X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654121010000

Well Details

Well ID: 0654121010000
Loading map...
Location: 00/10-10-065-12W4/0
Location Alias: 00/10-10-65-12 W4M
Location Alias 2: 00/10-10-065-12 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 12
Section: 10
County/Municipality: Lac La Biche County
Well Name: CVE CRAIGND 10-10-65-12
Operator Name: Cenovus Energy Inc.
License Number: 0036344
License Date: 1969-06-11
License Status: Abandoned
Spud Date: 1969-06-15
Final Drill Date: 1969-06-19
Well Total Depth: 528.50 m
Surface Hole Latitude: 54.611212
Surface Hole Longitude: -111.731046

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-06-11 Obtained License
1969-06-18 Drill Stem Test Performed
1969-06-19 Finished Drilling
1969-06-20 Drill Stem Test Performed
1969-06-20 Production Casing Operation Performed
1970-06-29 Well Mode changed to Drilled and Cased
1970-12-08 Perforation Treatment Performed - Jet Perforation
1970-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-10 Perforation Treatment Performed - Jet Perforation
1970-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-12-12 Perforation Treatment Performed - Jet Perforation
1970-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-15 Perforation Treatment Performed - Jet Perforation
1978-02-02 Well Fluid changed to Gas
1978-02-02 Well Mode changed to Testing
1978-02-03 Perforation Treatment Performed - Cement Squeeze
1978-02-03 Well Abandoned
1978-02-03 Well Fluid changed to Gas
1978-02-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-12-08 Perforation 515.10 516.30 7
1970-12-15 Perforation 372.80 374.00 7
1978-02-03 Cement Squeeze 366.40 374.00 0
1970-12-09 Acid Treatment 515.10 516.30 0
1970-12-10 Perforation 517.60 518.80 7
1970-12-11 Packing Device Capped w/Cement 510.50 510.50 0
1970-12-12 Perforation 366.40 367.60 7
1970-12-12 Perforation 370.90 371.60 7
1970-12-12 Perforation 372.80 373.10 7
1970-12-13 Acid Treatment 366.40 373.10 0
1970-12-14 Acid Treatment 366.40 373.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 792 0.0 0.0 0.0
1976 282 0.0 0.0 0.0

For data sources see[5]

References