N/A | ||||
| SFR-302 (Friction Reducer) | Step Energy Services | Friction Reducer | Proprietary | Trade Secret | 100 | 0.0343 | N/A | |
| Sodium Chloride | 7647-14-5 | 100 | 0.0343 | N/A | ||||
| 2 | SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0008 | N/A |
| Cured Acrylic Resin | Not Available | 100 | 0.0008 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0008 | N/A | ||||
| SBX-1 (Crosslinker) | Step Energy Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.0108 | N/A | |
| Ethylene Glycol | 107-21-1 | 100 | 0.0108 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0108 | N/A | ||||
| Potassium Carbonate | 584-08-7 | 100 | 0.0108 | N/A | ||||
| Potassium Hydroxide | 1310-58-3 | 100 | 0.0108 | N/A | ||||
| SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0316 | N/A | |
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0316 | N/A |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 8196 | 0.0 | 0.0 | 0.0 |
| 2020 | 1310 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-07-07 | Lost Circulation | 50.00 | 151.00 |
| 2018-12-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]