X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655113512000

Well Details

Well ID: 0655113512000
Loading map...
Location: 00/12-35-065-11W5/0
Location Alias: 00/12-35-65-11 W5M
Location Alias 2: 00/12-35-065-11 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 11
Section: 35
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 12-35-65-11
Operator Name: Razor Energy Corp.
License Number: 0021526
License Date: 1961-10-13
License Status: Amended
Spud Date: 1961-11-21
Final Drill Date: 1961-12-19
Well Total Depth: 2623.40 m
Surface Hole Latitude: 54.670412
Surface Hole Longitude: -115.560580

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-13 Obtained License
1961-12-19 Finished Drilling
1961-12-19 Well Mode changed to Drilled and Cased
1961-12-22 Production Casing Operation Performed
1962-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-03 Perforation Treatment Performed - Jet Perforation
1962-01-07 Well Began Production
1962-01-07 Well Fluid changed to Crude Oil
1962-01-07 Well Mode changed to Flowing
1968-11-28 Perforation Treatment Performed - Jet Perforation
1968-11-29 Perforation Treatment Performed - Jet Perforation
1968-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-01 Well Began Injection
1969-02-01 Well Fluid changed to Solvent
1969-02-01 Well Type changed to Injection
1993-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-10 Plug Back Performed
1993-08-01 Well Fluid changed to Solvent
1993-08-01 Well Mode changed to Abandoned and Whipstocked
1993-08-01 Well Type changed to Injection
2003-10-26 Well Log Performed
2003-10-27 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-03 Perforation 2582.30 2584.10 3
1968-11-28 Perforation 2587.80 2588.70 3
1968-11-29 Perforation 2583.20 2592.30 3
1968-11-29 Perforation 2593.80 2595.40 3
1968-11-29 Perforation 2596.30 2597.50 3
1968-11-29 Perforation 2598.40 2600.60 3
1968-11-29 Perforation 2601.20 2610.30 3
1968-11-30 Acid Treatment 2575.00 2610.30 0
1968-12-01 Acid Treatment 2575.00 2610.30 0
1993-07-10 Packing Device Capped w/Cement 2543.90 2551.90 0
1962-01-03 Perforation 2585.30 2587.80 3
1962-01-03 Perforation 2589.00 2589.60 3
1962-01-03 Perforation 2590.80 2591.70 3
1962-01-03 Acid Treatment 2582.30 2591.70 0
1968-11-28 Perforation 2575.00 2578.00 3
1968-11-28 Perforation 2579.20 2581.00 3
1968-11-28 Perforation 2582.30 2584.70 3
1968-11-28 Perforation 2585.90 2586.50 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References