X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646102908000

Well Details

Well ID: 0646102908000
Loading map...
Location: 00/08-29-064-10W6/0
Location Alias: 00/08-29-64-10 W6M
Location Alias 2: 00/08-29-064-10 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 10
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: ENCAL ET AL CUTBANK 8-29-64-10
Operator Name: Gain Energy Ltd.
License Number: 0076098
License Date: 1979-06-04
License Status: Suspension
Spud Date: 1979-07-29
Final Drill Date: 1979-12-18
Well Total Depth: 4505.00 m
Surface Hole Latitude: 54.564110
Surface Hole Longitude: -119.464039

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-04 Obtained License
1979-08-01 Lost Circulation Occurred
1979-08-15 Lost Circulation Occurred
1979-08-20 Lost Circulation Occurred
1979-09-10 Drill Stem Test Performed
1979-12-18 Finished Drilling
1979-12-19 Well Log Performed
1979-12-23 Production Casing Operation Performed
1980-02-05 Perforation Treatment Performed - Jet Perforation
1980-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-11 Perforation Treatment Performed - Nitrogen Treatment
1980-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-16 Perforation Treatment Performed - Jet Perforation
1980-02-24 Perforation Treatment Performed - Fractured
1980-03-01 Perforation Treatment Performed - Jet Perforation
1980-03-08 Perforation Treatment Performed - Fractured
1980-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-18 Well Mode changed to Drilled and Cased
1980-08-05 Perforation Treatment Performed - Cement Squeeze
1980-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-25 Perforation Treatment Performed - Jet Perforation
2009-09-26 Well Log Performed
2009-10-06 Perforation Treatment Performed - Jet Perforation
2009-10-06 Well Log Performed
2009-12-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-05 Perforation 4471.50 4477.50 3
1980-03-13 Acid Treatment 3638.40 3649.00 0
1980-08-05 Cement Squeeze 3638.40 3649.00 0
1980-08-23 Packing Device Capped w/Cement 3522.00 3530.00 0
2009-09-25 Perforation 3341.00 3342.00 13
2009-09-25 Perforation 3306.00 3307.00 13
2009-10-06 Perforation 3325.00 3330.00 14
2009-12-17 Fracture 3325.00 3330.00 0
2009-12-17 Fracture 3306.00 3307.00 0
1980-02-08 Acid Treatment 4471.50 4477.50 0
1980-02-11 Nitrogen Treatment 4471.50 4477.50 0
1980-02-14 Packing Device Capped w/Cement 3957.00 3960.00 0
1980-02-16 Perforation 3660.00 3695.00 3
1980-02-24 Fracture 3660.00 3695.00 0
1980-03-01 Perforation 3642.60 3649.00 13
1980-03-01 Perforation 3638.40 3642.40 13
1980-03-08 Fracture 3638.40 3649.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-08-01 Lost Circulation 311.00 311.00
1979-08-15 Lost Circulation 740.00 740.00
1979-08-20 Lost Circulation 1230.00 1234.00
1980-07-31 No Incident Encountered 0.00 0.00
2010-02-13 No Incident Encountered 0.00 0.00
2013-07-04 No Incident Encountered 0.00 0.00
2018-11-30 No Incident Encountered 0.00 0.00

For data sources see[5]

References