If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0656043209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.673812,"lon":-118.609246,"icon":""}]} |
| Location: 00/09-32-065-04W6/0 | |
| Location Alias: 00/09-32-65-04 W6M | |
| Location Alias 2: 00/09-32-065-04 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 32 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA HZ KARR 9-32-65-4 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0479456 | |
| License Date: 2016-05-13 | |
| License Status: Amended | |
| Spud Date: 2016-08-01 | |
| Final Drill Date: 2016-10-27 | |
| Well Total Depth: 5960.00 m | |
| Surface Hole Latitude: 54.673812 | |
| Surface Hole Longitude: -118.609246 |
| Date | Event |
|---|---|
| 2016-05-13 | Obtained License |
| 2016-08-03 | Surface Casing Operation Performed |
| 2016-08-20 | Direction Drilling Operation Performed - Deviate |
| 2016-08-28 | Well Log Performed |
| 2016-08-29 | Intermediate Casing Operation Performed |
| 2016-10-13 | Direction Drilling Operation Performed - Horizontal |
| 2016-10-14 | Well Log Performed |
| 2016-10-27 | Finished Drilling |
| 2016-10-27 | Well Log Performed |
| 2016-10-27 | Well Mode changed to Drilled and Cased |
| 2016-10-29 | Well Log Performed |
| 2016-11-04 | Liner Casing Operation Performed |
| 2016-11-06 | Rig Released |
| 2017-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2017-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-27 | Perforation Treatment Performed - Jet Perforation |
| 2017-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-28 | Perforation Treatment Performed - Jet Perforation |
| 2017-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-09 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-11 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-12 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-13 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-16 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-17 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-18 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-19 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-20 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-22 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-23 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-24 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-25 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-26 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-28 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-30 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-03-31 | Perforation Treatment Performed - Jet Perforation |
| 2017-03-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-01 | Perforation Treatment Performed - Jet Perforation |
| 2017-04-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-01 | Well Began Production |
| 2017-04-01 | Well Fluid changed to Gas |
| 2017-04-01 | Well Mode changed to Flowing |
| 2017-04-02 | Perforation Treatment Performed - Jet Perforation |
| 2017-04-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-03 | Perforation Treatment Performed - Jet Perforation |
| 2017-04-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-04 | Perforation Treatment Performed - Jet Perforation |
| 2017-04-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-05 | Perforation Treatment Performed - Jet Perforation |
| 2017-04-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-11-01 | Well Fluid changed to Gas |
| 2019-11-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-10-11 | Fox Drilling Inc. | 4 | N/A | Resumption |
