X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655201113000

Well Details

Well ID: 0655201113000
Loading map...
Location: 00/13-11-065-20W5/0
Location Alias: 00/13-11-65-20 W5M
Location Alias 2: 00/13-11-065-20 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: AEL ET AL KAYBOB 13-11-65-20
Operator Name: Archean Energy Ltd.
License Number: 0138329
License Date: 1989-01-19
License Status: Re-Entered
Spud Date: 1989-02-21
Final Drill Date: 1989-02-26
Well Total Depth: 1473.00 m
Surface Hole Latitude: 54.614997
Surface Hole Longitude: -116.919741

For data sources see[1][2]

Well History

Date Event
1989-01-19 Obtained License
1989-02-22 Surface Casing Operation Performed
1989-02-26 Finished Drilling
1989-02-26 Well Mode changed to Drilled and Cased
1989-02-27 Drill Stem Test Performed
1989-02-27 Well Log Performed
1989-03-01 Drill Stem Test Performed
1989-03-02 Production Casing Operation Performed
1989-03-02 Rig Released
1989-03-06 Well Log Performed
1989-03-09 Perforation Treatment Performed - Jet Perforation
1989-04-28 Well Began Production
1989-04-28 Well Fluid changed to Gas
1989-04-28 Well Mode changed to Flowing
1993-04-14 Well Log Performed
1993-06-01 Well Fluid changed to Gas
1993-06-01 Well Mode changed to Suspended
1995-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-28 Perforation Treatment Performed - Jet Perforation
1995-12-28 Perforation Treatment Performed - Remedial Casing
1995-12-28 Plug Back Performed
1995-12-28 Well Abandoned
1995-12-28 Well Fluid changed to Gas
1995-12-28 Well Log Performed
1995-12-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-09 Perforation 1400.00 1405.00 13
1995-12-28 Packing Device Capped w/Cement 1389.00 1397.00 0
1995-12-28 Perforation 295.00 296.00 14
1995-12-28 Remedial Casing Cementing 295.00 296.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 222 0.0 0.0 0.0
1990 2756 0.0 0.0 0.0
1991 6212 0.0 0.0 0.0
1992 7572 0.0 0.0 0.0
1993 740 0.0 0.0 0.0

For data sources see[5]

References