X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655132102000

Well Details

Well ID: 0655132102000
Loading map...
Location: 00/02-21-065-13W5/0
Location Alias: 00/02-21-65-13 W5M
Location Alias 2: 00/02-21-065-13 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 13
Section: 21
County/Municipality: Big Lakes County
Well Name: 1976082 VIRG 2-21-65-13
Operator Name: Razor Energy Corp.
License Number: 0020017
License Date: 1960-11-22
License Status: Suspension
Spud Date: 1960-11-24
Final Drill Date: 1960-12-21
Well Total Depth: 2840.10 m
Surface Hole Latitude: 54.634208
Surface Hole Longitude: -115.901028

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-11-22 Obtained License
1960-11-24 Lost Circulation Occurred
1960-12-21 Finished Drilling
1960-12-21 Well Mode changed to Drilled and Cased
1960-12-23 Production Casing Operation Performed
1960-12-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-24 Perforation Treatment Performed - Jet Perforation
1961-01-07 Well Began Production
1961-01-07 Well Fluid changed to Crude Oil
1961-01-07 Well Mode changed to Flowing
1963-03-07 Perforation Treatment Performed - Jet Perforation
1963-03-25 Well Fluid changed to Crude Oil
1963-03-25 Well Mode changed to Pumping
1977-02-11 Well Log Performed
1992-08-31 Well Log Performed
1992-09-01 Well Log Performed
2005-12-03 Perforation Treatment Performed - Chemical Squeeze
2010-10-05 Well Fluid changed to Crude Oil
2010-10-05 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-12-24 Perforation 2802.30 2807.50 7
1960-12-24 Acid Treatment 2802.30 2807.50 0
1963-03-07 Perforation 2797.80 2800.50 7
1963-03-07 Perforation 2809.00 2815.10 7
2005-12-03 Chemical Squeeze 2797.80 2815.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2320 0.0 0.0 0.0
1968 3509 0.0 0.0 0.0
1969 8351 0.0 0.0 0.0
1970 5614 0.0 0.0 0.0
1971 1587 0.0 0.0 0.0
1972 4599 0.0 0.0 0.0
1973 8088 0.0 0.0 0.0
1974 8205 0.0 0.0 0.0
1975 7741 0.0 0.0 0.0
1976 8428 0.0 0.0 0.0
1977 8447 0.0 0.0 0.0
1978 8489 0.0 0.0 0.0
1979 8419 0.0 0.0 0.0
1980 7903 0.0 0.0 0.0
1981 7273 0.0 0.0 0.0
1982 2786 0.0 0.0 0.0
1983 8367 0.0 0.0 0.0
1984 8348 0.0 0.0 0.0
1985 8631 0.0 0.0 0.0
1986 7871 0.0 0.0 0.0
1987 8667 0.0 0.0 0.0
1988 8021 0.0 0.0 0.0
1989 7335 0.0 0.0 0.0
1990 8445 0.0 0.0 0.0
1991 8311 0.0 0.0 0.0
1992 8441 0.0 0.0 0.0
1993 8033 0.0 0.0 0.0
1994 8489 0.0 0.0 0.0
1995 8388 0.0 0.0 0.0
1996 8623 0.0 0.0 0.0
1997 8257 0.0 0.0 0.0
1998 7581 0.0 0.0 0.0
1999 8563 0.0 0.0 0.0
2000 8473 0.0 0.0 0.0
2001 8283 0.0 0.0 0.0
2002 8554 0.0 0.0 0.0
2003 8593 0.0 0.0 0.0
2004 8475 0.0 0.0 0.0
2005 7540 0.0 0.0 0.0
2006 7368 0.0 0.0 0.0
2007 8245 0.0 0.0 0.0
2008 2073 0.0 0.0 0.0
2009 3029 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-11-24 Lost Circulation 134.10 134.10

For data sources see[6]

References