| 2016-08-19 | Fox Drilling Inc. | 4 | N/A | Resumption |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-08-20 | 837.80 | Deviate (5 - 79 degrees) |
| 2016-10-13 | 2912.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-02-20 | Multi-Stage Fracture | 5883.60 | 5883.70 | 0 |
| 2017-02-21 | Multi-Stage Fracture | 5514.80 | 5514.90 | 0 |
| 2017-03-28 | Multi-Stage Fracture | 3609.00 | 3611.00 | 0 |
| 2017-03-30 | Perforation | 3586.30 | 3588.30 | 20 |
| 2017-03-30 | Multi-Stage Fracture | 3586.30 | 3588.30 | 0 |
| 2017-03-31 | Perforation | 3557.40 | 3558.40 | 20 |
| 2017-03-31 | Perforation | 3544.40 | 3545.40 | 20 |
| 2017-03-31 | Multi-Stage Fracture | 3544.40 | 3558.40 | 0 |
| 2017-03-31 | Perforation | 3515.00 | 3516.00 | 20 |
| 2017-03-31 | Perforation | 3504.00 | 3505.00 | 20 |
| 2017-03-31 | Multi-Stage Fracture | 3504.00 | 3516.00 | 0 |
| 2017-03-31 | Perforation | 3471.00 | 3472.00 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5474.30 | 5474.40 | 0 |
| 2017-03-31 | Perforation | 3456.00 | 3457.00 | 20 |
| 2017-03-31 | Multi-Stage Fracture | 3456.00 | 3472.00 | 0 |
| 2017-04-01 | Perforation | 3430.00 | 3431.00 | 20 |
| 2017-04-01 | Perforation | 3418.00 | 3419.00 | 20 |
| 2017-04-01 | Multi-Stage Fracture | 3418.00 | 3431.00 | 0 |
| 2017-04-01 | Perforation | 3391.00 | 3392.00 | 20 |
| 2017-04-01 | Perforation | 3381.00 | 3382.00 | 20 |
| 2017-04-01 | Multi-Stage Fracture | 3381.00 | 3392.00 | 0 |
| 2017-04-01 | Perforation | 3351.00 | 3352.00 | 20 |
| 2017-04-01 | Perforation | 3341.00 | 3342.00 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5432.90 | 5433.00 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 3341.00 | 3352.00 | 0 |
| 2017-04-01 | Perforation | 3314.00 | 3315.00 | 20 |
| 2017-04-01 | Perforation | 3300.00 | 3301.00 | 20 |
| 2017-04-02 | Multi-Stage Fracture | 3300.00 | 3315.00 | 0 |
| 2017-04-02 | Perforation | 3272.00 | 3273.00 | 20 |
| 2017-04-02 | Perforation | 3263.00 | 3264.00 | 20 |
| 2017-04-02 | Multi-Stage Fracture | 3263.00 | 3273.00 | 0 |
| 2017-04-02 | Perforation | 3230.00 | 3231.00 | 20 |
| 2017-04-02 | Perforation | 3220.00 | 3221.00 | 20 |
| 2017-04-02 | Multi-Stage Fracture | 3220.00 | 3231.00 | 0 |
| 2017-02-21 | Multi-Stage Fracture | 5391.30 | 5391.40 | 0 |
| 2017-04-02 | Perforation | 3190.00 | 3191.00 | 20 |
| 2017-04-02 | Perforation | 3180.00 | 3181.00 | 20 |
| 2017-04-02 | Multi-Stage Fracture | 3180.00 | 3191.00 | 0 |
| 2017-04-02 | Perforation | 3150.00 | 3151.00 | 20 |
| 2017-04-02 | Perforation | 3139.00 | 3140.00 | 20 |
| 2017-04-03 | Multi-Stage Fracture | 3139.00 | 3151.00 | 0 |
| 2017-04-03 | Perforation | 3112.00 | 3113.00 | 20 |
| 2017-04-03 | Perforation | 3100.00 | 3101.00 | 20 |
| 2017-04-03 | Multi-Stage Fracture | 3100.00 | 3113.00 | 0 |
| 2017-04-04 | Perforation | 3074.00 | 3075.00 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5349.80 | 5349.90 | 0 |
| 2017-04-04 | Perforation | 3060.00 | 3061.00 | 20 |
| 2017-04-04 | Multi-Stage Fracture | 3060.00 | 3075.00 | 0 |
| 2017-04-05 | Perforation | 3028.00 | 3029.00 | 20 |
| 2017-04-05 | Perforation | 3015.00 | 3016.00 | 20 |
| 2017-04-05 | Multi-Stage Fracture | 3015.00 | 3029.00 | 0 |
| 2017-04-05 | Perforation | 2990.00 | 2991.00 | 20 |
| 2017-04-05 | Perforation | 2978.00 | 2979.00 | 20 |
| 2017-04-05 | Multi-Stage Fracture | 2978.00 | 2991.00 | 0 |
| 2017-04-05 | Perforation | 2953.00 | 2954.00 | 20 |
| 2017-04-05 | Perforation | 2941.00 | 2942.00 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5308.50 | 5308.60 | 0 |
| 2017-04-05 | Multi-Stage Fracture | 2941.00 | 2954.00 | 0 |
| 2017-02-21 | Multi-Stage Fracture | 5267.40 | 5267.50 | 0 |
