X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654153307000

Well Details

Well ID: 0654153307000
Loading map...
Location: 00/07-33-065-15W4/0
Location Alias: 00/07-33-65-15 W4M
Location Alias 2: 00/07-33-065-15 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 15
Section: 33
County/Municipality: Lac La Biche County
Well Name: PIONEER CANADA HYLO 7-33-65-15
Operator Name: TAQA North Ltd.
License Number: 0078226
License Date: 1979-09-24
License Status: RecCertified
Spud Date: 1979-09-24
Final Drill Date: 1979-09-26
Well Total Depth: 499.00 m
Surface Hole Latitude: 54.667226
Surface Hole Longitude: -112.205528

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-24 Obtained License
1979-09-26 Finished Drilling
1979-09-27 Drill Stem Test Performed
1979-09-28 Drill Stem Test Performed
1979-09-29 Production Casing Operation Performed
1979-11-06 Perforation Treatment Performed - Jet Perforation
1979-12-01 Well Mode changed to Drilled and Cased
1980-04-01 Well Began Production
1980-04-01 Well Fluid changed to Gas
1980-04-01 Well Mode changed to Flowing
1980-10-03 Perforation Treatment Performed - Jet Perforation
1980-10-03 Well Fluid changed to Gas
1980-10-03 Well Mode changed to Flowing
1980-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-11 Perforation Treatment Performed - Casing Patch (Over Perfs)
1981-09-11 Well Fluid changed to Gas
1981-09-11 Well Mode changed to Suspended
1985-01-04 Well Log Performed
1985-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-05 Well Fluid changed to Gas
1985-01-05 Well Mode changed to Abandoned Zone
1985-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-06 Perforation Treatment Performed - Jet Perforation
1986-06-16 Well Log Performed
1987-02-03 Perforation Treatment Performed - Jet Perforation
1987-02-03 Well Log Performed
1987-02-04 Perforation Treatment Performed - Cement Squeeze
1987-02-04 Plug Back Performed
1987-09-09 Perforation Treatment Performed - Jet Perforation
1987-10-14 Perforation Treatment Performed - Remedial Casing
1987-10-14 Plug Back Performed
1997-09-25 Well Log Performed
2001-10-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-06 Perforation 438.50 440.00 7
1987-09-09 Perforation 173.00 175.00 7
1987-10-14 Remedial Casing Cementing 173.00 175.00 0
1980-10-03 Perforation 489.50 490.50 7
1980-10-04 Acid Treatment 489.50 490.50 0
1981-09-11 Casing Patch 438.50 440.00 0
1985-01-05 Packing Device Capped w/Cement 476.00 484.00 0
1985-01-06 Packing Device Capped w/Cement 424.00 432.00 0
1985-01-06 Perforation 306.00 308.00 13
1987-02-03 Perforation 300.00 302.00 13
1987-02-04 Cement Squeeze 300.00 308.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2851 0.0 0.0 0.0
1981 1239 0.0 0.0 0.0
1982 603 0.0 0.0 0.0

For data sources see[5]

References