X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655190112000

Well Details

Well ID: 0655190112000
Loading map...
Location: 00/12-01-065-19W5/0
Location Alias: 00/12-01-65-19 W5M
Location Alias 2: 00/12-01-065-19 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 19
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: SOC KAYBOB 12-1-65-19
Operator Name: AlphaBow Energy Ltd.
License Number: 0024668
License Date: 1963-08-15
License Status: Issued
Spud Date: 1963-08-25
Final Drill Date: 1963-09-27
Well Total Depth: 3020.90 m
Surface Hole Latitude: 54.598016
Surface Hole Longitude: -116.745812

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-15 Obtained License
1963-09-27 Finished Drilling
1963-09-27 Well Mode changed to Drilled and Cased
1963-09-29 Production Casing Operation Performed
1963-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-08 Perforation Treatment Performed - Jet Perforation
1963-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-11 Well Began Production
1963-10-11 Well Fluid changed to Crude Oil
1963-10-11 Well Mode changed to Flowing
1963-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-01 Well Fluid changed to Crude Oil
1963-11-01 Well Mode changed to Pumping
1964-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-30 Well Fluid changed to Crude Oil
1970-01-30 Well Mode changed to Suspended
1970-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-02-09 Well Fluid changed to Crude Oil
1970-02-09 Well Mode changed to Suspended
1970-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-02-10 Perforation Treatment Performed - Jet Perforation
1970-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-02-19 Perforation Treatment Performed - Jet Perforation
1970-02-21 Perforation Treatment Performed - Cement Squeeze
1970-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-03-01 Perforation Treatment Performed - Jet Perforation
1970-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-10-08 Perforation 2968.80 2971.50 3
1970-02-10 Acid Treatment 1424.00 1431.60 0
1970-02-12 Acid Treatment 1424.00 1431.60 0
1970-02-19 Perforation 1449.00 1449.60 13
1970-02-21 Cement Squeeze 1449.00 1449.60 0
1970-02-21 Cement Squeeze 1424.00 1428.60 0
1970-03-01 Perforation 1428.00 1430.10 7
1970-03-01 Acid Treatment 1428.00 1430.10 0
1970-05-08 Acid Treatment 1430.40 1431.60 0
1963-10-08 Perforation 2973.00 2975.80 3
1963-10-08 Acid Treatment 2968.80 2975.80 0
1963-10-09 Acid Treatment 2968.80 2975.80 0
1963-10-24 Acid Treatment 2968.80 2975.80 0
1964-03-05 Acid Treatment 2968.80 2975.80 0
1970-02-09 Packing Device Capped w/Cement 1466.10 1477.70 0
1970-02-10 Perforation 1430.40 1431.60 7
1970-02-10 Perforation 1424.00 1428.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1970 11 0.0 0.0 0.0

For data sources see[5]

References