X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655120804000

Well Details

Well ID: 0655120804000
Loading map...
Location: 00/04-08-065-12W5/0
Location Alias: 00/04-08-65-12 W5M
Location Alias 2: 00/04-08-065-12 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 12
Section: 08
County/Municipality: Big Lakes County
Well Name: 1976082 VIRG 4-8-65-12
Operator Name: Razor Energy Corp.
License Number: 0071022
License Date: 1978-07-31
License Status: Suspension
Spud Date: 1978-11-05
Final Drill Date: 1978-11-27
Well Total Depth: 2805.00 m
Surface Hole Latitude: 54.606837
Surface Hole Longitude: -115.784877

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-31 Obtained License
1978-11-05 Lost Circulation Occurred
1978-11-27 Finished Drilling
1978-11-27 Well Mode changed to Drilled and Cased
1978-12-01 Production Casing Operation Performed
1979-01-20 Perforation Treatment Performed - Jet Perforation
1979-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-12 Well Began Production
1979-04-12 Well Fluid changed to Crude Oil
1979-04-12 Well Mode changed to Pumping
1985-02-01 Well Log Performed
1985-02-04 Perforation Treatment Performed - Cement Squeeze
1985-02-06 Well Log Performed
1985-02-07 Perforation Treatment Performed - Jet Perforation
1985-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-09 Well Fluid changed to Crude Oil
1999-02-09 Well Mode changed to Suspended
1999-11-10 Well Fluid changed to Crude Oil
1999-11-10 Well Mode changed to Pumping
2017-03-01 Well Fluid changed to Crude Oil
2017-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-20 Perforation 2755.50 2760.00 7
1985-02-09 Acid Treatment 2766.70 2772.00 0
1979-01-21 Acid Treatment 2755.50 2760.00 0
1985-02-04 Cement Squeeze 2755.50 2760.00 0
1985-02-07 Perforation 2761.70 2762.50 13
1985-02-07 Perforation 2763.20 2764.20 13
1985-02-07 Perforation 2765.20 2765.80 13
1985-02-07 Perforation 2766.70 2767.30 13
1985-02-07 Perforation 2768.50 2769.00 13
1985-02-07 Perforation 2771.00 2772.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2328 0.0 0.0 0.0
1980 7927 0.0 0.0 0.0
1981 7680 0.0 0.0 0.0
1982 6898 0.0 0.0 0.0
1983 341 0.0 0.0 0.0
1985 518 0.0 0.0 0.0
1991 5899 0.0 0.0 0.0
1992 8410 0.0 0.0 0.0
1993 8668 0.0 0.0 0.0
1994 8751 0.0 0.0 0.0
1995 7607 0.0 0.0 0.0
1996 8063 0.0 0.0 0.0
1997 8739 0.0 0.0 0.0
1998 8200 0.0 0.0 0.0
1999 2142 0.0 0.0 0.0
2000 7960 0.0 0.0 0.0
2001 8711 0.0 0.0 0.0
2002 7939 0.0 0.0 0.0
2003 8727 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8721 0.0 0.0 0.0
2006 8655 0.0 0.0 0.0
2007 6180 0.0 0.0 0.0
2008 8746 0.0 0.0 0.0
2009 7835 0.0 0.0 0.0
2010 8328 0.0 0.0 0.0
2011 3902 0.0 0.0 0.0
2012 8318 0.0 0.0 0.0
2013 220 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-11-05 Lost Circulation 200.00 200.00

For data sources see[6]

References