X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655112504000

Well Details

Well ID: 0655112504000
Loading map...
Location: 00/04-25-065-11W5/0
Location Alias: 00/04-25-65-11 W5M
Location Alias 2: 00/04-25-065-11 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 11
Section: 25
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 4-25-65-11
Operator Name: Razor Energy Corp.
License Number: 0019189
License Date: 1960-06-13
License Status: Issued
Spud Date: 1960-07-03
Final Drill Date: 1960-07-31
Well Total Depth: 2619.80 m
Surface Hole Latitude: 54.648734
Surface Hole Longitude: -115.535389

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-13 Obtained License
1960-07-31 Finished Drilling
1960-07-31 Well Mode changed to Drilled and Cased
1960-08-01 Production Casing Operation Performed
1960-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-04 Perforation Treatment Performed - Jet Perforation
1960-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-07 Perforation Treatment Performed - Cement Squeeze
1960-08-07 Perforation Treatment Performed - Jet Perforation
1960-08-10 Perforation Treatment Performed - Cement Squeeze
1960-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-12 Perforation Treatment Performed - Jet Perforation
1960-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-08-23 Well Began Production
1960-08-23 Well Fluid changed to Crude Oil
1960-08-23 Well Mode changed to Flowing
1967-06-14 Perforation Treatment Performed - Jet Perforation
1967-06-16 Perforation Treatment Performed - Jet Perforation
1967-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-12 Well Fluid changed to Crude Oil
1973-06-12 Well Mode changed to Pumping
1990-07-01 Perforation Treatment Performed - Jet Perforation
1990-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-03 Perforation Treatment Performed - Jet Perforation
1990-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-13 Perforation Treatment Performed - Remedial Casing
1998-10-07 Well Log Performed
2017-03-01 Well Fluid changed to Crude Oil
2017-03-01 Well Mode changed to Suspended
2017-07-30 Well Fluid changed to Crude Oil
2017-07-30 Well Mode changed to Pumping
2018-01-26 Well Log Performed
2018-12-16 Perforation Treatment Performed - Jet Perforation
2018-12-16 Well Log Performed
2018-12-17 Perforation Treatment Performed - Jet Perforation
2018-12-17 Well Log Performed
2018-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-01-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-04 Perforation 2598.70 2601.80 13
1960-08-12 Acid Treatment 2576.80 2592.00 0
1960-08-13 Packing Device Capped w/Cement 2587.80 2587.80 0
1967-06-14 Perforation 2540.20 2546.00 7
1967-06-16 Perforation 2550.60 2551.80 7
1967-06-26 Acid Treatment 2540.20 2551.80 0
1990-07-01 Perforation 1139.00 1140.00 13
1990-07-02 Acid Treatment 1139.00 1140.00 0
1990-07-03 Perforation 1133.50 1134.00 13
1990-07-13 Acid Treatment 1133.50 1140.00 0
1990-07-13 Remedial Casing Cementing 1133.50 1140.00 0
1960-08-04 Acid Treatment 2598.70 2601.80 0
2018-12-16 Perforation 2575.50 2578.50 17
2018-12-16 Perforation 2571.60 2573.10 17
2018-12-16 Perforation 2569.20 2570.10 17
2018-12-17 Perforation 2563.00 2567.50 17
2018-12-19 Acid Treatment 2562.50 2576.50 0
1960-08-07 Cement Squeeze 2598.70 2601.80 0
1960-08-07 Perforation 2593.80 2596.30 13
1960-08-07 Acid Treatment 2593.80 2596.30 0
1960-08-10 Cement Squeeze 2593.80 2596.30 0
1960-08-12 Perforation 2576.80 2579.80 13
1960-08-12 Perforation 2582.30 2583.20 13
1960-08-12 Perforation 2590.20 2592.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1967 1074 0.0 0.0 0.0
1968 6670 0.0 0.0 0.0
1969 5645 0.0 0.0 0.0
1970 7400 0.0 0.0 0.0
1971 6524 0.0 0.0 0.0
1972 4069 0.0 0.0 0.0
1973 5851 0.0 0.0 0.0
1974 6202 0.0 0.0 0.0
1975 7035 0.0 0.0 0.0
1976 7975 0.0 0.0 0.0
1977 6952 0.0 0.0 0.0
1978 5299 0.0 0.0 0.0
1979 8417 0.0 0.0 0.0
1980 8156 0.0 0.0 0.0
1981 5637 0.0 0.0 0.0
1982 7380 0.0 0.0 0.0
1983 8613 0.0 0.0 0.0
1984 8603 0.0 0.0 0.0
1985 7876 0.0 0.0 0.0
1986 8365 0.0 0.0 0.0
1987 8609 0.0 0.0 0.0
1988 8580 0.0 0.0 0.0
1989 8512 0.0 0.0 0.0
1990 8202 0.0 0.0 0.0
1991 8544 0.0 0.0 0.0
1992 8523 0.0 0.0 0.0
1993 8510 0.0 0.0 0.0
1994 8658 0.0 0.0 0.0
1995 8508 0.0 0.0 0.0
1996 8593 0.0 0.0 0.0
1997 8695 0.0 0.0 0.0
1998 8170 0.0 0.0 0.0
1999 8677 0.0 0.0 0.0
2000 8636 0.0 0.0 0.0
2001 8593 0.0 0.0 0.0
2002 8558 0.0 0.0 0.0
2003 8721 0.0 0.0 0.0
2004 8397 0.0 0.0 0.0
2005 8646 0.0 0.0 0.0
2006 8324 0.0 0.0 0.0
2007 8526 0.0 0.0 0.0
2008 6742 0.0 0.0 0.0
2009 8642 0.0 0.0 0.0
2010 8378 0.0 0.0 0.0
2011 6981 0.0 0.0 0.0
2012 7221 0.0 0.0 0.0
2013 7912 0.0 0.0 0.0
2014 7173 0.0 0.0 0.0
2015 7819 0.0 0.0 0.0
2016 643 0.0 0.0 0.0
2017 3679 0.0 0.0 0.0
2018 6283 0.0 0.0 0.0
2019 4250 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-17 No Incident Encountered 0.00 0.00
2019-01-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References