If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0654141202004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.605579,"lon":-111.979574,"icon":""}]} |
Location: 00/02-12-065-14W4/4 | |
Location Alias: 00/02-12-65-14 W4M | |
Location Alias 2: 00/02-12-065-14 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 4 | |
Range: 14 | |
Section: 12 | |
County/Municipality: Lac La Biche County | |
Well Name: SOC CRAIGND 2-12-65-14 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0203118 | |
License Date: 1997-07-03 | |
License Status: Issued | |
Spud Date: 1997-07-30 | |
Final Drill Date: 1997-07-31 | |
Well Total Depth: 468.00 m | |
Surface Hole Latitude: 54.605579 | |
Surface Hole Longitude: -111.979574 |
Date | Event |
---|---|
1997-07-03 | Obtained License |
1997-07-30 | Surface Casing Operation Performed |
1997-07-31 | Finished Drilling |
1997-07-31 | Well Log Performed |
1997-07-31 | Well Mode changed to Drilled and Cased |
1997-08-01 | Production Casing Operation Performed |
1997-08-01 | Rig Released |
1997-08-20 | Perforation Treatment Performed - Open-Hole Completion |
1999-01-13 | Perforation Treatment Performed - Chemical Squeeze |
2004-02-14 | Well Log Performed |
2004-02-15 | Perforation Treatment Performed - Jet Perforation |
2004-02-15 | Well Log Performed |
2005-01-26 | Perforation Treatment Performed - Jet Perforation |
2005-01-26 | Well Log Performed |
2005-02-01 | Well Began Production |
2005-02-01 | Well Fluid changed to Gas |
2005-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-08-20 | Open Hole/Barefoot Completion | 461.00 | 468.00 | 0 |
1999-01-13 | Chemical Squeeze | 461.00 | 468.00 | 0 |
2004-02-15 | Perforation | 392.50 | 395.00 | 17 |
2004-02-15 | Perforation | 336.00 | 336.50 | 17 |
2004-02-15 | Perforation | 334.00 | 335.00 | 17 |
2004-02-15 | Perforation | 326.00 | 327.00 | 17 |
2005-01-26 | Perforation | 286.50 | 288.00 | 17 |
2005-01-26 | Perforation | 290.00 | 293.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 8015 | 0.0 | 0.0 | 0.0 |
2006 | 8671 | 0.0 | 0.0 | 0.0 |
2007 | 8693 | 0.0 | 0.0 | 0.0 |
2008 | 8067 | 0.0 | 0.0 | 0.0 |
2009 | 8738 | 0.0 | 0.0 | 0.0 |
2010 | 8688 | 0.0 | 0.0 | 0.0 |
2011 | 8332 | 0.0 | 0.0 | 0.0 |
2012 | 8299 | 0.0 | 0.0 | 0.0 |
2013 | 7848 | 0.0 | 0.0 | 0.0 |
2014 | 7609 | 0.0 | 0.0 | 0.0 |
2015 | 7190 | 0.0 | 0.0 | 0.0 |
2016 | 7915 | 0.0 | 0.0 | 0.0 |
2017 | 7874 | 0.0 | 0.0 | 0.0 |
2018 | 6156 | 0.0 | 0.0 | 0.0 |
2019 | 3449 | 0.0 | 0.0 | 0.0 |
For data sources see[5]