If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0656032813020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.6459,"lon":-118.397921,"icon":""}]} |
| Location: 02/13-28-065-03W6/0 | |
| Location Alias: 02/13-28-65-03 W6M | |
| Location Alias 2: 02/13-28-065-03 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 28 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HHR 102 HZ KARR 13-28-65-3 | |
| Operator Name: Hammerhead Resources Inc. | |
| License Number: 0480206 | |
| License Date: 2016-08-29 | |
| License Status: Issued | |
| Spud Date: 2016-12-03 | |
| Final Drill Date: 2016-12-30 | |
| Well Total Depth: 4283.50 m | |
| Surface Hole Latitude: 54.645900 | |
| Surface Hole Longitude: -118.397921 |
| Date | Event |
|---|---|
| 2016-08-29 | Obtained License |
| 2016-12-05 | Surface Casing Operation Performed |
| 2016-12-08 | Direction Drilling Operation Performed - Deviate |
| 2016-12-16 | Direction Drilling Operation Performed - Horizontal |
| 2016-12-30 | Finished Drilling |
| 2016-12-30 | Well Log Performed |
| 2016-12-30 | Well Mode changed to Drilled and Cased |
| 2016-12-31 | Production Casing Operation Performed |
| 2017-01-01 | Liner Casing Operation Performed |
| 2017-01-02 | Rig Released |
| 2017-01-31 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-07-20 | Well Began Production |
| 2017-07-20 | Well Fluid changed to Crude Oil |
| 2017-07-20 | Well Mode changed to Gas Lift |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-12-03 | Precision Drilling Corporation | 225 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-12-08 | 1012.80 | Deviate (5 - 79 degrees) |
| 2016-12-16 | 2744.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-01-31 | Open Hole/Barefoot Completion | 4275.50 | 4283.50 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 3927.80 | 3927.90 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3888.10 | 3888.20 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3835.90 | 3836.00 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3796.00 | 3796.10 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3756.00 | 3756.10 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3703.80 | 3703.90 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3664.20 | 3664.30 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3624.30 | 3624.40 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3571.90 | 3572.00 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3532.20 | 3532.30 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 4264.10 | 4264.20 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3480.10 | 3480.20 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3440.10 | 3440.20 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3400.10 | 3400.20 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3348.10 | 3348.20 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3308.20 | 3308.30 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3268.30 | 3268.40 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3216.20 | 3216.30 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3176.60 | 3176.70 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3149.50 | 3149.60 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3097.20 | 3097.30 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 4218.50 | 4218.60 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3057.50 | 3057.60 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 3030.20 | 3030.30 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 2977.90 | 2978.00 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 2938.10 | 2938.20 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 2910.80 | 2910.90 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 2870.80 | 2870.90 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 2830.80 | 2830.90 | 0 |
| 2017-02-18 | Multi-Stage Fracture | 2790.70 | 2790.80 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 4178.80 | 4178.90 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 4151.60 | 4151.70 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 4099.80 | 4099.90 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 4060.00 | 4060.10 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 4020.30 | 4020.40 | 0 |
| 2017-02-17 | Multi-Stage Fracture | 3967.60 | 3967.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-02-17 | 2017-02-18 | 2,606 | 1,755 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 48.6997 | N/A | |||
| FRAC SAND. 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 23.1496 | N/A | ||
| FRAC SAND.70/140 OR 50/140 CANADIAN | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.9663 | N/A | ||
| Alpha 544 | Baker Hughes | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0048 | N/A | |
| Dibromoacetonitrile | 3252-43-5 | 100 | 0.0048 | N/A | ||||
| Polyethylene Glycol | 25322-68-3 | 100 | 0.0048 | N/A | ||||
| Sodium Bromide | 7647-15-6 | 100 | 0.0048 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0048 | N/A | ||||
| Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0166 | N/A | |
| CC-2 | Baker Hughes | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0541 | N/A | |
| Non-hazardous | Not Available | 100 | 0.0541 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0541 | N/A | ||||
| FP-13L | Baker Hughes | Defoamer | Tributyl phosphate | 126-73-8 | 100 | 0.0021 | N/A | |
| D-3 | Baker Hughes | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0389 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0389 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0389 | N/A | ||||
| Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 38.3246 | N/A | |
| FAW-30 | Baker Hughes | Friction Reducer | Amine derivative | 9842 | 100 | 0.427 | N/A | |
| Glycerine | 56-81-5 | 100 | 0.427 | N/A | ||||
| MaxPerm-20A | Baker Hughes | Friction Reducer | Non-hazardous | 9014 | 100 | 0.308 | N/A | |
| Oxyalkylated alcohol | 9014 | 100 | 0.308 | N/A | ||||
| Petroleum distillates | 64742-47-8 | 100 | 0.308 | N/A | ||||
| Polyacrylate | 9014 | 100 | 0.308 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-01-31 | 2017-02-01 | Surface Water - Runoff | 2889 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 3846 | 0.0 | 0.0 | 0.0 |
| 2018 | 8118 | 0.0 | 0.0 | 0.0 |
| 2019 | 8378 | 0.0 | 0.0 | 0.0 |
| 2020 | 2098 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-12-03 | No Incident Encountered | 0.00 | 0.00 |
| 2017-03-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]