X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655130403000

Well Details

Well ID: 0655130403000
Loading map...
Location: 00/03-04-065-13W5/0
Location Alias: 00/03-04-65-13 W5M
Location Alias 2: 00/03-04-065-13 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 13
Section: 04
County/Municipality: Big Lakes County
Well Name: CPEC HZ JUDYCK 3-4-65-13
Operator Name: Crescent Point Energy Corp.
License Number: 0496057
License Date: 2019-10-10
License Status: Amended
Spud Date: 2019-12-09
Final Drill Date: 2020-01-07
Well Total Depth: 5390.00 m
Surface Hole Latitude: 54.595632
Surface Hole Longitude: -115.947368

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-12-16 2466.40 Deviate (5 - 79 degrees)
2019-12-17 3100.50 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-09 Perforation 5017.70 5018.00 6
2020-02-24 Perforation 4531.20 4531.40 6
2020-02-25 Perforation 4450.30 4450.50 6
2020-02-25 Perforation 4377.10 4377.30 6
2020-02-25 Perforation 4292.80 4293.00 6
2020-02-25 Perforation 4211.10 4211.30 2
2020-02-25 Perforation 4130.40 4130.60 6
2020-02-25 Perforation 4049.30 4049.50 6
2020-02-25 Perforation 3967.00 3968.80 6
2020-02-26 Perforation 3889.10 3889.30 6
2020-02-26 Perforation 3810.90 3811.10 6
2020-02-15 Perforation 3261.80 3262.00 6
2020-02-26 Perforation 3730.80 3731.00 6
2020-02-26 Perforation 3651.90 3652.10 6
2020-02-26 Perforation 3572.50 3572.70 6
2020-02-26 Perforation 3495.10 3495.30 6
2020-03-01 Open Hole/Barefoot Completion 5383.50 5390.00 0
2020-03-01 Multi-Stage Fracture 4936.80 4937.00 0
2020-03-01 Multi-Stage Fracture 4855.40 4855.60 0
2020-03-01 Multi-Stage Fracture 4773.60 4773.80 0
2020-03-01 Multi-Stage Fracture 4692.40 4692.60 0
2020-03-01 Multi-Stage Fracture 4612.00 4612.20 0
2020-02-15 Perforation 3336.70 3336.90 6
2020-03-01 Multi-Stage Fracture 4531.20 4531.40 0
2020-03-01 Multi-Stage Fracture 4450.30 4450.50 0
2020-03-01 Multi-Stage Fracture 4377.10 4377.30 0
2020-03-01 Multi-Stage Fracture 4292.80 4293.00 0
2020-03-01 Multi-Stage Fracture 4211.10 4211.30 0
2020-03-01 Multi-Stage Fracture 4130.40 4130.60 0
2020-03-01 Multi-Stage Fracture 4049.30 4049.50 0
2020-03-01 Multi-Stage Fracture 3967.00 3968.80 0
2020-03-01 Multi-Stage Fracture 3889.10 3889.30 0
2020-03-01 Multi-Stage Fracture 3810.90 3811.10 0
2020-02-21 Perforation 3413.80 3414.00 6
2020-03-01 Multi-Stage Fracture 3730.80 3731.00 0
2020-03-01 Multi-Stage Fracture 3651.90 3652.10 0
2020-03-01 Multi-Stage Fracture 3572.50 3572.70 0
2020-03-01 Multi-Stage Fracture 3495.10 3495.30 0
2020-03-01 Multi-Stage Fracture 3413.80 3414.00 0
2020-03-01 Multi-Stage Fracture 3336.70 3336.90 0
2020-03-01 Multi-Stage Fracture 3261.80 3262.00 0
2020-02-24 Perforation 4936.80 4937.00 6
2020-02-24 Perforation 4855.40 4855.60 6
2020-02-24 Perforation 4773.60 4773.80 6
2020-02-24 Perforation 4692.40 4692.60 6
2020-02-24 Perforation 4612.00 4612.20 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 443 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-09 Lost Circulation 85.00 85.00
2020-03-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References