| 2017-02-26 | Perforation | 5221.40 | 5223.40 | 13 |
| 2017-02-26 | Multi-Stage Fracture | 5221.40 | 5223.40 | 0 |
| 2017-02-26 | Perforation | 5183.40 | 5185.40 | 13 |
| 2017-02-20 | Multi-Stage Fracture | 5842.00 | 5842.10 | 0 |
| 2017-02-27 | Multi-Stage Fracture | 5183.40 | 5183.50 | 0 |
| 2017-02-27 | Perforation | 5147.40 | 5149.40 | 13 |
| 2017-02-28 | Multi-Stage Fracture | 5147.40 | 5149.40 | 0 |
| 2017-02-28 | Perforation | 5107.40 | 5109.40 | 13 |
| 2017-03-09 | Perforation | 5064.30 | 5066.30 | 13 |
| 2017-03-11 | Multi-Stage Fracture | 5064.30 | 5066.30 | 0 |
| 2017-03-11 | Perforation | 5023.40 | 5025.40 | 13 |
| 2017-03-11 | Multi-Stage Fracture | 5023.40 | 5025.40 | 0 |
| 2017-03-11 | Perforation | 4987.40 | 4989.40 | 13 |
| 2017-03-12 | Multi-Stage Fracture | 4987.40 | 4989.40 | 0 |
| 2017-02-20 | Multi-Stage Fracture | 5800.90 | 5801.00 | 0 |
| 2017-03-12 | Perforation | 4947.40 | 4949.40 | 13 |
| 2017-03-12 | Multi-Stage Fracture | 4947.40 | 4949.40 | 0 |
| 2017-03-12 | Perforation | 4907.40 | 4909.40 | 13 |
| 2017-03-13 | Multi-Stage Fracture | 4907.40 | 4909.40 | 0 |
| 2017-03-13 | Perforation | 4867.40 | 4869.40 | 13 |
| 2017-03-16 | Perforation | 4857.40 | 4859.40 | 20 |
| 2017-03-16 | Multi-Stage Fracture | 4857.40 | 4859.40 | 0 |
| 2017-03-16 | Perforation | 4827.40 | 4829.40 | 20 |
| 2017-03-16 | Multi-Stage Fracture | 4827.40 | 4829.40 | 0 |
| 2017-03-17 | Perforation | 4787.40 | 4789.40 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5759.50 | 5759.60 | 0 |
| 2017-03-17 | Multi-Stage Fracture | 4787.40 | 4789.40 | 0 |
| 2017-03-17 | Perforation | 4747.40 | 4749.40 | 20 |
| 2017-03-17 | Multi-Stage Fracture | 4747.40 | 4749.40 | 0 |
| 2017-03-17 | Perforation | 4707.40 | 4709.40 | 20 |
| 2017-03-17 | Multi-Stage Fracture | 4707.40 | 4709.40 | 0 |
| 2017-03-17 | Perforation | 4667.40 | 4669.40 | 20 |
| 2017-03-17 | Multi-Stage Fracture | 4667.40 | 4669.40 | 0 |
| 2017-03-18 | Perforation | 4627.40 | 4629.40 | 20 |
| 2017-03-18 | Multi-Stage Fracture | 4627.40 | 4629.40 | 0 |
| 2017-03-18 | Perforation | 4587.40 | 4589.40 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5718.50 | 5718.60 | 0 |
| 2017-03-18 | Multi-Stage Fracture | 4587.40 | 4589.40 | 0 |
| 2017-03-18 | Perforation | 4547.40 | 4549.40 | 20 |
| 2017-03-18 | Multi-Stage Fracture | 4547.40 | 4549.40 | 0 |
| 2017-03-19 | Perforation | 4507.40 | 4509.40 | 20 |
| 2017-03-19 | Multi-Stage Fracture | 4507.40 | 4509.40 | 0 |
| 2017-03-19 | Perforation | 4467.40 | 4469.40 | 20 |
| 2017-03-19 | Multi-Stage Fracture | 4467.40 | 4469.40 | 0 |
| 2017-03-19 | Perforation | 4427.40 | 4429.40 | 20 |
| 2017-03-19 | Multi-Stage Fracture | 4427.40 | 4429.40 | 0 |
| 2017-03-20 | Perforation | 4387.40 | 4389.40 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5677.50 | 5677.60 | 0 |
| 2017-03-20 | Multi-Stage Fracture | 4387.40 | 4389.40 | 0 |
| 2017-03-20 | Perforation | 4347.40 | 4349.40 | 20 |
| 2017-03-20 | Multi-Stage Fracture | 4347.40 | 4349.40 | 0 |
| 2017-03-20 | Perforation | 4309.60 | 4311.60 | 20 |
| 2017-03-20 | Multi-Stage Fracture | 4309.60 | 4311.60 | 0 |
| 2017-03-20 | Perforation | 4267.40 | 4269.40 | 20 |
| 2017-03-21 | Multi-Stage Fracture | 4267.40 | 4269.40 | 0 |
| 2017-03-21 | Perforation | 4227.40 | 4229.40 | 20 |
| 2017-03-21 | Multi-Stage Fracture | 4227.40 | 4229.40 | 0 |
| 2017-03-21 | Perforation | 4187.40 | 4189.40 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5637.20 | 5637.30 | 0 |
| 2017-03-21 | Multi-Stage Fracture | 4187.40 | 4189.40 | 0 |
| 2017-03-21 | Perforation | 4147.40 | 4149.40 | 20 |
| 2017-03-22 | Multi-Stage Fracture | 4147.40 | 4149.40 | 0 |
