X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654252610000

Well Details

Well ID: 0654252610000
Loading map...
Location: 00/10-26-065-25W4/0
Location Alias: 00/10-26-65-25 W4M
Location Alias 2: 00/10-26-065-25 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 25
Section: 26
County/Municipality: Athabasca County
Well Name: VH1 STEELE 10-26-65-25
Operator Name: Harvest Operations Corp.
License Number: 0055787
License Date: 1975-11-13
License Status: Abandoned
Spud Date: 1975-11-15
Final Drill Date: 1975-11-20
Well Total Depth: 823.00 m
Surface Hole Latitude: 54.655360
Surface Hole Longitude: -113.667245

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-13 Obtained License
1975-11-20 Finished Drilling
1975-11-21 Well Log Performed
1975-11-22 Drill Stem Test Performed
1975-11-23 Drill Stem Test Performed
1975-11-24 Drill Stem Test Performed
1975-11-25 Production Casing Operation Performed
1976-06-03 Perforation Treatment Performed - Jet Perforation
1976-06-23 Well Mode changed to Drilled and Cased
1977-03-28 Well Began Production
1977-03-28 Well Fluid changed to Gas
1977-03-28 Well Mode changed to Flowing
1977-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-02 Well Fluid changed to Gas
1977-05-02 Well Mode changed to Suspended
1977-05-03 Perforation Treatment Performed - Jet Perforation
1977-05-03 Well Log Performed
1977-06-14 Perforation Treatment Performed - Cement Squeeze
1977-06-15 Perforation Treatment Performed - Jet Perforation
1980-11-28 Well Fluid changed to Gas
1980-11-28 Well Mode changed to Flowing
1992-02-01 Well Fluid changed to Gas
1992-02-01 Well Mode changed to Suspended
1992-10-23 Perforation Treatment Performed - Cement Squeeze
1992-10-23 Plug Back Performed
1992-10-23 Well Fluid changed to Gas
1992-10-23 Well Mode changed to Suspended
1992-10-25 Perforation Treatment Performed - Jet Perforation
1993-12-06 Perforation Treatment Performed - Jet Perforation
1993-12-07 Well Fluid changed to Gas
1993-12-07 Well Mode changed to Suspended
1995-10-27 Perforation Treatment Performed - Jet Perforation
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Flowing
2002-11-01 Well Fluid changed to Gas
2002-11-01 Well Mode changed to Suspended
2003-10-09 Well Log Performed
2003-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-10 Plug Back Performed
2003-10-10 Well Fluid changed to Gas
2003-10-10 Well Mode changed to Abandoned Zone
2003-10-15 Perforation Treatment Performed - Jet Perforation
2003-10-15 Well Log Performed
2003-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-19 Perforation Treatment Performed - Cement Squeeze
2003-10-19 Plug Back Performed
2005-05-01 Perforation Treatment Performed - Cement Squeeze
2005-05-01 Plug Back Performed
2005-05-12 Perforation Treatment Performed - Jet Perforation
2005-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-23 Well Fluid changed to Gas
2005-07-23 Well Mode changed to Flowing
2008-01-01 Well Fluid changed to Gas
2008-01-01 Well Mode changed to Suspended
2009-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-12 Plug Back Performed
2009-06-12 Well Fluid changed to Gas
2009-06-12 Well Mode changed to Abandoned Zone
2009-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-13 Plug Back Performed
2009-07-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-03 Perforation 585.80 587.70 7
1995-10-27 Perforation 599.20 601.00 13
2003-10-10 Packing Device Capped w/Cement 747.00 755.00 0
2003-10-15 Perforation 551.00 551.50 17
2003-10-16 Acid Treatment 551.00 551.50 0
2003-10-19 Cement Squeeze 551.00 601.00 0
2005-05-01 Cement Squeeze 657.10 659.00 0
2005-05-12 Perforation 772.40 776.00 7
2005-05-15 Acid Treatment 772.40 776.00 0
2009-06-12 Packing Device Capped w/Cement 755.00 765.00 0
2009-06-13 Packing Device Capped w/Cement 567.00 577.00 0
1976-06-03 Perforation 772.40 776.00 7
1977-05-02 Acid Treatment 585.80 587.70 0
1977-05-03 Perforation 550.80 552.60 7
1977-06-14 Cement Squeeze 550.80 552.60 0
1977-06-15 Perforation 549.90 551.40 7
1992-10-23 Cement Squeeze 549.90 587.70 0
1992-10-25 Perforation 587.70 590.10 13
1993-12-06 Perforation 657.10 659.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 109 0.0 0.0 0.0
1980 804 0.0 0.0 0.0
1981 5947 0.0 0.0 0.0
1982 5196 0.0 0.0 0.0
1983 2910 0.0 0.0 0.0
1984 3658 0.0 0.0 0.0
1985 3926 0.0 0.0 0.0
1986 5368 0.0 0.0 0.0
1987 5000 0.0 0.0 0.0
1988 4419 0.0 0.0 0.0
1989 6244 0.0 0.0 0.0
1990 4665 0.0 0.0 0.0
1991 1079 0.0 0.0 0.0
2002 677 0.0 0.0 0.0
2005 3653 0.0 0.0 0.0
2006 199 0.0 0.0 0.0

For data sources see[5]

References