| 2017-03-22 | Perforation | 4107.70 | 4109.70 | 20 |
| 2017-03-22 | Multi-Stage Fracture | 4107.70 | 4109.70 | 0 |
| 2017-03-22 | Perforation | 4068.30 | 4070.30 | 20 |
| 2017-03-22 | Multi-Stage Fracture | 4068.30 | 4070.30 | 0 |
| 2017-03-22 | Perforation | 4026.40 | 4028.40 | 20 |
| 2017-03-22 | Multi-Stage Fracture | 4026.40 | 4028.40 | 0 |
| 2017-03-23 | Perforation | 3987.40 | 3989.40 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5596.30 | 5596.40 | 0 |
| 2017-03-23 | Multi-Stage Fracture | 3987.40 | 3989.40 | 0 |
| 2017-03-23 | Perforation | 3947.40 | 3949.40 | 20 |
| 2017-03-23 | Multi-Stage Fracture | 3947.40 | 3949.40 | 0 |
| 2017-03-24 | Perforation | 3907.40 | 3909.40 | 20 |
| 2017-03-24 | Multi-Stage Fracture | 3907.40 | 3909.40 | 0 |
| 2017-03-24 | Perforation | 3868.10 | 3870.10 | 20 |
| 2017-03-24 | Multi-Stage Fracture | 3868.10 | 3870.10 | 0 |
| 2017-03-24 | Perforation | 3830.10 | 3832.10 | 20 |
| 2017-03-24 | Multi-Stage Fracture | 3830.10 | 3832.10 | 0 |
| 2017-03-24 | Perforation | 3787.40 | 3789.40 | 20 |
| 2017-02-21 | Multi-Stage Fracture | 5555.50 | 5555.60 | 0 |
| 2017-03-25 | Multi-Stage Fracture | 3787.40 | 3789.40 | 0 |
| 2017-03-25 | Perforation | 3747.40 | 3749.40 | 20 |
| 2017-03-25 | Multi-Stage Fracture | 3747.40 | 3749.40 | 0 |
| 2017-03-25 | Perforation | 3707.40 | 3709.40 | 20 |
| 2017-03-25 | Multi-Stage Fracture | 3707.40 | 3709.40 | 0 |
| 2017-03-25 | Perforation | 3663.40 | 3665.40 | 20 |
| 2017-03-26 | Multi-Stage Fracture | 3663.40 | 3665.40 | 0 |
| 2017-03-26 | Perforation | 3623.40 | 3625.40 | 20 |
| 2017-03-26 | Multi-Stage Fracture | 3623.40 | 3625.40 | 0 |
| 2017-03-28 | Perforation | 3609.00 | 3611.00 | 20 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-02-20 | 2017-04-05 | 2,746 | 47,760 | N/A |
| 2 | 2017-03-11 | 2017-04-03 | 2,746 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 86.3886 | N/A | |||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 13.0619 | N/A | ||
| 15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.6147 | N/A | |
| Water | 7732-18-5 | 100 | 0.6147 | N/A | ||||
| DWP-944 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0125 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0125 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.081 | N/A | |
| CI-9100G | Calfrac | Corrosion Inhibitor | Alcohols. C12-15. ethoxylated | 68131-39-5 | 100 | 0.0019 | N/A | |
| Cinnamaldehyde | 104-55-2 | 100 | 0.0019 | N/A | ||||
| Dipropylene glycol monomethyl ether | 34590-94-8 | 100 | 0.0019 | N/A | ||||
| Ethylene Glycol | 107-21-1 | 100 | 0.0019 | N/A | ||||
| Formic acid | 64-18-6 | 100 | 0.0019 | N/A | ||||
| Isopropyl alcohol | 67-63-0 | 100 | 0.0019 | N/A | ||||
| Tar bases. quinoline derivs. | 68513-87-1 | 100 | 0.0019 | N/A | ||||
| Tar bases. quinolone derivs.. benzyl chloride-quarternized | 72480-70-7 | 100 | 0.0019 | N/A | ||||
| DWP-959 | Calfrac | Demulsifier | Methanol | 67-56-1 | 100 | 0.0837 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0837 | N/A | ||||
| CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1067 | N/A | |
| 2 | DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0097 | N/A |
| Water | 7732-18-5 | 100 | 0.0097 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-12-12 | 2016-12-21 | Surface Water - River | 44727 |
| 2016-11-05 | 2016-12-04 | Surface Water - River | 3123 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 5218 | 0.0 | 0.0 | 0.0 |
| 2018 | 8090 | 0.0 | 0.0 | 0.0 |
| 2019 | 8550 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-11-06 | No Incident Encountered | 0.00 | 0.00 |
| 2017-04-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]